Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Testing for Lead Total results: 19
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
- Lead Renovation, Repair and Painting Total results: 237
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 18
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Program Levels Total results: 16
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 53 results
-
Can a facility divide a process when assigning program levels?
My process includes a series of interconnected units, as well as several storage vessels that are co-located. Several sections of the process could qualify for Program 1. Can I divide my process into sections for the purpose of assigning Program levels? No, you cannot subdivide a process for this purpose…
- Last published:
-
If a stationary source has processes ineligible for Program 1, are all processes ineligible?
If a stationary source has several processes that are covered under 40 CFR Part 68, and some of those processes have had an accidental release within the past five years (effectively making those processes ineligible for Program 1 status), are the individual processes from which no accidents have occurred also…
- Last published:
-
If a covered process has an accident, when does it lose eligibility for Program 1 status?
A process covered under 40 CFR Part 68 is eligible for Program 1 requirements if it meets all of the criteria listed at 40 CFR §68.10(b). Those criteria include a requirement that the process cannot have had an accidental release of a regulated substance that led to offsite death, injury…
- Last published:
-
Applicability of program levels and prevention program requirements for co-located vessels
I have a tank with 1,000,000 pounds of toluene diisocyanate (TDI), which is covered under the RMP rule, but not under OSHA PSM. Considered by itself, the TDI would be Program 2 for EPA. The tank, however, is close to equipment that has chlorine above the applicable threshold and is…
- Last published:
-
Changing from a Program 2 or 3 process to a Program 1 process
If five years have passed since the last accident involving a covered process, and that process meets the other two requirements identified under 40 CFR §68.10(b) for Program 1 eligibility, could that process become a Program 1 process even if it had previously been identified as a Program 2 or…
- Last published:
-
Underground Storage Tanks in SPCC Plans
If a gas station that has less than 42,000 gallons completely buried oil storage capacity and no aboveground oil storage capacity installs a new aboveground tank with a capacity greater than 1,320 gallons, must the facility’s Spill Prevention, Control, and Countermeasure (SPCC) Plan address the underground storage tanks (USTs) in…
- Last published:
-
Container capacity less than 55 gallons
Do facilities need to consider containers that are less than 55 gallons for applicability under 40 CFR Part 112? No. The third column of page 47066 of the July 17, 2002 Preamble states that "You need only count containers of 55 gallons or greater in the calculation of the regulatory…
- Last published:
-
Oil-filled equipment capacity
When counting against the 1,320 aboveground storage capacity threshold, would operational storage of oil (such as in a hydraulic press) be used? Oil which is contained in equipment is required to be factored into the storage capacity for the facility even though the oil may be only used for ancillary…
- Last published:
-
If your farm does not have fuel storage that will flow into US waters by a ditch, river, stream, or lake, do you have to prepare a SPCC Plan?
No. EPA suggests you use a common sense approach. If one of your oil storage tanks leaks, and the spilled oil would not flow into navigable waters or adjoining shorelines, you do not have to prepare a Plan. Remember that you still have the responsibility to clean up any spilled…
- Last published:
-
Ground water pathways related to reasonably expected to discharge
The SPCC Rule applies to facilities that could reasonably be expected to discharge into navigable waters (40 CFR §112.2(a)). Does a facility need to consider ground water pathways when determining if a discharge of oil could reasonably be expected to reach navigable waters? Owners and operators should consider whether on-site…
- Last published:
-
SPCC responsibility for tanks on leased property
What if I leased some parcels, and there are tanks already present? Am I responsible for these tanks? You could be. If you plan to use these tanks, make sure in your lease agreement, it states who is responsible for these tanks. If the lease does not state who is…
- Last published:
-
When testing a work area, does one lead test kit or paint chip sample suffice for any single component?
The certified renovator is only required to use one lead test kit or paint chip sample for each component, even if the surface of the component is extensive (e.g., a large wall). Question Number: 23002-23865 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Can a homeowner use an EPA-recognized lead test kit to check for lead-based paint?
Answer: A number of lead test kits are available for consumer purchase in most retail hardware stores; however, the Consumer Product Safety Commission (CPSC) states that consumers should exercise caution when using these lead test kits to evaluate consumer products for potential lead exposures. Find more information online . To…
- Last published:
-
How can I obtain D-Lead® test kits?
The D-Lead® test kits are available for purchase from certain distributors and retail outlets. Locate a distributor or retailer online , email [email protected] or call 414-962-3006. Question Number: 23002-16390 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Is lead paint testing required under the Lead Renovation, Repair and Painting (RRP) Rule?
No. A firm can either assume lead-based paint is present and follow the requirements of the RRP Rule (which requires no testing), or test and if lead-based paint is found follow the requirements of the regulation. Question Number: 23002-32338 Find a printable PDF copy of all frequent questions pertaining to…