Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Generation of RINs Total results: 6
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Grandfathering Total results: 8
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
-
Renovations Covered by the RRP Rule
Total results: 84
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- Emergency Renovations Total results: 5
- In General Total results: 9
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
-
Renovations Covered by the RRP Rule
Total results: 84
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 115 results
-
What is a reactive and non-reactive solid EHS?
Reactive solid means any extremely hazardous substance denoted with “a” in the “Notes” column in Appendix A or B of 40 CFR 355. Reactive solids are more likely than other solids to be dispersed into the air due to the energy or heat created from their reactivity with water or…
- Last published:
-
How did states form their SERCs?
How are States expected to form their State Emergency Response Commission (SERC) as required under Title III? States are required to establish a State Emergency Response Commission (SERC) under Title III. The SERC may consist of existing emergency response organizations or may be an entirely new mechanism to address this…
- Last published:
-
Pesticide applicator quantity applied to threshold or transportation exemption
A farmer contracts with an applicator to spray pesticides on his fields. The applicator drives a tank truck onto the farmers' field and sprays the pesticide from the truck onto the fields. For purposes of Section 302 emergency planning requirements, are the EHSs in the truck considered present at the…
- Last published:
-
State refusing to comply with the emergency planning provisions
What will happen if a State refuses to comply with the emergency planning provisions? A governor who does not designate a State emergency response commission becomes the commission by default. While the governor could choose not to fulfill any of the Title III provisions, the public could still request information…
- Last published:
-
Section 302 notification requirements and mixtures with unknown components
Are facilities exempt from Section 302 notification requirements if they produce, use, or store mixtures whose extremely hazardous substance component information is not available on the MSDS provided by the manufacturer? If the facility which produces, uses, or stores mixtures knows or reasonably should know the components of the mixture…
- Last published:
-
Can a gallon of ethanol generate more than 1.0 RIN in RFS2?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The number of RINs that can be generated for each gallon of renewable fuel are determined by the Equivalence Values. See 80.1415 and 80.1426(f)(2)-(6). Equivalence Values are based on energy content in the renewable fuel in comparison to…
- Last published:
-
If I produce biodiesel using waste vegetable oil, can I generate more RINs per gallon than if I use virgin soy oil? Would the use of solar panels as a heat source for our process help with our RIN number per gallon?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The number of RINs that can be generated for each gallon of renewable fuel is determined by the Equivalence Values. See regulations at 80.1415(b) and 8.1426(f)(2)(i), for example. Equivalence Values are based on energy content in the renewable…
- Last published:
-
A home sustained flooding as a result of a hurricane. Once the flood water recedes, my firm must make the necessary renovations. How do the record keeping requirements apply to an emergency renovation?
Emergency renovations (other than interim controls performed in response to a child with an elevated blood lead level) are exempt from the training, certification, sign posting, waste handling and containment requirements of the Lead Renovation, Repair and Painting (RRP) Rule only to the extent necessary to respond to the emergency…
- Last published:
-
Does the Renovation, Repair, and Painting (RRP) Rule apply to renovations done in an apartment between tenants? Does it matter if children live in other apartments in the building?
Answer: Temporarily unoccupied or vacant rental housing is not exempt from the requirements of the RRP Rule. Question Number: 23002-15669 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Does drilling holes in window frames to install window treatments such as shades and shutters qualify as minor repair and maintenance?
Yes, as long as the installation does not disturb more than six square feet of painted surface per room within a 30-day period. Question Number: 23002-15404 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Are renovations performed on detached garages, sheds and other detached outbuildings on the property subject to the RRP Rule?
Yes. EPA interprets target housing to include pre-1978 buildings or structures that are (1) located on the residential portion of the property, and (2) associated with the residential use of the property. As a practical matter, the entire property of most urban and suburban residential lots is normally considered to…
- Last published:
-
I have a for-profit business where I purchase residential properties and renovate them. Is this type of renovation work on pre-1978 properties covered by the Lead Renovation, Repair, and Painting (RRP) Rule?
Yes. Individuals who buy, renovate and sell pre-1978 residential properties for a profit (i.e., house flippers) or lease pre-1978 residential properties (i.e., landlords), and do the renovation work themselves, are performing renovations for compensation and are therefore subject to all requirements under the RRP Rule . You must be a…
- Last published:
-
How do the RRP requirements apply to renovations on a pre-1978 building that contains both multi-room apartments (i.e., target housing) and zero-bedroom dwellings?
In pre-1978 buildings that contain a mix of target housing and zero-bedroom dwellings, the Lead Renovation, Repair, and Painting (RRP) Rule applies only to renovations performed in target housing and common areas. Common areas are those portions of a property generally accessible to residents/users of target housing, and can exist…
- Last published:
-
Does zoning affect the target housing determination? For example, would a pre-1978 house that is zoned for commercial or office use, but used for residential purposes be considered target housing?
In determining whether a pre-1978 property is target housing, it is the actual or intended use of the property that matters, not its zoning classification. Therefore, a pre-1978 house that is used or intended to be used as a residence, even if only temporary, is target housing regardless of its…
- Last published:
-
If a renovator disrupts 20 square feet or less of painted surface per side on several sides of the exterior of one property, does the RRP Rule apply?
Yes. To qualify for the exception for minor repair and maintenance activities, the total amount of exterior paint disrupted must be 20 square feet or less. In addition, the job must not use prohibited practices or involve window replacement or demolition of painted surfaces. Question Number: 23002-18379 Find a printable…
- Last published: