EPA-Approved Source-Specific Requirements: Sacramento AQMD, San Joaquin Valley Unified APCD, South Coast AQMD
EPA-Approved Source-Specific Requirements for the Sacramento Metropolitan Air Quality Management District (AQMD), San Joaquin Valley Unified Air Pollution Control District (APCD), and South Coast Air Quality Management District (AQMD), incorporated by reference in the applicable State Implementation Plan (SIP).
EPA's Pacific Southwest Office maintains these tables and will update them to reflect any changes in the official tables codified in the Code of Federal Regulations. To find the status of SIP submittals, visit SIP Status Reports.
Compiled Codes and Regulations
- EPA-Approved Source-Specific Requirements: San Joaquin Valley Unified APCD (pdf)
- EPA-Approved Source-Specific Requirements for Sacramento Metropolitan Air Quality Management District (AQMD) (pdf)
Tables of Codes and Regulations
Sacramento Metropolitan Air Quality Management District (AQMD)
Name of Source | Order/Permit No. | Effective Date | EPA Approval Date | Explanation |
---|---|---|---|---|
Keifer Landfill | Permit to Operate for the Kiefer Landfill (“Permit to Operate No. 17359 (Rev01)”) | November 13, 2006 | April 12, 2011, 76 FR 20242 | Submitted on July 11, 2007. See 40 CFR 52.220(c)(382)(i)(A)(1). |
Keifer Landfill | Permit to Operate No. 24360 — Air Pollution Control Landfill Gas Flare No. 1, Enclosed Type, with Attachment A | April 14, 2016 | December 4, 2017, 82 FR 57130 | Submitted on January 24, 2017. See 40 CFR 52.220(c)(497)(i)(A)(1). |
Keifer Landfill | Permit to Operate No. 24361 — Air Pollution Control Landfill Gas Flare No. 2, Enclosed Type, with Attachment A | April 14, 2016 | December 4, 2017, 82 FR 57130 | Submitted on January 24, 2017. See 40 CFR 52.220(c)(497)(i)(A)(2). |
Mitsubishi Chemical Carbon Fiber and Composites Inc. | Permit to Operate No. 24611 – Eisenmann Oxidation Oven (Oven #1) | February 23, 2024 | September 25, 2024, 89 FR 78255 | Submitted on April 11, 2024, as an attachment to a letter dated April 10, 2024. See 40 CFR 52.220(c)(617)(i)(A)(1). |
Mitsubishi Chemical Carbon Fiber and Composites Inc. | Permit to Operate No. 25925 – Maxon Oxidation Oven (Oven #2) | February 23, 2024 | September 25, 2024, 89 FR 78255 | Submitted on April 11, 2024, as an attachment to a letter dated April 10, 2024. See 40 CFR 52.220(c)(617)(i)(A)(2). |
Mitsubishi Chemical Carbon Fiber and Composites Inc. | Permit to Operate No. 24613 – Eisenmann Oxidation Oven (Oven #3) | February 23, 2024 | September 25, 2024, 89 FR 78255 | Submitted on April 11, 2024, as an attachment to a letter dated April 10, 2024. See 40 CFR 52.220(c)(617)(i)(A)(3). |
Mitsubishi Chemical Carbon Fiber and Composites Inc. | Permit to Operate No. 24614 – Eisenmann Oxidation Oven (Oven #4) | February 23, 2024 | September 25, 2024, 89 FR 78255 | Submitted on April 11, 2024, as an attachment to a letter dated April 10, 2024. See 40 CFR 52.220(c)(617)(i)(A)(4). |
Mitsubishi Chemical Carbon Fiber and Composites Inc. | Permit to Operate No. 27336 – Despatch Oxidation Oven, Line 31 | February 23, 2024 | September 25, 2024, 89 FR 78255 | Submitted on April 11, 2024, as an attachment to a letter dated April 10, 2024. See 40 CFR 52.220(c)(617)(i)(A)(5). |
Mitsubishi Chemical Carbon Fiber and Composites Inc. | Permit to Operate No. 27337 – Despatch Oxidation Oven, Line 31 | February 23, 2024 | September 25, 2024, 89 FR 78255 | Submitted on April 11, 2024, as an attachment to a letter dated April 10, 2024. See 40 CFR 52.220(c)(617)(i)(A)(6). |
Mitsubishi Chemical Carbon Fiber and Composites Inc. | Permit to Operate No. 27338 – Cleaver Brooks Boiler | February 23, 2024 | September 25, 2024, 89 FR 78255 | Submitted on April 11, 2024, as an attachment to a letter dated April 10, 2024. See 40 CFR 52.220(c)(617)(i)(A)(7). |
UCD Medical Center | Permit to Operate No. 17549 – General Electric Gas Turbine | February 23, 2024 | September 25, 2024, 89 FR 78255 | Submitted on April 11, 2024, as an attachment to a letter dated April 10, 2024. See 40 CFR 52.220(c)(617)(i)(A)(8). |
UCD Medical Center |
Permit to Operate No. 20216 – Johnston Boiler Company Boiler (Boiler No. 1); Permit to Operate No. 20217 – Johnston Boiler Company Boiler (Boiler No. 2); Permit to Operate No. 20218 – Johnston Boiler Company Boiler (Boiler No. 3); Permit to Operate No. 20219 – Johnston Boiler Company Boiler (Boiler |
February 23, 2024 | September 25, 2024, 89 FR 78255 | Submitted on April 11, 2024, as an attachment to a letter dated April 10, 2024. See 40 CFR 52.220(c)(617)(i)(A)(9). |
Sacramento Municipal Utility District Financing Authority DBA Procter and Gamble Power Plant | Permit to Operate No. 27140 – Babcock & Wilcox Boiler | February 23, 2024 | September 25, 2024, 89 FR 78255 | Submitted on April 11, 2024, as an attachment to a letter dated April 10, 2024. See 40 CFR 52.220(c)(617)(i)(A)(10). |
Sacramento Municipal Utility District Financing Authority DBA Procter and Gamble Power Plant |
Permit to Operate No. 27141 – General Electric Gas Turbine, Unit 1A; Permit to Operate No. 27132 – Duct Burner Unit 1A |
February 23, 2024 | September 25, 2024, 89 FR 78255 | Submitted on April 11, 2024, as an attachment to a letter dated April 10, 2024. See 40 CFR 52.220(c)(617)(i)(A)(11). |
Sacramento Municipal Utility District Financing Authority DBA Procter and Gamble Power Plant |
Permit to Operate No. 27142 – General Electric Gas Turbine, Unit 1B; Permit to Operate No. 27133 – Duct Burner Unit 1B |
February 23, 2024 | September 25, 2024, 89 FR 78255 | Submitted on April 11, 2024, as an attachment to a letter dated April 10, 2024. See 40 CFR 52.220(c)(617)(i)(A)(12). |
Sacramento Municipal Utility District Financing Authority DBA Procter and Gamble Power Plant | Permit to Operate No. 27143 – General Electric Gas Turbine, Unit 1C | February 23, 2024 | September 25, 2024, 89 FR 78255 | Submitted on April 11, 2024, as an attachment to a letter dated April 10, 2024. See 40 CFR 52.220(c)(617)(i)(A)(13). |
Sacramento Municipal Utility District Financing Authority DBA Procter and Gamble Power Plant | Permit to Operate No. 27144 – Cleaver Brooks Boiler Unit 1B | February 23, 2024 | September 25, 2024, 89 FR 78255 | Submitted on April 11, 2024, as an attachment to a letter dated April 10, 2024. See 40 CFR 52.220(c)(617)(i)(A)(14). |
Sacramento Municipal Utility District Financing Authority (SFA)—Cosumnes Power Plant | Permit to Operate No. 25801 – General Electric Gas Turbine, No. 2 | February 23, 2024 | September 25, 2024, 89 FR 78255 | Submitted on April 11, 2024, as an attachment to a letter dated April 10, 2024. See 40 CFR 52.220(c)(617)(i)(A)(15). |
Sacramento Municipal Utility District Financing Authority (SFA)—Cosumnes Power Plant | Permit to Operate No. 25800 – General Electric Gas Turbine, No. 3 | February 23, 2024 | September 25, 2024, 89 FR 78255 | Submitted on April 11, 2024, as an attachment to a letter dated April 10, 2024. See 40 CFR 52.220(c)(617)(i)(A)(16). |
Sacramento Municipal Utility District Financing Authority DBA Campbell Power Plant |
Permit to Operate No. 27118 – Siemens Gas Turbine; Permit to Operate No. 27116 – Duct Burner |
February 23, 2024 | September 25, 2024, 89 FR 78255 | Submitted on April 11, 2024, as an attachment to a letter dated April 10, 2024. See 40 CFR 52.220(c)(617)(i)(A)(17). |
Sacramento Municipal Utility District Financing Authority DBA Carson Power Plant |
Permit to Operate No. 27151 – General Electric Gas Turbine; Permit to Operate No. 27153 – Duct Burner |
February 23, 2024 | September 25, 2024, 89 FR 78255 | Submitted on April 11, 2024, as an attachment to a letter dated April 10, 2024. See 40 CFR 52.220(c)(617)(i)(A)(18). |
Sacramento Municipal Utility District Financing Authority DBA Carson Power Plant | Permit to Operate No. 27154 – Cleaver Brooks Boiler | February 23, 2024 | September 25, 2024, 89 FR 78255 | Submitted on April 11, 2024, as an attachment to a letter dated April 10, 2024. See 40 CFR 52.220(c)(617)(i)(A)(19). |
Sacramento Municipal Utility District Financing Authority DBA Carson Power Plant | Permit to Operate No. 27156 – General Electric Gas Turbine | February 23, 2024 | September 25, 2024, 89 FR 78255 | Submitted on April 11, 2024, as an attachment to a letter dated April 10, 2024. See 40 CFR 52.220(c)(617)(i)(A)(20). |
San Joaquin Valley Unified Air Pollution Control District (APCD)
Name of Source | Order/Permit No. | Effective Date | EPA Approval Date | Explanation |
---|---|---|---|---|
J.R. Simplot Company, Nitric Acid Plant, Helm, CA | Permit #C–705–3–19 | June 21, 2018 | August 17, 2018, 83 41006 | Adopted by the SJVUAPCD, Resolution No. 18–06–14, June 21, 2018. Submitted on June 29, 2018. See 40 CFR 52.220(c)(507)(i)(A)(1). |
South Coast Air Quality Management District (AQMD)
Name of Source | Order/Permit No. | Effective Date | EPA Approval Date | Explanation |
---|---|---|---|---|
63500 19th Ave., North Palm Springs, CA 92258 | Facility Permit to Operate (includes only the title page, table of contents, section A (page 1), and section D (pages 1–21)) | July 7, 2017 | September 20, 2017, 82 FR 43850 | Submitted on July 27, 2017 as appendix A to the Supplemental RACM/RACT Analysis for the NOx RECLAIM Program. See 40 CFR 52.220(c)(492)(i)(A)(1). |
15775 Melissa Lane Rd, North Palm Springs, CA 92258 | Facility Permit to Operate (includes only the title page, table of contents, section A (page 1), and section D (pages 1–49)) | July 7, 2017 | September 20, 2017, 82 FR 43850 | Submitted on July 27, 2017 as appendix B to the Supplemental RACM/RACT Analysis for the NOx RECLAIM Program. See 40 CFR 52.220(c)(492)(i)(A)(2). |
62575 Power Line Road, Desert Hot Springs, CA 92440 | Resolution No. 10-20 | July 9, 2010 | April 20, 2011, 76 FR 22038 | Submitted on September 10, 2010. See 40 CFR 52.220(c)(384)(i)(A)(1), (2) and (3). Includes two documents incorporated by reference in Resolution 10-20: “Revision to the State Implementation Plan for the South Coast Air Quality Management District, State of California: Sulfur Oxides and Particulate Matter Offset Requirements for the Proposed CPV Sentinel Power Plant to be Located in Desert Hot Springs, California, Including AB 1318 Offset Tracking System” and “CPV Sentinel Energy Project AB 1318 Tracking System.” See also 77 FR 67767 (November 14, 2012). |