Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
-
Asbestos
Total results: 141
- Asbestos-Contaminated Vermiculite Insulation Total results: 4
- Asbestos and School Buildings Total results: 94
- Information for Owners and Managers of Buildings that Contain Asbestos Total results: 31
- Learn About Asbestos Total results: 2
- Protect Your Family from Exposures to Asbestos Total results: 9
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 49
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- RMP*Comp Total results: 7
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- Program Levels Total results: 16
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 23 results
-
What is Vermiculite?
Vermiculite is the mineralogical name given to hydrated laminar magnesium-aluminum-iron silicate that resembles mica in appearance. All vermiculite ores contain a range of other minerals that were formed along with the vermiculite in the rock. Vermiculite ores from some sources have been found to contain asbestos minerals but asbestos is…
- Last published:
-
Redoing calculations if RMP*Comp is updated
Will RMP*Comp be updated? If so, would I have to redo calculations I might already have made with an earlier version? No, you do not have to redo your work if you have already completed your consequence analyses. RMP*Comp is based on the EPA's Offsite Consequence Analysis Guidance (OCA Guidance)…
- Last published:
-
Different distances to toxic endpoints with different versions of RMP*Comp
I've noticed that for certain chemicals, RMP*Comp gives substantially different distances to the toxic endpoint than previous versions. Why? In the current version of RMP*Comp, we have incorporated new chemical-specific distance tables for ammonia, chlorine, and sulfur dioxide. The generic tables are still used for other chemicals (you can see…
- Last published:
-
Distance to endpoint calculations used by RMP*Comp
Does RMP*Comp perform some math or modelling in order to arrive at an endpoint distance, or is it simply interpolating from the tables in the EPA's Offsite Consequence Analysis Guidance (OCA Guidance)? RMP*Comp follows the procedures set out in the OCA Guidance . This means that for some scenarios, the…
- Last published:
-
What is the definition of “overburdened community” that is relevant for EPA Actions and Promising Practices?
EPA Actions and Promising Practices apply the description of overburdened communities articulated in EPA’s Plan EJ 2014. The term is used to describe the minority, low‐income, tribal and indigenous populations or communities in the United States that potentially experience disproportionate environmental harms and risks due to exposures or cumulative impacts…
- Last published:
-
Are permit applicants required to adopt the Promising Practices?
EPA is not requiring permit applicants to adopt the Promising Practices. Promising Practices are simply that: good ideas in the form of suggestions to permit applicants. Permit applicants may benefit from applying these Promising Practices. EPA hopes that when permit applicants practice early and meaningful dialogue with the community, they…
- Last published:
-
EPA Actions does not require EPA regional offices to prioritize the same types of permits and adopt the same outreach activities. Why doesn’t EPA require regional offices to always prioritize certain permits and always do certain outreach activities?
EPA Actions strikes an important balance between national consistency and regional flexibility. The Agency‐wide guidelines establish national consistency by providing EPA’s expectations for the regional implementation plans. At the same time, EPA recognizes that the regional offices need the flexibility to take actions suited to the types of permits and…
- Last published:
-
Does EPA Actions apply to permits that are jointly issued by EPA and a state, tribal, or local permitting authority with partially delegated permitting authority?
EPA regional offices will decide whether a permit that EPA jointly issues with a state, tribal, or local permitting authority should be considered for prioritization for enhanced outreach as described in EPA Actions on a case‐by‐case basis. EPA will take into account its role and authority in issuing the specific…
- Last published:
-
Why doesn’t EPA do enhanced outreach for every permit?
Robust public outreach and engagement can consume a substantial amount of resources from all stakeholders in a permitting process and would not be warranted for every permit action. EPA recognizes that its regional offices cannot enhance engagement for every EPA‐issued permit and that overburdened communities might be overwhelmed with process…
- Last published:
-
How will an EPA regional office determine whether a permitted activity may have significant public health or environmental impacts?
Permit applications provide information on the proposed project consistent with the requirements of particular statutes and regulations. EPA may also do its own assessment of the environmental and public health impacts of a proposed project, using modeling and monitoring data for example. Such information would inform an EPA regional office’s…
- Last published:
-
How will EPA Actions apply to EPA‐permitted activities that may impact multiple EPA regions?
A permitted activity could potentially impact an area that straddles two or more EPA regions. The EPA region where the permitted activity is located usually has the lead for issuing the permit. EPA regions with the lead for issuing the permit routinely engage other regions impacted by the permitted activity…
- Last published:
-
What are some uses of Vermiculite?
Vermiculite has been used in various industries for over 80 years. It is used in the construction, agricultural, horticultural and industrial markets. Examples of products that contain vermiculite include potting soil mixes, loose fill insulation, and packing material. For more information, visit the EPA webpage: Protect Your Family from Asbestos-Contaminated…
- Last published:
-
RMP*Comp and emergency response
Can I use RMP*Comp for emergency response? No. It's a planning tool. Many other tools are available for response, including ALOHA . You can learn more by reading CAMEO tools for RMP .
- Last published:
-
Minimum and Maximum Distance to Endpoint
The Chemical Accident Prevention Provisions require the completion of a worst-case release scenario analysis (40 CFR §68.25). This analysis includes estimating the greatest distance to endpoint as defined by the parameters in §68.22. Is there a required minimum or maximum distance for the distance to endpoint in the worst case…
- Last published:
-
If a permit is prioritized for enhanced outreach, does this mean that EPA will require stricter emission or discharge limits, or deny a permit?
An EPA regional’ office’s decisions on whether to issue a permit and, if so, the conditions to impose within a permit are distinct from the EPA regional office’s decisions about the outreach EPA may perform during the permitting process. EPA’s decisions on whether to issue a permit and what permit…