Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Impacts to the environment Total results: 1
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 18
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Program Levels Total results: 16
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 21 results
-
Why hasn’t the Norwood Landfill Site been identified as a Superfund Site? Two nearby landfills, Folcroft and Clearview, which were established and in use at the same time as Norwood Landfill and Dump have both been designated as Superfund sites.
EPA is still conducting its investigation of the Norwood Landfill Site to determine if it should be placed on the National Priorities List (NPL), or Superfund List. Thus far, the data collected has not demonstrated that the site warrants placement on the NPL. Both the Folcroft and Clearview Landfills went…
- Last published:
-
Can a facility divide a process when assigning program levels?
My process includes a series of interconnected units, as well as several storage vessels that are co-located. Several sections of the process could qualify for Program 1. Can I divide my process into sections for the purpose of assigning Program levels? No, you cannot subdivide a process for this purpose…
- Last published:
-
If a stationary source has processes ineligible for Program 1, are all processes ineligible?
If a stationary source has several processes that are covered under 40 CFR Part 68, and some of those processes have had an accidental release within the past five years (effectively making those processes ineligible for Program 1 status), are the individual processes from which no accidents have occurred also…
- Last published:
-
If a covered process has an accident, when does it lose eligibility for Program 1 status?
A process covered under 40 CFR Part 68 is eligible for Program 1 requirements if it meets all of the criteria listed at 40 CFR §68.10(b). Those criteria include a requirement that the process cannot have had an accidental release of a regulated substance that led to offsite death, injury…
- Last published:
-
Applicability of program levels and prevention program requirements for co-located vessels
I have a tank with 1,000,000 pounds of toluene diisocyanate (TDI), which is covered under the RMP rule, but not under OSHA PSM. Considered by itself, the TDI would be Program 2 for EPA. The tank, however, is close to equipment that has chlorine above the applicable threshold and is…
- Last published:
-
Changing from a Program 2 or 3 process to a Program 1 process
If five years have passed since the last accident involving a covered process, and that process meets the other two requirements identified under 40 CFR §68.10(b) for Program 1 eligibility, could that process become a Program 1 process even if it had previously been identified as a Program 2 or…
- Last published:
-
What is a site assessment and what is the difference between a site assessment and a site investigation?
The first step of the site assessment process is known as a preliminary assessment (PA). This assessment gathers historical and other readily available information on site conditions and surroundings to evaluate whether the site poses a potential threat to human health and the environment and/or whether further investigation is needed…
- Last published:
-
Assigning program level 1 if a public receptors is just beyond distance to endpoint
Our distance to the endpoint for the worst-case release is 0.3 miles. The nearest public receptor is 0.32 miles away. What tools are available to document that the public receptor is beyond the distance to the endpoint so we can qualify for Program 1? The results of any air dispersion…
- Last published:
-
Process that meets Program 1 requirements and Program 3 applicability
Program 3 applies to processes in certain NAICS codes as well as any process subject to the OSHA Process Safety Management (PSM) standard, unless the process is eligible for Program 1. If a process meets the requirements of Program 1, but is also in NAICS code 32211 (one of those…
- Last published:
-
Can a process qualify for Program 1 if it has had an accident?
A process with more than a threshold quantity of a regulated substance had an accident with off-site consequences three years ago. After the accident, we altered the process to reduce the quantity stored onsite. Now the worst-case release scenario indicates that there are no public receptors within the distance to…
- Last published:
-
Program level 1 eligibility and accident history
A process with more than a threshold quantity of a regulated substance had an accident with off-site consequences three years ago. After the accident, we altered the process to reduce the quantity stored on site, although the quantity still exceeds the threshold quantity. Now the worst case release scenario indicates…
- Last published:
-
Program level 3 applicability and whether states have delegated OSHA programs
I am a publicly owned facility in a state with a delegated OSHA program. Why are my processes considered to be in Program 3 when the same processes in a state where federal OSHA runs the program are in Program 2? Federal OSHA cannot impose its rules on state or…
- Last published:
-
Why did EPA wait so long to begin its investigation of the Norwood Landfill and Old Norwood Dump?
In the months leading up to the preliminary assessment, EPA gathered information on the property to determine whether a site investigation under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) was warranted. EPA determined to proceed with an investigation and EPA began procuring contractor services to conduct the preliminary…
- Last published:
-
Are evacuations and sheltering-in-place considered for Program 1 eligibility?
A facility performed a worst-case release scenario and determined that there are no public receptors within the endpoints. There are several residences located just outside the endpoint. In reviewing the five year accident history, there were several releases of a regulated substance, in which the residences were notified by the…
- Last published:
-
Hunting season is underway, is it ok to eat wild game meat harvested from the local area?
There is no evidence to indicate there are any human health risks resulting from the train derailment that would limit eating wild game. To learn about other advisories or notices unrelated to the incident, contact the agency listed on your hunting license.
- Last published: