Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Lead in Products Total results: 1
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead Renovation, Repair and Painting Total results: 237
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.2 Definitions Total results: 12
- 112.1 Applicability Total results: 18
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Plan Preparation and Submission Total results: 49
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Prevention Program Total results: 30
- Program Levels Total results: 16
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 62 results
-
Change of owner and RMP facility ID number
If a facility is sold to a new owner, does it keep its' original RMP Facility ID number? Yes. The facility will keep the ID number assigned by EPA.
- Last published:
-
Facility ID number and re-registering a facility
If a facility deregisters, then reregisters, should the facility use the original RMP Facility ID or will it be assigned a new ID? The facility should use the original ID assigned by EPA.
- Last published:
-
Resubmission of RMP for a facility that previously deregistered
A covered facility deregisters its RMP because it no longer has more than a threshold quantity of a regulated substance in a covered process. If the facility becomes subject to the CAA §112(r) risk management program regulations at a later date and submits a new RMP, should the facility submit…
- Last published:
-
RMP Records Maintained Onsite
Pursuant to 40 CFR Part 68, Subpart G, the owner or operator of a stationary source subject to the risk management program regulations in Part 68 must develop and submit a risk management plan (RMP). Does the owner or operator have to maintain a written copy of the RMP on…
- Last published:
-
What is a farm for purposes of the SPCC Rule?
In the December 2006 amendments to the SPCC Rule, EPA defined a farm as "a facility on a tract of land devoted to the production of crops or raising of animals, including fish, which produced and sold, or normally would have produced and sold, 1,000 or more of agricultural products…
- Last published:
-
Examples of an agent of a Professional Engineer
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) or an agent of the PE must visit and examine the facility before the PE certifies an SPCC Plan (40 CFR §112.3(d)). What are some examples of an agent of a PE? An agent of a…
- Last published:
-
What is considered bulk oil storage capacity?
The revised rule recognizes that oil is sometimes stored in bulk and sometimes used operationally. A bulk storage container is any container storing oil at a facility. Bulk oil storage containers may include, but are not limited to tanks, containers, drums, and mobile or portable totes. Operational use includes oil-filled…
- Last published:
-
Change of Ownership
If a facility that is subject to the risk management program regulations in 40 CFR Part 68 is sold to another owner, is the facility required to make a correction or a full update of its risk management plan (RMP)? If there are no changes in the covered operations at…
- Last published:
-
Mobile fuel tanker as a facility
Is a non-transportation related mobile fuel tanker with more than 55 gallons located near a 55 gallon drum storage area considered a facility? Perhaps. "Facility" is defined in Part 112 to mean "any mobile or fixed, onshore or offshore building, structure, installation, equipment, pipe, or pipeline (other than a vessel…
- Last published:
-
RMP*eSubmit preparer access
How does a new Preparer get access to a Risk Management Plan (RMP) via RMP*eSubmit? First, the person must register with CDX. To register with CDX, go to https://cdx.epa.gov/ and complete the registration process for a Risk Management Plan “Preparer”. Once set up as a “Preparer”, the Certifying Official needs…
- Last published:
-
Is there lead in lipstick?
Answer: In response to a number of inquiries regarding reports of lead contamination in lipstick, the U.S. Food and Drug Administration (FDA) developed and validated a method for analyzing lead content in currently marketed lipstick. Learn more . Question Number : 23002-33252 Find a printable PDF copy of all frequent…
- Last published:
-
Five-year Anniversary Due Date and Time
Pursuant to the risk management program regulations in 40 CFR §68.190, the owner or operator of a stationary source shall revise and update the RMP at least once every five years from the date of initial submission. At what time on the 5-year anniversary date is the RMP due? The…
- Last published:
-
Required Contractor Contact Information
A facility that uses a contractor to prepare its RMP must include in the registration section the name, mailing address, and telephone number of the contractor who prepared the RMP (40 CFR §68.160(b)(14)). When a contractor only prepares a portion of an RMP on behalf of a facility, does the…
- Last published:
-
If a facility changes owners and significant changes have been made to plant operations is the facility required to update all sections of the RMP and resubmit it to EPA?
Yes. If the facility has new ownership and plant operations have changed significantly, the new facility owner/operator needs to do a resubmission. For details on how to resubmit, see the Web page for RMP*eSubmit .
- Last published:
-
RMPs for stationary source with multiple program levels
If a stationary source comprises some covered processes that meet the eligibility requirements for one of the three programs (i.e., Program 1, 2, or 3) and some processes that are subject to a different program, must the owner or operator of the source submit multiple risk management plans (RMPs)? No…
- Last published: