Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Foreign producers and importers Total results: 2
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Generation of RINs Total results: 6
- Grandfathering Total results: 8
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- Minor Repair and Maintenance Activities Total results: 14
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- Emergency Renovations Total results: 5
- In General Total results: 9
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 36 results
-
CFAT Impacts on EPCRA and RMP
The Department of Homeland Security’s Chemical Facility Anti-Terrorism Standards (CFATS) impose comprehensive federal security regulations for high-risk chemical facilities. Do the CFATS alter the requirements that apply to a facility covered under both CFATS and either the Emergency Planning and Community Right-to-Know Act (EPCRA) or the Clean Air Act section…
- Last published:
-
EPCRA Reporting Mechanisms for Protecting Sensitive Business Information
Does EPCRA provide any mechanisms for facilities that must submit Tier II inventory information to protect sensitive business information? Trade secret and confidential location information (CLI) are two separate confidentiality provisions under EPCRA. Trade secret claims made under EPCRA Sections 303, 311, 312, or 313 allow facilities to claim the…
- Last published:
-
Does drilling holes in window frames to install window treatments such as shades and shutters qualify as minor repair and maintenance?
Yes, as long as the installation does not disturb more than six square feet of painted surface per room within a 30-day period. Question Number: 23002-15404 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
If a renovator disrupts 20 square feet or less of painted surface per side on several sides of the exterior of one property, does the RRP Rule apply?
Yes. To qualify for the exception for minor repair and maintenance activities, the total amount of exterior paint disrupted must be 20 square feet or less. In addition, the job must not use prohibited practices or involve window replacement or demolition of painted surfaces. Question Number: 23002-18379 Find a printable…
- Last published:
-
If I use a hammer to make a hole is a wall that is two feet on each side, does the RRP Rule apply?
Yes. Although making the hole disrupts less than six square feet of painted surface, using a hammer to make the hole is demolition of the surface, so the minor repair and maintenance exception does not apply. Making the hole using a cut-out technique that does not destroy the section of…
- Last published:
-
When replacing an old wood door and frame with a new steel entry door and frame, how do I determine whether the job qualifies as a minor repair and maintenance activity?
When replacing an old wood door and frame with a new steel entry door and frame, how do I determine whether the job qualifies as a minor repair and maintenance activity? Do I calculate the amount of painted surface disrupted using the standard for interior renovations (six square feet or…
- Last published:
-
Are landfills covered under Title III of SARA since they are covered by RCRA?
Yes, landfills are subject to certain Title III requirements. Subtitle A of Title III is intended to identify facilities which present a potential hazard for a chemical emergency and to provide a process for local emergency planning committees to engage with such facilities in determining the significance of the release…
- Last published:
-
Are mobile boosters eligible for the transportation exemption?
An oil company owns many wells on an oil field. Each well is on its own plot of land. These plots are not adjacent or contiguous and, therefore, each well is its own facility. When operating these wells, it is sometimes necessary to inject air or gas into the well…
- Last published:
-
Does an ethanol producer who sells undenatured ethanol to a U.S. importer who denatures it at the port need to register with EPA under RFS?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The RFS regulations specify that foreign producers of ethanol for use in transportation fuel, heating oil or jet fuel for import to the US who do not add denaturant to their product, must register under RFS. See 80.1450(b)…
- Last published:
-
Pipeline tanks and the transportation exemption in Title III
An oil corporation's pipeline facility contains three kinds of tanks. One type is a breakout tank used to receive and store hazardous liquids transported by a pipeline for reinjection and continued transportation by the corporation's pipeline. Another type is used to receive and store hazardous liquid for delivery to pipelines…
- Last published:
-
My firm installs carpets. Sometimes there is no need to remove an existing carpet before installing the new carpet, but sometimes there is. How do I know when I need to comply with the Lead Renovation, Repair and Painting (RRP) Rule?
If when installing the carpet, you disrupt six square feet or less of painted surface per room, the job is not covered by the RRP Rule . Question Number: 23002-19749 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Chemicals in facility pipelines and the EPCRA transportation exemption
Section 327 of the Emergency Planning and Community Right-to-Know Act (EPCRA) exempts from any Title III reporting requirement (other than the §304 notification obligation) substances or chemicals in transportation and/or being stored incident to transportation. In a final rule promulgated April 22, 1987 ( 52 FR 13378 ), the Agency…
- Last published:
-
Can members of SERCs and LEPCs be sued?
What are the liabilities of members of a state emergency response commission and a local emergency planning committee, if an incident is not handled properly despite following procedures developed and reviewed by those commission and committee members? Can the individual members be sued and held liable? The general rule is…
- Last published:
-
Civil action attorney and court fees, awarding of fines
A waste treatment facility has a release of chlorine above the reportable quantity. The facility owner or operator did not make initial notification of the release as required under EPCRA Section 304. In addition, the facility owner or operator also refused to submit a written follow-up regarding the release of…
- Last published:
-
Please provide guidance on how the Agency will interpret the term “minor repair and maintenance activities.”
Answer: “Minor repair and maintenance” is defined in 40 CFR 745.83 as activities that disrupt less than 6 square feet or less of painted surface per room for interior activities or 20 square feet or less of painted surface for exterior activities where none of the work practices prohibited or…
- Last published: