Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.2 Definitions Total results: 12
- 112.1 Applicability Total results: 18
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 50 results
-
CFAT Impacts on EPCRA and RMP
The Department of Homeland Security’s Chemical Facility Anti-Terrorism Standards (CFATS) impose comprehensive federal security regulations for high-risk chemical facilities. Do the CFATS alter the requirements that apply to a facility covered under both CFATS and either the Emergency Planning and Community Right-to-Know Act (EPCRA) or the Clean Air Act section…
- Last published:
-
EPCRA Reporting Mechanisms for Protecting Sensitive Business Information
Does EPCRA provide any mechanisms for facilities that must submit Tier II inventory information to protect sensitive business information? Trade secret and confidential location information (CLI) are two separate confidentiality provisions under EPCRA. Trade secret claims made under EPCRA Sections 303, 311, 312, or 313 allow facilities to claim the…
- Last published:
-
What is a farm for purposes of the SPCC Rule?
In the December 2006 amendments to the SPCC Rule, EPA defined a farm as "a facility on a tract of land devoted to the production of crops or raising of animals, including fish, which produced and sold, or normally would have produced and sold, 1,000 or more of agricultural products…
- Last published:
-
Examples of an agent of a Professional Engineer
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) or an agent of the PE must visit and examine the facility before the PE certifies an SPCC Plan (40 CFR §112.3(d)). What are some examples of an agent of a PE? An agent of a…
- Last published:
-
What is considered bulk oil storage capacity?
The revised rule recognizes that oil is sometimes stored in bulk and sometimes used operationally. A bulk storage container is any container storing oil at a facility. Bulk oil storage containers may include, but are not limited to tanks, containers, drums, and mobile or portable totes. Operational use includes oil-filled…
- Last published:
-
What is the definition of “overburdened community” that is relevant for EPA Actions and Promising Practices?
EPA Actions and Promising Practices apply the description of overburdened communities articulated in EPA’s Plan EJ 2014. The term is used to describe the minority, low‐income, tribal and indigenous populations or communities in the United States that potentially experience disproportionate environmental harms and risks due to exposures or cumulative impacts…
- Last published:
-
How will an EPA regional office determine whether a permitted activity impacts a potential overburdened community? What screening tool or process will EPA regional offices use to screen permit applications?
The Agency has developed a nationally consistent screening tool to help identify communities that are potentially overburdened. This tool, known as EJSCREEN, is one of several tools being developed under Plan EJ 2014. EPA anticipates that its regional offices will use EJSCREEN and other readily available information, including known community…
- Last published:
-
Some of the Promising Practices are mentioned in EPA regulations, guidance and recommendations that EPA has issued in the past. So why is EPA issuing the Promising Practices?
EPA is issuing Promising Practices to encourage permit applicants to strategically plan and conduct enhanced outreach to overburdened communities in the permitting process. As some commenters noted, EPA has recommended some of the outreach strategies included in Promising Practices previously. Nevertheless, EPA believes that it is important to issue Promising…
- Last published:
-
Mobile fuel tanker as a facility
Is a non-transportation related mobile fuel tanker with more than 55 gallons located near a 55 gallon drum storage area considered a facility? Perhaps. "Facility" is defined in Part 112 to mean "any mobile or fixed, onshore or offshore building, structure, installation, equipment, pipe, or pipeline (other than a vessel…
- Last published:
-
Are landfills covered under Title III of SARA since they are covered by RCRA?
Yes, landfills are subject to certain Title III requirements. Subtitle A of Title III is intended to identify facilities which present a potential hazard for a chemical emergency and to provide a process for local emergency planning committees to engage with such facilities in determining the significance of the release…
- Last published:
-
Are mobile boosters eligible for the transportation exemption?
An oil company owns many wells on an oil field. Each well is on its own plot of land. These plots are not adjacent or contiguous and, therefore, each well is its own facility. When operating these wells, it is sometimes necessary to inject air or gas into the well…
- Last published:
-
What is a field-constructed container?
What are the types of containers or equipment containing oil reservoirs that would be considered field-constructed containers and thus subject to the brittle fracture evaluation of 40 CFR §112.7(i)? As found in the Preamble language provided on page 47112 of the July 17, 2002 SPCC final rule, EPA provides a…
- Last published:
-
What is oil-filled operational equipment?
Oil-filled operational equipment is equipment that includes an oil storage container (or multiple containers and associated piping intrinsic to the operation of the equipment) in which the oil is present solely to support the function of the apparatus or the device. It is not considered a bulk storage container, and…
- Last published:
-
Are permit applicants required to adopt the Promising Practices?
EPA is not requiring permit applicants to adopt the Promising Practices. Promising Practices are simply that: good ideas in the form of suggestions to permit applicants. Permit applicants may benefit from applying these Promising Practices. EPA hopes that when permit applicants practice early and meaningful dialogue with the community, they…
- Last published:
-
EPA Actions does not require EPA regional offices to prioritize the same types of permits and adopt the same outreach activities. Why doesn’t EPA require regional offices to always prioritize certain permits and always do certain outreach activities?
EPA Actions strikes an important balance between national consistency and regional flexibility. The Agency‐wide guidelines establish national consistency by providing EPA’s expectations for the regional implementation plans. At the same time, EPA recognizes that the regional offices need the flexibility to take actions suited to the types of permits and…
- Last published: