Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
- Testing for Lead Total results: 19
-
Lead Renovation, Repair and Painting
Total results: 237
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 76 - 90 of 257 results
-
If a renovator removes less than six square feet of crown molding, is that considered demolition? Does it matter whether the molding will be discarded, replaced with new molding, or reinstalled?
Answer: It depends on how the molding is removed. If a renovation activity removes or otherwise disrupts a painted component in a way that destroys or ruins the component, the activity is a demolition. Question Number: 23002-18383 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
If a renovation is taking place in a home built in 1950, but in an addition that was built in 1980, does the Lead Renovation, Repair and Painting (RRP) Rule apply to the renovation?
Yes. The RRP Rule applies to a renovation in target housing unless it has been determined that the components affected by the renovation are free of paint or other surface coatings that contain lead equal to or in excess of 1.0 milligrams per square centimeter (mg/cm2) or 0.5% by weight…
- Last published:
-
If I am painting a wall on which there are multiple coats of latex paint over the old lead-based paint and the paint is not peeling down to the lead paint level must I comply with the new Renovation, Repair, and Painting (RRP) regulations?
Yes, if the painted surface of the wall will be disturbed by the renovation. Question Number: 23002-18485 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
If a renovator uses the required practices to remove containment and clean a work area, then performs successful cleaning verification, can the project then be done using uncertified workers and without work practices required by the RRP Rule?
Yes, as long as the balance of the project can be completed without disturbing a painted surface. Question Number: 23002-18385 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
If a homeowner removes all the painted surfaces in a room and then hires a certified firm to remodel the room, does the renovator need to follow the RRP Rule?
No. Projects that do not disturb a painted surface are not subject to the RRP Rule. Question Number: 23002-18301 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
If a project disturbs six square feet or less of interior surface or twenty square feet or less of exterior surface, is it necessary for a firm to comply with the pre-renovation education requirements, such as distributing the pamphlet?
No. A project that disturbs six square feet or less of interior painted surface or twenty square feet or less of exterior painted surface is not considered a "renovation" under the Rule. It is considered a minor maintenance and repair activity. As long as this type of disturbance does not…
- Last published:
-
Plastic can be a slip hazard in some jobs, such as handling granite counter tops. This creates a more immediate safety concern than protecting the floor from dust. Can't I just clean the floor at the end of the job?
Answer: No. For interior renovations, before beginning the renovation the renovation firm must cover the floor surface, including installed carpet, with taped-down plastic sheeting or other impermeable material in the work area six feet beyond the perimeter of surfaces undergoing renovation or a sufficient distance to contain the dust, whichever…
- Last published:
-
My local community has formed a “Long Term Recovery Committee”. The committee gathers donations and provides assistance to families via volunteer work crews and/or contracted skilled labor. Are these efforts subject to the RRP Rule?
My local community has formed a “Long Term Recovery Committee” to assist in the rebuilding and recovery efforts following a natural disaster. The committee, which is a coalition of member agencies from the faith community, nonprofit agencies, government programs, businesses and individual donors, gathers monetary and material donations and provides…
- Last published:
-
If the demolition, cleanup, and cleaning verification portion of a renovation project is performed under the direction of a certified renovator using trained workers, can uncertified workers complete the job if further disturbance of paint will not occur?
If the demolition, cleanup, and cleaning verification portion of a renovation project is performed under the direction of a certified renovator using trained workers, can uncertified workers complete the job if further disturbances of painted surfaces will not occur? For example, a certified firm establishes containment and removes wall and…
- Last published:
-
My firm is replacing windows on the second floor of a home. The windows are built into a bay that projects out from a steeply pitched slate roof. Does the RRP Rule require me to install plastic on the roof under the windows?
My firm is replacing windows on the second floor of a 90-year-old home. The windows are built into a bay that projects out from a steeply pitched slate roof. When setting up exterior containment for this job, does the RRP Rule require me to install plastic on the roof under…
- Last published:
-
My firm is certified by an authorized state. Does this certification allow my firm to work in EPA-administered jurisdictions?
No. You must apply for and receive EPA certification before offering, performing, or claiming to perform renovations covered by the RRP Rule in EPA-administered jurisdictions. Question Number: 23002-19752 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Must maintenance workers at kindergartens and elementary schools become certified renovators if they perform renovations covered by the RRP Rule? Are the schools or school systems then required to become certified renovation firms?
On or after April 22, 2010, all renovations covered by the Lead Renovation, Repair and Painting (RRP) Rule must be directed by certified renovators and must be performed by certified renovators or individuals trained by a certified renovator. The RRP rule requires any firm, including a local government agency that…
- Last published:
-
Under the RRP Rule, can the required records and documentation be stored electronically rather than as paper copies?
Answer: Yes. The renovation firm is responsible for retaining and making available to EPA all records necessary to demonstrate compliance with the Lead Renovation, Repair, and Painting (RRP) Rule for a period of three years following completion of the renovation. The RRP Rule does not specify the format in which…
- Last published:
-
Under the Renovation, Repair, and Painting (RRP) Rule, in exterior containment if a large tree or shrub is within the work area can the plastic be placed around the base and would the plant, however large, also need to be covered?
Answer: The Lead Renovation, Repair, and Painting (RRP) Rule does not specifically address containment of trees or shrubs, but if dust, debris, or residue remains in the tree or shrub at the conclusion of the job, the site will not pass visual inspection. The work practices for exterior projects are…
- Last published:
-
My school district will be performing asbestos abatement in a kindergarten classroom that was built before 1978. Do the asbestos abatement workers also need to comply with the RRP rule?
Answer: Yes, if the asbestos abatement disrupts over six square feet of painted surface per room in an interior, or over 20 square feet of painted surface on an exterior, or involves window replacement or demolition of painted surfaces. If so, the asbestos abatement will need to be performed by…
- Last published: