Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Taggart Street Reopening Total results: 12
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 55 results
-
What is a reactive and non-reactive solid EHS?
Reactive solid means any extremely hazardous substance denoted with “a” in the “Notes” column in Appendix A or B of 40 CFR 355. Reactive solids are more likely than other solids to be dispersed into the air due to the energy or heat created from their reactivity with water or…
- Last published:
-
How did states form their SERCs?
How are States expected to form their State Emergency Response Commission (SERC) as required under Title III? States are required to establish a State Emergency Response Commission (SERC) under Title III. The SERC may consist of existing emergency response organizations or may be an entirely new mechanism to address this…
- Last published:
-
Pesticide applicator quantity applied to threshold or transportation exemption
A farmer contracts with an applicator to spray pesticides on his fields. The applicator drives a tank truck onto the farmers' field and sprays the pesticide from the truck onto the fields. For purposes of Section 302 emergency planning requirements, are the EHSs in the truck considered present at the…
- Last published:
-
State refusing to comply with the emergency planning provisions
What will happen if a State refuses to comply with the emergency planning provisions? A governor who does not designate a State emergency response commission becomes the commission by default. While the governor could choose not to fulfill any of the Title III provisions, the public could still request information…
- Last published:
-
Section 302 notification requirements and mixtures with unknown components
Are facilities exempt from Section 302 notification requirements if they produce, use, or store mixtures whose extremely hazardous substance component information is not available on the MSDS provided by the manufacturer? If the facility which produces, uses, or stores mixtures knows or reasonably should know the components of the mixture…
- Last published:
-
Underground Storage Tanks in SPCC Plans
If a gas station that has less than 42,000 gallons completely buried oil storage capacity and no aboveground oil storage capacity installs a new aboveground tank with a capacity greater than 1,320 gallons, must the facility’s Spill Prevention, Control, and Countermeasure (SPCC) Plan address the underground storage tanks (USTs) in…
- Last published:
-
Container capacity less than 55 gallons
Do facilities need to consider containers that are less than 55 gallons for applicability under 40 CFR Part 112? No. The third column of page 47066 of the July 17, 2002 Preamble states that "You need only count containers of 55 gallons or greater in the calculation of the regulatory…
- Last published:
-
Oil-filled equipment capacity
When counting against the 1,320 aboveground storage capacity threshold, would operational storage of oil (such as in a hydraulic press) be used? Oil which is contained in equipment is required to be factored into the storage capacity for the facility even though the oil may be only used for ancillary…
- Last published:
-
If your farm does not have fuel storage that will flow into US waters by a ditch, river, stream, or lake, do you have to prepare a SPCC Plan?
No. EPA suggests you use a common sense approach. If one of your oil storage tanks leaks, and the spilled oil would not flow into navigable waters or adjoining shorelines, you do not have to prepare a Plan. Remember that you still have the responsibility to clean up any spilled…
- Last published:
-
Ground water pathways related to reasonably expected to discharge
The SPCC Rule applies to facilities that could reasonably be expected to discharge into navigable waters (40 CFR §112.2(a)). Does a facility need to consider ground water pathways when determining if a discharge of oil could reasonably be expected to reach navigable waters? Owners and operators should consider whether on-site…
- Last published:
-
SPCC responsibility for tanks on leased property
What if I leased some parcels, and there are tanks already present? Am I responsible for these tanks? You could be. If you plan to use these tanks, make sure in your lease agreement, it states who is responsible for these tanks. If the lease does not state who is…
- Last published:
-
What is the “reduced speed” near work areas? When will the speed limit return to normal?
The reduced speed near work areas on Taggart Street is 15 miles per hour. Be aware that air monitoring vans drive at 10 miles per hour and no passing is permitted. Please obey reduced speed signage to ensure safety of workers and work vehicles. Speed restrictions will continue until final…
- Last published:
-
What hours will truck traffic be present? About how frequent and how long are wait times expected to be?
Most truck traffic on Taggart occurs from 6 a.m. to 6 p.m. Vac trucks and support vehicles will continue to use the street through overnight hours. During traffic interruptions, wait times will likely vary from 15 to 30 minutes and may occur often throughout the day.
- Last published:
-
Are there health risks to driving through Taggart Street?
There are no anticipated health risks along Taggart Street associated with project activities. As work proceeds, to ensure worker and community safety, the Unified Command will continue to evaluate site conditions for health and safety considerations. While traffic will be able to proceed through the work areas along Taggart Street…
- Last published:
-
TPQ calculations for hazardous substances in molten form
Facilities are subject to emergency planning and notification requirements under EPCRA (also known as SARA Title III) when an extremely hazardous substance (EHS) is present at a facility in an amount equal to or in excess of its TPQ. For some EHSs that are solids, two TPQs are given (e.g…
- Last published: