Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Lead-Based Paint Program Fees Total results: 9
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
- Lead Renovation, Repair and Painting Total results: 237
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Program Levels Total results: 16
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Exposure to chemicals in the air, soil and water (dioxins)
- Lead-Based Paint Program Fees
- Program Levels
Displaying 1 - 15 of 43 results
-
What’s the difference between short-term and long-term chemical exposure levels?
Acute or short-term exposure assumes that a person has been exposed to a chemical for a short period of time. Long term, also known as chronic, exposure assumes a person has been constantly exposed to a chemical for a lifetime, or approximately 70 years.
- Last published:
-
Is our East Palestine City Park safe for activities?
Yes. Results show that levels of dioxin and semi-volatile organic compounds are well below any levels that we would consider restricting activities, and all are either at or below typical background levels for soil in the United States. In addition, the village has cleaned all recreational equipment, including the pool…
- Last published:
-
What is being done to control dust?
Norfolk Southern contractors use engineering controls to reduce dust generated from cleanup activities and disturbed soil surfaces. All contaminated material leaving the derailment site is secured and tarped, and all contaminated material on site is tarped nightly. Trucks are decontaminated before they leave the site, and large water trucks are…
- Last published:
-
Can a facility divide a process when assigning program levels?
My process includes a series of interconnected units, as well as several storage vessels that are co-located. Several sections of the process could qualify for Program 1. Can I divide my process into sections for the purpose of assigning Program levels? No, you cannot subdivide a process for this purpose…
- Last published:
-
If a stationary source has processes ineligible for Program 1, are all processes ineligible?
If a stationary source has several processes that are covered under 40 CFR Part 68, and some of those processes have had an accidental release within the past five years (effectively making those processes ineligible for Program 1 status), are the individual processes from which no accidents have occurred also…
- Last published:
-
If a covered process has an accident, when does it lose eligibility for Program 1 status?
A process covered under 40 CFR Part 68 is eligible for Program 1 requirements if it meets all of the criteria listed at 40 CFR §68.10(b). Those criteria include a requirement that the process cannot have had an accidental release of a regulated substance that led to offsite death, injury…
- Last published:
-
Applicability of program levels and prevention program requirements for co-located vessels
I have a tank with 1,000,000 pounds of toluene diisocyanate (TDI), which is covered under the RMP rule, but not under OSHA PSM. Considered by itself, the TDI would be Program 2 for EPA. The tank, however, is close to equipment that has chlorine above the applicable threshold and is…
- Last published:
-
Changing from a Program 2 or 3 process to a Program 1 process
If five years have passed since the last accident involving a covered process, and that process meets the other two requirements identified under 40 CFR §68.10(b) for Program 1 eligibility, could that process become a Program 1 process even if it had previously been identified as a Program 2 or…
- Last published:
-
Does the Fee Rule for Abatement and RRP Programs apply nationwide?
Answer: The rule applies only in those states and tribes without their own authorized lead programs. Currently, EPA implements the Lead-based Paint Activities program in 11 states and the Lead Renovation, Repair, and Painting Rule in 36 states. Question Number: 23002-33305 Find a printable PDF copy of all frequent questions…
- Last published:
-
Who is affected by the Fee Rule for Lead Abatement and Renovation, Repair and Painting (RRP) Programs?
The Fee Rule for Lead Abatement and RRP Programs establishes fees that will be charged for training programs seeking accreditation, for firms engaged in renovations seeking certification and for individuals (for example, risk assessors) or firms engaged in lead-based paint activities that govern lead abatement, inspection and risk assessment activities…
- Last published:
-
Can I grow a garden at home or plant crops?
Yes. You can continue to use your land as you normally would. Residential soil sampling results are within typical ranges for the area. Follow normal measures like peeling root vegetables and washing leafy greens.
- Last published:
-
What are the terms used to describe the length of exposure to substances?
Acute exposure is any contact with a substance that occurs once or for up to 14 days. Intermediate exposure is contact occurring for more than 14 days but less than one year. Chronic exposure is contact occurring for longer than one year.
- Last published:
-
Assigning program level 1 if a public receptors is just beyond distance to endpoint
Our distance to the endpoint for the worst-case release is 0.3 miles. The nearest public receptor is 0.32 miles away. What tools are available to document that the public receptor is beyond the distance to the endpoint so we can qualify for Program 1? The results of any air dispersion…
- Last published:
-
Process that meets Program 1 requirements and Program 3 applicability
Program 3 applies to processes in certain NAICS codes as well as any process subject to the OSHA Process Safety Management (PSM) standard, unless the process is eligible for Program 1. If a process meets the requirements of Program 1, but is also in NAICS code 32211 (one of those…
- Last published:
-
Can a process qualify for Program 1 if it has had an accident?
A process with more than a threshold quantity of a regulated substance had an accident with off-site consequences three years ago. After the accident, we altered the process to reduce the quantity stored onsite. Now the worst-case release scenario indicates that there are no public receptors within the distance to…
- Last published: