Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Emergency Planning (EPCRA 301-303)
- Administrative
- 112.8 Specific Onshore Requirements (Excluding Production)
Displaying 1 - 15 of 59 results
-
What is a reactive and non-reactive solid EHS?
Reactive solid means any extremely hazardous substance denoted with “a” in the “Notes” column in Appendix A or B of 40 CFR 355. Reactive solids are more likely than other solids to be dispersed into the air due to the energy or heat created from their reactivity with water or…
- Last published:
-
How did states form their SERCs?
How are States expected to form their State Emergency Response Commission (SERC) as required under Title III? States are required to establish a State Emergency Response Commission (SERC) under Title III. The SERC may consist of existing emergency response organizations or may be an entirely new mechanism to address this…
- Last published:
-
Pesticide applicator quantity applied to threshold or transportation exemption
A farmer contracts with an applicator to spray pesticides on his fields. The applicator drives a tank truck onto the farmers' field and sprays the pesticide from the truck onto the fields. For purposes of Section 302 emergency planning requirements, are the EHSs in the truck considered present at the…
- Last published:
-
State refusing to comply with the emergency planning provisions
What will happen if a State refuses to comply with the emergency planning provisions? A governor who does not designate a State emergency response commission becomes the commission by default. While the governor could choose not to fulfill any of the Title III provisions, the public could still request information…
- Last published:
-
Section 302 notification requirements and mixtures with unknown components
Are facilities exempt from Section 302 notification requirements if they produce, use, or store mixtures whose extremely hazardous substance component information is not available on the MSDS provided by the manufacturer? If the facility which produces, uses, or stores mixtures knows or reasonably should know the components of the mixture…
- Last published:
-
How do the changes in the 2006 Amendments apply to mobile refuelers?
Mobile refuelers are now exempt from the following sized secondary containment provisions that still apply to all other bulk storage containers and mobile/portable bulk storage containers: • Sections 112.8(c)(2) and (11) for petroleum oils • Sections 112.12(c)(2) and (11) for animal fats and vegetable oils These provisions previously required sized…
- Last published:
-
How much flexibility do applicants have in refining the Outcomes and Outcomes over time using an adaptive management approach?
Full Question How much flexibility do applicants have in refining the Outcomes and Outputs identified in their application over time using an adaptive management approach? Answer EPA recognizes that “adaptive management” can be an effective tool in getting the best results. Adjustments to outputs and outcomes based on the adaptive…
- Last published:
-
Do we have to pair hands-on, place-based Great Lakes enviro education with one of the other GLRI actions/related MOP?
Full Question Do we have to pair hands-on, place-based Great Lakes enviro education (i.e., GLRI Measure of Progress, GLRI MOP 5.1.1 youth impacted through education and stewardship projects) with one of the other GLRI actions/related MOP? Answer Projects that relate to 5.1.1 are not required to connect to another specific…
- Last published:
-
Could an organization in the coalition be a Project Subrecipient if there is a conflict-of-interest policy in place?
Full Question If we develop a conflict-of-interest policy and require recusal from evaluating or prioritizing projects where a conflict arises, would this allow EJ orgs to submit projects for funding even if they are getting paid to advise on the structure and process for the re-grant program and participation in…
- Last published:
-
Should applications include Outputs and Outcomes related to Project Subrecipient evaluation criteria?
EPA cannot provide a recommendation on this question. Applicants must decide whether or not they develop outputs and outcomes based on Project Subrecipient evaluation criteria for themselves. Please see section I.F. for information on Outcomes, Outputs, and Performance Metrics which includes information on performance measurement and evaluation plans.
- Last published:
-
How do applicants reflect the 6th year of funding on the SF424A form, as there is only room for 5 years?
We realize this is a limitation of the form and expect applicants to provide information to the best of their ability. Applicants should also provide sufficient information in the budget narrative section of their application.
- Last published:
-
Is there an expectation on whether small subawards, for ~ $50K, or large subawards, for ~$750K are preferable? For example, a large subaward could be the only thing a regional PR could award if they ask for the minimum of $2,000,000.
The RFA does not state a preference for the size of the subaward, so long as the subaward is within the $50,000 to $750,000 limit. GLNPO will look to applicants to describe the program to be carried out and why this amount of subaward funding makes sense for their specific…
- Last published:
-
TPQ calculations for hazardous substances in molten form
Facilities are subject to emergency planning and notification requirements under EPCRA (also known as SARA Title III) when an extremely hazardous substance (EHS) is present at a facility in an amount equal to or in excess of its TPQ. For some EHSs that are solids, two TPQs are given (e.g…
- Last published:
-
Reporting responsibility under EPCRA §302 for a facility with several unrelated companies?
A public warehouse is used by several unrelated companies to store extremely hazardous substances (EHSs). For purposes of emergency planning notification, who is responsible, under EPCRA Section 302, for notifying the State Emergency Response Commission if a threshold planning quantity (TPQ) of an EHS is present at the warehouse? The…
- Last published:
-
Can letters of support be emailed directly to EPA?
Only materials submitted as part of the grant application submitted on Grants.gov will be considered. If supporters wish to send letters directly to EPA, they may email ( [email protected] ). However, for them to be considered with the application, the applicant organization should be copied on those email messages with…
- Last published: