Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Livestock and pet health impacts Total results: 1
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Registration Total results: 25
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Grandfathering Total results: 8
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Plan Preparation and Submission Total results: 49
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Prevention Program Total results: 30
- Program Levels Total results: 16
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 75 results
-
Change of owner and RMP facility ID number
If a facility is sold to a new owner, does it keep its' original RMP Facility ID number? Yes. The facility will keep the ID number assigned by EPA.
- Last published:
-
Facility ID number and re-registering a facility
If a facility deregisters, then reregisters, should the facility use the original RMP Facility ID or will it be assigned a new ID? The facility should use the original ID assigned by EPA.
- Last published:
-
Resubmission of RMP for a facility that previously deregistered
A covered facility deregisters its RMP because it no longer has more than a threshold quantity of a regulated substance in a covered process. If the facility becomes subject to the CAA §112(r) risk management program regulations at a later date and submits a new RMP, should the facility submit…
- Last published:
-
RMP Records Maintained Onsite
Pursuant to 40 CFR Part 68, Subpart G, the owner or operator of a stationary source subject to the risk management program regulations in Part 68 must develop and submit a risk management plan (RMP). Does the owner or operator have to maintain a written copy of the RMP on…
- Last published:
-
Should I let my pets and/or children play in Sulphur Run and Leslie Run?
Until the stream characterization assessment is completed, and the results analyzed, recreational use of Sulphur and Leslie Run should be avoided. While surface water is tested every three days and has not shown any contaminants at levels that exceed health standards since May 1, further investigation is needed to determine…
- Last published:
-
Is it required that the professional engineer conducting the engineering review must be licensed in the state in which the renewable fuel facility is located?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The licensed professional engineer should comply with the state laws where the renewable fuel facility is located to determine whether or not their license allows them to conduct business in that state.
- Last published:
-
Change of Ownership
If a facility that is subject to the risk management program regulations in 40 CFR Part 68 is sold to another owner, is the facility required to make a correction or a full update of its risk management plan (RMP)? If there are no changes in the covered operations at…
- Last published:
-
May records, regardless of whether they are paper or electronic, be stored off-site?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. Refiners, oxygenate blenders and importers must indicate where records will be kept on all facility registrations.(7/1/94) This question and answer was originally posted at Consolidated List of Reformulated Gasoline and Anti-Dumping Questions and Answers: July 1, 1994…
- Last published:
-
Is the licensed professional engineer conducting the engineering review required to perform the site visit in person, or can they delegate the site visit to another person who maybe assisting them in the engineering review?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Pursuant to §80.1450(b)(2), all verifications must be performed by the licensed professional engineer conducting the engineering review. This requirement includes conducting the site visits. The licensed professional engineer conducting the engineering review must perform the site visits to…
- Last published:
-
In filing company and facility registrations, if a parent corporation has several subsidiary corporations it desires to register and report to EPA under one company ID number, would it be permissible to register all of the facilities operated by the subsi
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . In this situation the parent corporation should register for a company ID # and facilities operated by the subsidiary corporations should be registered as separate facilities but under the parent corporation's company ID #.(8/29/94) This question and answer…
- Last published:
-
If my fuel is already registered with the Fuels and Fuel Additives program under 40 CFR Part 79, do I still need to register with the RFS2 program under 40 CFR Part 80?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. Even if your fuel or fuel additive is already registered under 40 CFR Part 79, there are additional registration requirements for parties regulated under the RFS2 program, as specified in 40 CFR 80.1450.
- Last published:
-
RMP*eSubmit preparer access
How does a new Preparer get access to a Risk Management Plan (RMP) via RMP*eSubmit? First, the person must register with CDX. To register with CDX, go to https://cdx.epa.gov/ and complete the registration process for a Risk Management Plan “Preparer”. Once set up as a “Preparer”, the Certifying Official needs…
- Last published:
-
Five-year Anniversary Due Date and Time
Pursuant to the risk management program regulations in 40 CFR §68.190, the owner or operator of a stationary source shall revise and update the RMP at least once every five years from the date of initial submission. At what time on the 5-year anniversary date is the RMP due? The…
- Last published:
-
Required Contractor Contact Information
A facility that uses a contractor to prepare its RMP must include in the registration section the name, mailing address, and telephone number of the contractor who prepared the RMP (40 CFR §68.160(b)(14)). When a contractor only prepares a portion of an RMP on behalf of a facility, does the…
- Last published:
-
If a facility changes owners and significant changes have been made to plant operations is the facility required to update all sections of the RMP and resubmit it to EPA?
Yes. If the facility has new ownership and plant operations have changed significantly, the new facility owner/operator needs to do a resubmission. For details on how to resubmit, see the Web page for RMP*eSubmit .