Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Environmental Sampling and Monitoring Total results: 7
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- Permitting Under the Clean Air Act Total results: 18
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Other Risk Management Programs Total results: 35
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- Program Levels Total results: 16
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Environmental Sampling and Monitoring
- 40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
- Other Risk Management Programs
Displaying 1 - 15 of 107 results
-
Criteria for oil production facilities to be qualified facilities
Qualified facilities are eligible for streamlined regulatory requirements in 40 CFR §112.6, which include self-certification of SPCC Plans. What criteria do oil production facilities have to meet in order to be considered qualified facilities? Oil production facilities, like all other facilities, must meet the criteria in §112.3(g)(1) or (2) to…
- Last published:
-
What’s the difference between air sampling and air monitoring?
Air monitoring and air sampling are two different methods of looking at air quality. Air monitoring uses electronic devices to provide real-time readings of contaminants in the air. Air sampling involves trapping air over a period of time in a container that is then sent to a laboratory for analysis…
- Last published:
-
What is EPA’s role in sampling?
EPA is part of the Unified Command consisting of different agencies to review, approve and direct Norfolk Southern’s workplans and site activities. Surface water sampling is performed by Norfolk Southern contractors, with EPA and Ohio EPA oversight. Soil sampling is performed both by Norfolk Southern contractors and EPA contractors. Air…
- Last published:
-
Obtaining an RMP ID Number
How can a facility subject to the Risk Management Plan (RMP) requirements obtain its RMP ID number? The owner or operator of a regulated RMP facility that has already submitted an RMP, may obtain the facility's identification number (RMP ID Number) by contacting the RMP Reporting Center (703-227-7650). An RMP-covered…
- Last published:
-
Does EPA have enforcement authority for the risk management program regulations?
Yes. Under §113 of the CAA, the Agency has the authority to bring administrative and judicial actions against violators. Judicial actions can be civil and criminal in nature. Section 113(a)(3) authorizes the Agency to order violators to comply with the risk management program regulations. Under section 113(b), the Agency may…
- Last published:
-
Criteria for selecting stationary sources to audit
What criteria will be used to select stationary sources for periodic compliance audits of risk management plans (RMPs) submitted under 40 CFR Part 68, Subpart G? The implementing agency will, according to the regulations at 40 CFR §68.220(b), select stationary sources for audits based on any of the following criteria…
- Last published:
-
Is there a citizen suit provision applicable to RMP?
Is there a citizen suit provision applicable to CAA §112 and the risk management program rule? Yes, section 304 of the CAA includes a citizen suit provision for violations of emission standards or limitations promulgated under the Act.
- Last published:
-
Accessing RMP Data
Is Risk Management Plan (RMP) data available to the public and, if so, where can it be found? Risk Management Plans (RMPs) prepared and submitted pursuant to CAA section 112(r) are, by statute, available to the public. Members of the general public may obtain RMP data by visiting a designated…
- Last published:
-
How may state and local rules be more stringent?
In what ways may state and local rules be more stringent? Does this document ( General Risk Management Program Guidance ) provide guidance on state and local differences? States and localities may impose more detailed requirements, such as requiring more documentation or more frequent reporting, specifying hours of training or…
- Last published:
-
Underground Storage Tanks in SPCC Plans
If a gas station that has less than 42,000 gallons completely buried oil storage capacity and no aboveground oil storage capacity installs a new aboveground tank with a capacity greater than 1,320 gallons, must the facility’s Spill Prevention, Control, and Countermeasure (SPCC) Plan address the underground storage tanks (USTs) in…
- Last published:
-
Container capacity less than 55 gallons
Do facilities need to consider containers that are less than 55 gallons for applicability under 40 CFR Part 112? No. The third column of page 47066 of the July 17, 2002 Preamble states that "You need only count containers of 55 gallons or greater in the calculation of the regulatory…
- Last published:
-
What is a farm for purposes of the SPCC Rule?
In the December 2006 amendments to the SPCC Rule, EPA defined a farm as "a facility on a tract of land devoted to the production of crops or raising of animals, including fish, which produced and sold, or normally would have produced and sold, 1,000 or more of agricultural products…
- Last published:
-
Examples of an agent of a Professional Engineer
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) or an agent of the PE must visit and examine the facility before the PE certifies an SPCC Plan (40 CFR §112.3(d)). What are some examples of an agent of a PE? An agent of a…
- Last published:
-
Oil-filled equipment capacity
When counting against the 1,320 aboveground storage capacity threshold, would operational storage of oil (such as in a hydraulic press) be used? Oil which is contained in equipment is required to be factored into the storage capacity for the facility even though the oil may be only used for ancillary…
- Last published:
-
If your farm does not have fuel storage that will flow into US waters by a ditch, river, stream, or lake, do you have to prepare a SPCC Plan?
No. EPA suggests you use a common sense approach. If one of your oil storage tanks leaks, and the spilled oil would not flow into navigable waters or adjoining shorelines, you do not have to prepare a Plan. Remember that you still have the responsibility to clean up any spilled…
- Last published: