Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Program Levels Total results: 16
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 42 results
-
What questions was EPA trying to find answers to during its first round of sampling at the Norwood Landfill site?
The main question that EPA seeks to answer is whether the identified waste areas warrant consideration for placement of the Site on the National Priorities List (NPL) or Superfund List. In the first round of sampling, EPA collected surface soil samples (0-2 feet) from the landfill property, and surface water…
- Last published:
-
What does it mean when EPA finds contamination that “exceeds screening levels?”
Screening levels are not the same as cleanup or action levels. An exceedance of a screening level indicates the need for additional evaluation, potentially including a site-specific risk assessment.
- Last published:
-
If EPA finds any contamination associated with the Norwood Landfill site that “exceeds” what is considered safe, will EPA clean up that contamination - even if the Agency cannot find any “pathways” for that contamination to reach humans or sensitive environments?
If the sampling data shows an exceedance of a screening level, EPA will consult with the site Toxicologist and the Agency for Toxic Substances and Disease Registry (ATSDR) to conduct a human health risk screening assessment to determine any potential threat to human health. EPA will also consult with the…
- Last published:
-
How do you know you are not missing some areas that might be contaminated?
EPA uses all credible information available, including community input, regarding the boundaries and geographic areas of waste that may have been deposited or where contaminated soil may have been placed. The team selects its sampling locations based on those areas and consults historic aerial images that help depict those boundaries.
- Last published:
-
Will EPA sample the Glenolden Laboratory property?
The former Glenolden Laboratory property located on South Avenue is a separate site. The previous owners conducted a voluntary cleanup pursuant to the Pennsylvania Department of Environmental Protection’s (PADEP) Environmental Cleanup Program, known as Act 2. Concerns regarding remedial actions conducted under Act 2 should be directed to PADEP as…
- Last published:
-
Can a facility divide a process when assigning program levels?
My process includes a series of interconnected units, as well as several storage vessels that are co-located. Several sections of the process could qualify for Program 1. Can I divide my process into sections for the purpose of assigning Program levels? No, you cannot subdivide a process for this purpose…
- Last published:
-
If a stationary source has processes ineligible for Program 1, are all processes ineligible?
If a stationary source has several processes that are covered under 40 CFR Part 68, and some of those processes have had an accidental release within the past five years (effectively making those processes ineligible for Program 1 status), are the individual processes from which no accidents have occurred also…
- Last published:
-
If a covered process has an accident, when does it lose eligibility for Program 1 status?
A process covered under 40 CFR Part 68 is eligible for Program 1 requirements if it meets all of the criteria listed at 40 CFR §68.10(b). Those criteria include a requirement that the process cannot have had an accidental release of a regulated substance that led to offsite death, injury…
- Last published:
-
Applicability of program levels and prevention program requirements for co-located vessels
I have a tank with 1,000,000 pounds of toluene diisocyanate (TDI), which is covered under the RMP rule, but not under OSHA PSM. Considered by itself, the TDI would be Program 2 for EPA. The tank, however, is close to equipment that has chlorine above the applicable threshold and is…
- Last published:
-
Changing from a Program 2 or 3 process to a Program 1 process
If five years have passed since the last accident involving a covered process, and that process meets the other two requirements identified under 40 CFR §68.10(b) for Program 1 eligibility, could that process become a Program 1 process even if it had previously been identified as a Program 2 or…
- Last published:
-
Will applicants be evaluated on whether or not they leverage funds?
Cost share and leveraging of non-federal funds is not a requirement of this Funding Opportunity, but if leveraging is proposed, applicants will be evaluated based on how they will obtain the leveraged resources, the likelihood the leveraging will materialize during grant performance (e.g., if they have letters of commitment), the…
- Last published:
-
Is it possible to distribute the majority of project funding in Year 2 and 3?
Yes. Applicants should commit to being able to issue its first Project RFA within one year of being selected as Principal Recipient (page 9 of the RFA), however this is not a threshold eligibility requirement. There are no specific requirements as to the timing of issuing Project RFAs and funding…
- Last published:
-
Will there be a non-federal cost share or match required of grants made by the principal recipient?
No, non-federal cost share is not required. If an applicant proposes voluntary cost share, they should carefully review section III.B on page 21, description of Supporting Materials in section IV.D on page 27, and section V.B.
- Last published:
-
Will EPA conduct sampling in local parks in the Norwood community?
EPA will sample Norwood Park because of its close proximity to the Old Norwood Dump and Norwood Landfill. There is no current information that would warrant sampling in other parks.
- Last published:
-
How will the budget for year six be treated in case of a continuation of sampling past 2029?
Sampling past 2029 will not be covered under this assistance agreement.
- Last published: