Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- Definition of "Renovation" Total results: 17
- Child-Occupied Facilities Total results: 5
- Emergency Renovations Total results: 5
- In General Total results: 9
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Other Risk Management Programs Total results: 35
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- Program Levels Total results: 16
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 53 results
-
Obtaining an RMP ID Number
How can a facility subject to the Risk Management Plan (RMP) requirements obtain its RMP ID number? The owner or operator of a regulated RMP facility that has already submitted an RMP, may obtain the facility's identification number (RMP ID Number) by contacting the RMP Reporting Center (703-227-7650). An RMP-covered…
- Last published:
-
Does EPA have enforcement authority for the risk management program regulations?
Yes. Under §113 of the CAA, the Agency has the authority to bring administrative and judicial actions against violators. Judicial actions can be civil and criminal in nature. Section 113(a)(3) authorizes the Agency to order violators to comply with the risk management program regulations. Under section 113(b), the Agency may…
- Last published:
-
Criteria for selecting stationary sources to audit
What criteria will be used to select stationary sources for periodic compliance audits of risk management plans (RMPs) submitted under 40 CFR Part 68, Subpart G? The implementing agency will, according to the regulations at 40 CFR §68.220(b), select stationary sources for audits based on any of the following criteria…
- Last published:
-
Is there a citizen suit provision applicable to RMP?
Is there a citizen suit provision applicable to CAA §112 and the risk management program rule? Yes, section 304 of the CAA includes a citizen suit provision for violations of emission standards or limitations promulgated under the Act.
- Last published:
-
Accessing RMP Data
Is Risk Management Plan (RMP) data available to the public and, if so, where can it be found? Risk Management Plans (RMPs) prepared and submitted pursuant to CAA section 112(r) are, by statute, available to the public. Members of the general public may obtain RMP data by visiting a designated…
- Last published:
-
How may state and local rules be more stringent?
In what ways may state and local rules be more stringent? Does this document ( General Risk Management Program Guidance ) provide guidance on state and local differences? States and localities may impose more detailed requirements, such as requiring more documentation or more frequent reporting, specifying hours of training or…
- Last published:
-
What is a renovation?
The Lead Renovation, Repair, and Painting (RRP) Rule covers activities that modify an existing structure and that result in the disturbance of painted surfaces. All types of repair, remodeling, maintenance, modernization, and weatherization projects are covered, including projects performed as part of another Federal, State, or local program, if the…
- Last published:
-
When installing a roof, my firm does not create dust by directly sanding or cutting painted surfaces, but we do hammer the unpainted side of the lumber from above. Does the RRP Rule apply to this work?
The Lead Renovation, Repair, and Painting (RRP) Rule applies to work that disturbs painted surfaces. If hammering painted components, even on the unpainted side, disturbs paint, creating dust or chips, the RRP Rule applies. Question Number: 23002-23787 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Statutory authority and regulatory source for the risk management program
What is the statutory authority and the regulatory source for the risk management program regulations that are codified in 40 CFR Part 68? The risk management program regulations were promulgated pursuant to the §112(r) accidental release prevention provisions of the Clean Air Act, as amended in 1990. The regulatory sources…
- Last published:
-
RMP Information Center
If I have additional questions regarding the RMP regulations, who can I contact via telephone for further assistance? You may contact the EPCRA, RMP & Oil Information Center, a publicly accessible service that provides up-to-date information on the regulatory requirements of the RMP program, including the applicability, program levels, off-site…
- Last published:
-
Are renovations that disturb stucco subject to the RRP Rule? Does it matter whether the stucco has been painted?
Answer: The Lead Renovation, Repair, and Painting (RRP) Rule applies to work that disturbs painted surfaces. Therefore, renovations that disturb stucco are subject to the RRP Rule only if the stucco has been painted. Question Number: 23002-14025 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Are Department of Energy weatherization projects covered under the RRP Rule?
Answer : The Lead Renovation, Repair, and Painting (RRP) Rule defines “renovation” to include weatherization projects such as cutting holes in painted surfaces to install blown-in insulation or to gain access to attics, and planing thresholds to install weather stripping. Other types of weatherization projects, such as window replacement, are…
- Last published:
-
If I am painting a wall on which there are multiple coats of latex paint over the old lead-based paint and the paint is not peeling down to the lead paint level must I comply with the new Renovation, Repair, and Painting (RRP) regulations?
Yes, if the painted surface of the wall will be disturbed by the renovation. Question Number: 23002-18485 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
If a homeowner removes all the painted surfaces in a room and then hires a certified firm to remodel the room, does the renovator need to follow the RRP Rule?
No. Projects that do not disturb a painted surface are not subject to the RRP Rule. Question Number: 23002-18301 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Vulnerable Zone Determination
Vulnerable zones are areas that could be affected by a release from a chemical accident at a facility subject to the risk management program requirements in 40 CFR Part 68. How can one determine if they live or work within a vulnerable zone? The Vulnerable Zone Indicator System (VZIS) allows…
- Last published: