Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- About the East Palestine Train Derailment Total results: 13
- Environmental Sampling and Monitoring Total results: 7
- About the Cleaning Process Total results: 10
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Program Levels Total results: 16
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 36 results
-
What’s the difference between air sampling and air monitoring?
Air monitoring and air sampling are two different methods of looking at air quality. Air monitoring uses electronic devices to provide real-time readings of contaminants in the air. Air sampling involves trapping air over a period of time in a container that is then sent to a laboratory for analysis…
- Last published:
-
How does EPA oversee cleanup at the derailment site?
EPA leads the Unified Command consisting of different agencies to approve Norfolk Southern’s workplans and weekly activities. EPA also coordinates with other agencies to perform oversight, such as with Ohio EPA, the Columbiana County Health District, and the Pennsylvania Department of Environmental Protection. EPA and Ohio EPA personnel oversee safety…
- Last published:
-
What is EPA’s role in sampling?
EPA is part of the Unified Command consisting of different agencies to review, approve and direct Norfolk Southern’s workplans and site activities. Surface water sampling is performed by Norfolk Southern contractors, with EPA and Ohio EPA oversight. Soil sampling is performed both by Norfolk Southern contractors and EPA contractors. Air…
- Last published:
-
What are the health agencies doing?
The Centers for Disease Control and Prevention and Agency for Toxic Substances and Disease Registry (ATSDR) are analyzing their Assessment of Chemical Exposure (ACE) survey results to assess the health impacts of the train derailment. CDC and ATSDR continue to support the Ohio and Pennsylvania health departments and will be…
- Last published:
-
Can a facility divide a process when assigning program levels?
My process includes a series of interconnected units, as well as several storage vessels that are co-located. Several sections of the process could qualify for Program 1. Can I divide my process into sections for the purpose of assigning Program levels? No, you cannot subdivide a process for this purpose…
- Last published:
-
If a stationary source has processes ineligible for Program 1, are all processes ineligible?
If a stationary source has several processes that are covered under 40 CFR Part 68, and some of those processes have had an accidental release within the past five years (effectively making those processes ineligible for Program 1 status), are the individual processes from which no accidents have occurred also…
- Last published:
-
If a covered process has an accident, when does it lose eligibility for Program 1 status?
A process covered under 40 CFR Part 68 is eligible for Program 1 requirements if it meets all of the criteria listed at 40 CFR §68.10(b). Those criteria include a requirement that the process cannot have had an accidental release of a regulated substance that led to offsite death, injury…
- Last published:
-
Applicability of program levels and prevention program requirements for co-located vessels
I have a tank with 1,000,000 pounds of toluene diisocyanate (TDI), which is covered under the RMP rule, but not under OSHA PSM. Considered by itself, the TDI would be Program 2 for EPA. The tank, however, is close to equipment that has chlorine above the applicable threshold and is…
- Last published:
-
Changing from a Program 2 or 3 process to a Program 1 process
If five years have passed since the last accident involving a covered process, and that process meets the other two requirements identified under 40 CFR §68.10(b) for Program 1 eligibility, could that process become a Program 1 process even if it had previously been identified as a Program 2 or…
- Last published:
-
Now that the track is rebuilt, what else needs to be done and how long will it take?
There is still a lot of work to do. Contaminated soil to the north and south of the tracks need to be removed. A full site assessment, including extensive sampling, of areas and properties near the derailment site needs to be conducted. A full assessment of impacted creeks will be…
- Last published:
-
What is the plume map and what does it tell us?
The plume map is an “event reconstruction” based on known weather and on-site observations during a 10-hour time period after the vent-and-burn operation that occurred on Monday, February 6. It tells us where soot likely fell to the ground and where the highest concentrations of particles may be. This information…
- Last published:
-
If there is a government shutdown, will work continue on the cleanup?
A 45-day continuing resolution was recently passed to avoid a shutdown. EPA’s emergency response efforts, such as in East Palestine, would move forward under a lapse in appropriation. As a result, EPA personnel would continue to fully support those efforts during a lapse.
- Last published:
-
What is the process for refilling excavated areas at the derailment site?
Areas that were excavated as part of the derailment cleanup effort will be backfilled with clean soil. Before soil is chosen as backfill it is tested for chemicals and heavy metals. While the source of backfill is still being identified, some areas have been temporarily backfilled with ballast (large gravel)…
- Last published:
-
What is split sampling?
Split sampling is a technique where multiple samples are collected from the same location at the same time and then sent to separate laboratories for analysis. Checking to see if the labs get the same or similar results is a way to determine the accuracy of the data. If there…
- Last published:
-
What work happens after contamination under and between the train tracks is removed?
After track work is complete, additional cleanup and assessments will continue. This includes shipping solid and liquid wastes off-site, excavating in areas where rail cars were staged and scrapped, and sampling and monitoring groundwater, soil, surface water, and sediment.
- Last published: