Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Water Management Update Total results: 9
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 49
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- Miscellaneous SPCC Total results: 8
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- RMP*Comp Total results: 7
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- Program Levels Total results: 16
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 24 results
-
Redoing calculations if RMP*Comp is updated
Will RMP*Comp be updated? If so, would I have to redo calculations I might already have made with an earlier version? No, you do not have to redo your work if you have already completed your consequence analyses. RMP*Comp is based on the EPA's Offsite Consequence Analysis Guidance (OCA Guidance)…
- Last published:
-
Different distances to toxic endpoints with different versions of RMP*Comp
I've noticed that for certain chemicals, RMP*Comp gives substantially different distances to the toxic endpoint than previous versions. Why? In the current version of RMP*Comp, we have incorporated new chemical-specific distance tables for ammonia, chlorine, and sulfur dioxide. The generic tables are still used for other chemicals (you can see…
- Last published:
-
Distance to endpoint calculations used by RMP*Comp
Does RMP*Comp perform some math or modelling in order to arrive at an endpoint distance, or is it simply interpolating from the tables in the EPA's Offsite Consequence Analysis Guidance (OCA Guidance)? RMP*Comp follows the procedures set out in the OCA Guidance . This means that for some scenarios, the…
- Last published:
-
Will there be an increase in turbidity (cloudiness or muddiness) or silt in the streams?
The increased flow from this work is expected to be minimal and should not impact turbidity or silt.
- Last published:
-
Will returning the natural flow of water to Sulphur Run disturb areas with sheen?
Conditions in the streams are much improved because of previous cleanup work conducted in 2023. Although oily sheens remain, they are settled in the sediment and do not impact surface water unless disturbed. The increased water flow to Sulphur Run will be minimal and is not expected to disturb sheen…
- Last published:
-
What changes did EPA finalize to the SPCC Rule in December 2006?
The revised rule modifies requirements for facilities with smaller oil storage capacity and specific types of oil-filled operating equipment. If a facility has 10,000 gallons or less in aggregate aboveground oil storage capacity and the facility meets the oil discharge history criteria, then an owner/operator of a facility may prepare…
- Last published:
-
SPCC change in ownership
If there is a change in ownership at a facility, can the facility operate under the same SPCC Plan without the certification from a professional engineer (PE)? If no change in procedures has been made, it may still be feasible to operate under the existing SPCC Plan. The information in…
- Last published:
-
Liability of oil retailers at SPCC regulated farm
If a farm is out of compliance of Spill Prevention, Control, and Countermeasure (SPCC) regulations and is checked by EPA and/or has a spill, is the retailer that filled the tank liable? No, EPA considers the oil tank owner responsible for lack of compliance.
- Last published:
-
When can we access the streams again?
The upcoming cleanup efforts will focus on oil-based compounds which, based on recent sampling, are the only derailment-related contaminants remaining in the creeks. Please obey all posted signage and continue to avoid access in Sulphur and Leslie Runs until further notice.
- Last published:
-
What is the status of the cleanup at the site?
In October 2023, it was announced that the excavation work, which removed the known areas of contaminated soil at the derailment site, was complete. The soil double-check work has been ongoing for months and is expected to continue into the fall. The timeline of our expected completion plans for final…
- Last published:
-
Why collect the rainwater and snowmelt around the derailment site?
Until excavation work and confirmatory sampling are completed, any wastewater collected from the derailment site is considered a “listed hazardous waste” because it may have come into contact with vinyl chloride or other hazardous contaminants from the derailment. Even though the soil contamination has been removed, our double-check work is…
- Last published:
-
What has changed?
For the past several months as the collected wastewater has gone through the system, sample results have shown that the wastewater meets the standards set for vinyl chloride and other derailment-caused contaminants without treatment, meaning it can be disposed of as non-hazardous waste. Testing of the collected wastewater will continue…
- Last published:
-
RMP*Comp and emergency response
Can I use RMP*Comp for emergency response? No. It's a planning tool. Many other tools are available for response, including ALOHA . You can learn more by reading CAMEO tools for RMP .
- Last published:
-
Minimum and Maximum Distance to Endpoint
The Chemical Accident Prevention Provisions require the completion of a worst-case release scenario analysis (40 CFR §68.25). This analysis includes estimating the greatest distance to endpoint as defined by the parameters in §68.22. Is there a required minimum or maximum distance for the distance to endpoint in the worst case…
- Last published:
-
PE certifying a technical amendment
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) must certify all technical amendments to an existing SPCC Plan (§112.5(c)). When certifying a technical change to an existing SPCC Plan, does the PE have to inspect and certify the entire Plan or only the amended…
- Last published: