Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 49
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Offsite Consequence Analysis (OCA) Total results: 57
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- Program Levels Total results: 16
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 16 - 30 of 66 results
-
Must I anticipate a specific cause for the worst-case scenario for a toxic substance?
When analyzing the worst-case scenario for regulated toxic substances, must I anticipate a specific cause (e.g., fire, explosion, etc.) of the scenario? No. The worst-case analysis for a release of regulated toxic substances must conform to specific assumptions as identified in § 68.25(c) and (d). Anticipated causes of the release…
- Last published:
-
Flammable event with different time duration
What if a flammable event has a different time duration than the 5 kw/m2 for 40 seconds? EPA recognizes that flammable events may occur for a different amount of exposure time. Therefore, the owner or operator should determine the distance to an equivalent exposure - e.g. if the flammable event…
- Last published:
-
Definition and data sources of "environmental receptor"
The Risk Management Program rule requires owners or operators of covered processes to define in the risk management plan (RMP) the potential offsite public and environmental receptors within the impact range of identified worst case and alternative release scenarios. What is the definition of "environmental receptor"? What data sources are…
- Last published:
-
Worst-case Release Scenario for Separate, Interconnected Vessels
Pursuant to the risk management program regulations, facilities must perform an offsite consequence analysis for the worst-case release scenario. Do the quantities of two separate vessels that are interconnected with a closed valve need to be aggregated for the worst-case release scenario analysis? No. Worst-case release is defined as the…
- Last published:
-
Worst-case release scenarios for toxics and flammables represented by Program 2 or 3 processes
A stationary source subject to the risk management program regulations at 40 CFR Part 68 comprises multiple Program 2 and Program 3 covered processes. The owner or operator must do a single worst-case release analysis to represent toxic regulated substances and a single worst-case release analysis to represent flammable regulated…
- Last published:
-
Non-residential population in off-site consequence analyses
Must an owner or operator include in their risk management plan (RMP) estimates of the non-residential population when defining off-site impacts for the off-site consequence analysis? Owners or operators are required to note in the RMP the presence of any major institutions (i.e., schools, hospitals, or prisons), public recreational areas…
- Last published:
-
Are barracks and family housing units on military bases considered public receptors?
Barracks are not considered public receptors, family housing units are. Public receptors include any "offsite residences ... inhabited or occupied by the public at any time without restriction by the stationary source where members of the public could be exposed to toxic concentrations, radiant heat, or overpressure, as a result…
- Last published:
-
Are on-site areas with unrestricted access considered public receptors?
A process covered under 40 CFR Part 68 is eligible for Program 1 requirements if it meets all of the criteria listed at 40 CFR §68.10(b). One of those criteria is that the distance to a toxic or flammable endpoint for a worst-case release assessment is less than the distance…
- Last published:
-
Are areas occupied solely by employees considered public receptors?
When analyzing off-site consequences for the purpose of a worst-case or alternative release scenario under the risk management program regulations (40 CFR Part 68), are areas occupied solely by employees at the source considered to be public receptors? No. Such areas at the stationary source are not to be included…
- Last published:
-
Do the quantities of interconnected vessels need to be aggregated for the worst-case release scenario analysis?
Pursuant to the risk management program regulations, facilities must perform an offsite consequence analysis for the worst-case release scenario. Do the quantities of two separate vessels that are interconnected with a closed valve need to be aggregated for the worst-case release scenario analysis? No. Worst-case release is defined as the…
- Last published:
-
Active mitigation systems (e.g., scrubbers) and alternative release scenarios
I run a wastewater treatment plant that is subject to the risk management program regulations in 40 CFR Part 68 for a covered process containing chlorine. A chlorine scrubber system at the plant is designed to prevent any possible releases from reaching a toxic endpoint offsite. How does this active…
- Last published:
-
What happens after a facility submits the information about an oil discharge to EPA?
The EPA Regional Administrator will review the information submitted by the facility and may require a facility to submit and amend its SPCC Plan. Facilities and equipment that qualified for the new streamlined requirements may lose eligibility for those options as determined by the Regional Administrator. A state agency may…
- Last published:
-
Who is subject to the Discharge of Oil regulation?
Any person in charge of a vessel or of an onshore or offshore facility is subject to the reporting requirements of the Discharge of Oil regulation if it discharges a harmful quantity of oil to U.S. navigable waters, adjoining shorelines, or the contiguous zone, or in connection with activities under…
- Last published:
-
Identification of Industrial Buildings, Commercial Buildings, and Recreational Areas
Pursuant to the hazard assessment requirements in 40 CFR Part 68, Subpart B, an owner or operator is required to conduct an offsite consequence analysis and analyze a worst-case release scenario and alternative release scenarios as part of a risk management plan (RMP). When completing these scenarios, public receptors need…
- Last published:
-
Why were ERPG-2 values selected as toxic endpoints instead of ERPG-3?
An endpoint is needed for analysis of offsite consequences of potential accidental releases of regulated substances. The endpoint to be used for each regulated toxic substance is provided in Part 68, Appendix A, and is the Emergency Response Planning Guideline level 2 (ERPG-2) developed for the substance by the American…