Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Registration Total results: 9
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
- Renewable Fuel Standard (RFS2) Total results: 111
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Work Practice Standards Total results: 41
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 56 results
-
Where can I find older NEI data (prior to 2008)?
The raw data and summaries that are still available (dating back to 1990) can be obtained from the web page https://www.epa.gov/air-emissions-inventories/pollutant-emissions-summary-files-earlier-neis . Starting with 2001 data, a more limited selection of summary files are available.
- Last published:
-
If a door is outside the work area but used by workers to enter and exit the room, does the door need to be covered with plastic?
If the work area is smaller than the entire room, and the door is not within the work area, you do not need to cover the door with plastic. However, all personnel, tools, and other items, including the exterior of containers of waste, must be free of dust and debris…
- Last published:
-
For an exterior renovation where vertical containment is set up at a distance of less than ten feet from the work surface, must we still extend the ground containment beyond the vertical barrier to meet the ten-foot requirement?
My firm replaces windows. Various obstacles make it difficult to set up the ten-foot exterior ground containment in a way that would enable our renovators to perform the work and still effectively contain dust. In these cases, we lay the ground containment, but also use vertical containment measures to completely…
- Last published:
-
In the EPA Certified Renovator Initial course, plastic sheeting is taped to the floor at several corners, but not around the entire perimeter. Must the plastic be "sealed" to the floor on all four edges by tape or just taped at several locations?
It depends on the specifics of the renovation job. The RRP Rule requires the renovation firm to cover the floor surface, including installed carpet, with taped-down plastic sheeting or other impermeable material in the work area 6 feet beyond the perimeter of surfaces undergoing renovation or a sufficient distance to…
- Last published:
-
What are the requirements for covering doorways used to access the work area?
Doors used as an entrance to the work area must be covered with plastic sheeting or other impermeable material in a manner that allows workers to pass through while confining dust and debris to the work area. Question Number: 23002-21413 Find a printable PDF copy of all frequent questions pertaining…
- Last published:
-
To avoid harming the homeowner's grass and landscaping, may my firm fold up the plastic sheeting used for containment at night and re-use it the next day?
Yes, as long as your firm does so in a way that contains any dust and debris on the plastic. One way to accomplish this is to collect and remove the paint chips and debris from the plastic sheeting at the end of each day, mist the sheeting and fold…
- Last published:
-
What mil plastic is considered impermeable?
The regulation does not specify a particular thickness of plastic sheeting considered to be impermeable, but rather includes a performance standard. The performance standard requires firms to isolate the work area, prevent dust and debris from exiting and ensure plastic sheeting is not torn or displaced. Certain guidance materials recommend…
- Last published:
-
When must scaffolding and vertical shrouding be used on an exterior renovation when other buildings are in close proximity to the work area?
The certified renovator or a worker under the direction of the certified renovator must contain the work area so that dust or debris does not leave the work area while the renovation is being performed. The certified renovator must be on site while the containment is established and is responsible…
- Last published:
-
What, if any, additional requirements or liabilities exist if a homeowner independently removes the protective barriers and containment measures implemented by the firm during a renovation?
Before a firm begins a renovation, they are required to comply with all information distribution requirements under the Lead Renovation, Repair and Painting (RRP) Rule and to post signs that clearly define the work area and warn occupants and other persons not involved in renovation activities to remain outside of…
- Last published:
-
Who is responsible for controlling dust and debris from renovation waste once the waste container or truck used to transport the waste leaves the renovation site?
When a renovation firm transports waste from renovation activities, the firm must contain the waste to prevent release of dust and debris. The Lead Renovation, Repair and Painting (RRP) Rule does not address the responsibilities of other entities. EPA recommends consulting with state and local waste disposal authorities to learn…
- Last published:
-
In a situation where an importer leases tankage from another company, e.g., from a for-hire terminal, who must register such import facility, the company that owns the terminal, the importer that leases the tankage, or both?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Under § 80.2(r), an importer is defined as "a person who imports gasoline or gasoline blending stocks or components from a foreign country into the United States...." Accordingly, it is the importer of the gasoline, and not the…
- Last published:
-
If my fuel is already registered with the Fuels and Fuel Additives program under 40 CFR Part 79, do I still need to register with the RFS2 program under 40 CFR Part 80?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. Even if your fuel or fuel additive is already registered under 40 CFR Part 79, there are additional registration requirements for parties regulated under the RFS2 program, as specified in 40 CFR 80.1450.
- Last published:
-
Once I register my fuel for the RFS2 program under §80.1450, do I still need to register my fuel under 40 CFR Part 79?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. Renewable fuels intended for use or used in motor vehicles are required to be registered under 40 CFR part 79 prior to any introduction into commerce. Manufacturers of renewable fuels and fuel additives not registered under part…
- Last published:
-
Are biogenic emissions included in the emissions trends Tier 1 data?
No, the biogenic emissions are not included in the emissions trends Tier 1 data. If needed, users can add the biogenic data either as a separate Tier, or specify its inclusion in the “Miscellaneous” Tier 1 group.
- Last published:
-
Do I need to cover a closet door with plastic?
Answer: Yes, if the door is inside the work area. When containing the work area during an interior renovation, the firm must close windows and doors in the work area. Doors must be covered with plastic sheeting or other impermeable material. Question Number: 23002-15162 Find a printable PDF copy of…
- Last published: