Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
-
Asbestos
Total results: 141
- Information for Owners and Managers of Buildings that Contain Asbestos Total results: 31
- Asbestos-Contaminated Vermiculite Insulation Total results: 4
- Asbestos and School Buildings Total results: 94
- Learn About Asbestos Total results: 2
- Protect Your Family from Exposures to Asbestos Total results: 9
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
-
Renovations Covered by the RRP Rule
Total results: 84
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- Emergency Renovations Total results: 5
- In General Total results: 9
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
-
Renovations Covered by the RRP Rule
Total results: 84
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- RMP*Comp Total results: 7
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- Program Levels Total results: 16
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Information for Owners and Managers of Buildings that Contain Asbestos
- Renovations Covered by the RRP Rule
- RMP*Comp
Displaying 1 - 15 of 122 results
-
If an Asbestos Hazard Emergency Response Act (AHERA) accredited-training course is taught by someone other than instructors certified by the state or the Environmental Protection Agency (EPA), can an approved contractor/instructor sign certificates?
No. An EPA Asbestos Hazard Emergency Response Act (AHERA) accredited training course must be taught by EPA/state approved instructors and only those approved instructors may issue AHERA approved training course certificates. Other Frequent Questions about Asbestos Learn About Asbestos Asbestos and School Buildings Information for Owners and Managers of Buildings…
- Last published:
-
Is there a formal requirement that an Asbestos Model Accreditation Plan (MAP) asbestos training course must have a training manual?
Accredited trainers are not required to have a formal training manual, per se. According to the Asbestos Model Accreditation Plan (MAP), at Unit III, (A)(3), (A)(4)(d) and (A)(5) of appendix C to 40 CFR part 763, subpart E, a trainer’s application for course approval must include the course curriculum, a…
- Last published:
-
Redoing calculations if RMP*Comp is updated
Will RMP*Comp be updated? If so, would I have to redo calculations I might already have made with an earlier version? No, you do not have to redo your work if you have already completed your consequence analyses. RMP*Comp is based on the EPA's Offsite Consequence Analysis Guidance (OCA Guidance)…
- Last published:
-
Different distances to toxic endpoints with different versions of RMP*Comp
I've noticed that for certain chemicals, RMP*Comp gives substantially different distances to the toxic endpoint than previous versions. Why? In the current version of RMP*Comp, we have incorporated new chemical-specific distance tables for ammonia, chlorine, and sulfur dioxide. The generic tables are still used for other chemicals (you can see…
- Last published:
-
Distance to endpoint calculations used by RMP*Comp
Does RMP*Comp perform some math or modelling in order to arrive at an endpoint distance, or is it simply interpolating from the tables in the EPA's Offsite Consequence Analysis Guidance (OCA Guidance)? RMP*Comp follows the procedures set out in the OCA Guidance . This means that for some scenarios, the…
- Last published:
-
What are the requirements under the Asbestos Hazard Emergency Response Act (AHERA) for refresher training for a person who wants to "step down" his/her certification from contractor/supervisor status to worker status?
If such a person takes contractor/supervisor refresher courses on an annual basis, that person may perform in both the contractor/supervisor and worker roles. If, however, the person chooses only to take annual worker refresher courses, that person may continue to act in the role of an accredited worker but loses…
- Last published:
-
What is the applicability of Federal asbestos inspector accreditation requirements under the Asbestos Hazard Emergency Response Act (AHERA) to real estate appraisers?
Real estate appraisers may not assess the suspected presence, location, or condition of asbestos in a school building or a public and commercial building during an appraisal unless they are accredited pursuant to the Toxic Substances Control Act (TSCA) and the Asbestos Model Accreditation Plan (MAP), as conducting an examination…
- Last published:
-
When would a conflict of interest exist among Asbestos Model Accreditation Plan (MAP)-accredited personnel?
A conflict of interest with respect to Asbestos Model Accreditation Plan (MAP)-accredited personnel would exist if, for example, the management planner and abatement contractor worked for the same firm. The planner might recommend to the LEA more expensive response actions than are necessary in the management plan. Other Frequent Questions…
- Last published:
-
The training requirements specified in 40 CFR part 763 appear to apply to projects (excluding small-scale, short-duration projects) involving interior building components. Specifically, is roofing work and other exterior work covered?
Worker training requirements specified in 40 CFR part 763, including those for accreditation under the Asbestos Model Accreditation Plan (MAP), apply to interior building projects done in schools and public and commercial buildings. Additionally, the asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP), Occupational Safety and Health Administration (OSHA)…
- Last published:
-
How does a company become a provider of Asbestos Model Accreditation Plan (MAP)-accredited asbestos training courses?
Individuals or groups wishing to sponsor training courses for disciplines required to be accredited under section 206(b)(1)(A) of the Toxic Substances Control Act (TSCA) may apply for approval from states that have accreditation program requirements that are at least as stringent as the EPA Asbestos Model Accreditation Plan (MAP). For…
- Last published:
-
A home sustained flooding as a result of a hurricane. Once the flood water recedes, my firm must make the necessary renovations. How do the record keeping requirements apply to an emergency renovation?
Emergency renovations (other than interim controls performed in response to a child with an elevated blood lead level) are exempt from the training, certification, sign posting, waste handling and containment requirements of the Lead Renovation, Repair and Painting (RRP) Rule only to the extent necessary to respond to the emergency…
- Last published:
-
Does the Renovation, Repair, and Painting (RRP) Rule apply to renovations done in an apartment between tenants? Does it matter if children live in other apartments in the building?
Answer: Temporarily unoccupied or vacant rental housing is not exempt from the requirements of the RRP Rule. Question Number: 23002-15669 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Does drilling holes in window frames to install window treatments such as shades and shutters qualify as minor repair and maintenance?
Yes, as long as the installation does not disturb more than six square feet of painted surface per room within a 30-day period. Question Number: 23002-15404 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Are renovations performed on detached garages, sheds and other detached outbuildings on the property subject to the RRP Rule?
Yes. EPA interprets target housing to include pre-1978 buildings or structures that are (1) located on the residential portion of the property, and (2) associated with the residential use of the property. As a practical matter, the entire property of most urban and suburban residential lots is normally considered to…
- Last published:
-
I have a for-profit business where I purchase residential properties and renovate them. Is this type of renovation work on pre-1978 properties covered by the Lead Renovation, Repair, and Painting (RRP) Rule?
Yes. Individuals who buy, renovate and sell pre-1978 residential properties for a profit (i.e., house flippers) or lease pre-1978 residential properties (i.e., landlords), and do the renovation work themselves, are performing renovations for compensation and are therefore subject to all requirements under the RRP Rule . You must be a…
- Last published: