Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- Emergency Renovations Total results: 5
- Target Housing Total results: 18
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- In General Total results: 9
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Testing Painted Components Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 48 results
-
What is a reactive and non-reactive solid EHS?
Reactive solid means any extremely hazardous substance denoted with “a” in the “Notes” column in Appendix A or B of 40 CFR 355. Reactive solids are more likely than other solids to be dispersed into the air due to the energy or heat created from their reactivity with water or…
- Last published:
-
How did states form their SERCs?
How are States expected to form their State Emergency Response Commission (SERC) as required under Title III? States are required to establish a State Emergency Response Commission (SERC) under Title III. The SERC may consist of existing emergency response organizations or may be an entirely new mechanism to address this…
- Last published:
-
Pesticide applicator quantity applied to threshold or transportation exemption
A farmer contracts with an applicator to spray pesticides on his fields. The applicator drives a tank truck onto the farmers' field and sprays the pesticide from the truck onto the fields. For purposes of Section 302 emergency planning requirements, are the EHSs in the truck considered present at the…
- Last published:
-
State refusing to comply with the emergency planning provisions
What will happen if a State refuses to comply with the emergency planning provisions? A governor who does not designate a State emergency response commission becomes the commission by default. While the governor could choose not to fulfill any of the Title III provisions, the public could still request information…
- Last published:
-
Section 302 notification requirements and mixtures with unknown components
Are facilities exempt from Section 302 notification requirements if they produce, use, or store mixtures whose extremely hazardous substance component information is not available on the MSDS provided by the manufacturer? If the facility which produces, uses, or stores mixtures knows or reasonably should know the components of the mixture…
- Last published:
-
A home sustained flooding as a result of a hurricane. Once the flood water recedes, my firm must make the necessary renovations. How do the record keeping requirements apply to an emergency renovation?
Emergency renovations (other than interim controls performed in response to a child with an elevated blood lead level) are exempt from the training, certification, sign posting, waste handling and containment requirements of the Lead Renovation, Repair and Painting (RRP) Rule only to the extent necessary to respond to the emergency…
- Last published:
-
Are renovations performed on detached garages, sheds and other detached outbuildings on the property subject to the RRP Rule?
Yes. EPA interprets target housing to include pre-1978 buildings or structures that are (1) located on the residential portion of the property, and (2) associated with the residential use of the property. As a practical matter, the entire property of most urban and suburban residential lots is normally considered to…
- Last published:
-
How do the RRP requirements apply to renovations on a pre-1978 building that contains both multi-room apartments (i.e., target housing) and zero-bedroom dwellings?
In pre-1978 buildings that contain a mix of target housing and zero-bedroom dwellings, the Lead Renovation, Repair, and Painting (RRP) Rule applies only to renovations performed in target housing and common areas. Common areas are those portions of a property generally accessible to residents/users of target housing, and can exist…
- Last published:
-
Does zoning affect the target housing determination? For example, would a pre-1978 house that is zoned for commercial or office use, but used for residential purposes be considered target housing?
In determining whether a pre-1978 property is target housing, it is the actual or intended use of the property that matters, not its zoning classification. Therefore, a pre-1978 house that is used or intended to be used as a residence, even if only temporary, is target housing regardless of its…
- Last published:
-
TPQ calculations for hazardous substances in molten form
Facilities are subject to emergency planning and notification requirements under EPCRA (also known as SARA Title III) when an extremely hazardous substance (EHS) is present at a facility in an amount equal to or in excess of its TPQ. For some EHSs that are solids, two TPQs are given (e.g…
- Last published:
-
Reporting responsibility under EPCRA §302 for a facility with several unrelated companies?
A public warehouse is used by several unrelated companies to store extremely hazardous substances (EHSs). For purposes of emergency planning notification, who is responsible, under EPCRA Section 302, for notifying the State Emergency Response Commission if a threshold planning quantity (TPQ) of an EHS is present at the warehouse? The…
- Last published:
-
Can states designate liquified petroleum gas facilities under Section 302
Does the statute allow the state to designate facilities which produce, use, or store certain quantities of liquified petroleum gas as emergency planning facilities? EPA considers the designation of additional facilities to be accomplished through naming individual sites or companies, or by designation of certain classes of facilities as newly…
- Last published:
-
Transportation exemption and EPCRA emergency planning
To what extent is an LEPC/TEPC required to plan if there are only a few (or no) facilities having extremely hazardous substances present in excess of threshold planning quantities, but there is significant interstate transportation of these and other hazardous substances? While Section 327 of Title III generally exempts the…
- Last published:
-
Does the RRP rule apply to contractors working on homes damaged by a hurricane or other natural disaster?
Damage from a major storm or other natural disaster could result in the need for emergency renovations. Certain requirements of the RRP Rule do not apply to emergency renovations, which are renovation activities that were not planned but result from a sudden, unexpected event that, if not immediately attended to…
- Last published:
-
How would the Lead Renovation, Repair and Painting (RRP) Rule classify a pre-1978 property that is used for both residential and non-residential purposes?
EPA has interpreted target housing to include pre-1978 buildings or structures that are (1) located on the residential portion of the property, and (2) associated with the residential use of the property. In other words, if a portion of residential property is used for nonresidential purposes, the portion will nonetheless…
- Last published: