Search Frequent Questions
Filter By:
- Southeast Minnesota Groundwater Total results: 11
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Recordkeeping and Reporting Requirements Total results: 6
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 18
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- RMP*Comp Total results: 7
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- Program Levels Total results: 16
Active filters:
Remove all filtersDisplaying 1 - 15 of 24 results
-
Redoing calculations if RMP*Comp is updated
Will RMP*Comp be updated? If so, would I have to redo calculations I might already have made with an earlier version? No, you do not have to redo your work if you have already completed your consequence analyses. RMP*Comp is based on the EPA's Offsite Consequence Analysis Guidance (OCA Guidance)…
- Last published:
-
Different distances to toxic endpoints with different versions of RMP*Comp
I've noticed that for certain chemicals, RMP*Comp gives substantially different distances to the toxic endpoint than previous versions. Why? In the current version of RMP*Comp, we have incorporated new chemical-specific distance tables for ammonia, chlorine, and sulfur dioxide. The generic tables are still used for other chemicals (you can see…
- Last published:
-
Distance to endpoint calculations used by RMP*Comp
Does RMP*Comp perform some math or modelling in order to arrive at an endpoint distance, or is it simply interpolating from the tables in the EPA's Offsite Consequence Analysis Guidance (OCA Guidance)? RMP*Comp follows the procedures set out in the OCA Guidance . This means that for some scenarios, the…
- Last published:
-
If a certified renovator is an employee of the certified firm, can the firm maintain all required records (those required of the firm and of the certified renovator); understanding that the certified renovator must also keep a copy of his certification as well as employee training records/documentation on the jobsite?
Answer: The renovation firm is the entity responsible for retaining and making available to EPA all records necessary to demonstrate compliance with the RRP Rule for a period of three years following completion of the renovation. The certified renovator is responsible for preparing the records demonstrating that the renovation was…
- Last published:
-
Will boiling my water help?
No. Boiling water will NOT reduce nitrate levels. In fact, it will make the level of nitrate worse because some of the water will evaporate but the nitrate will not. This increases the concentration of nitrate in water.
- Last published:
-
Under the RRP Rule, can the required records and documentation be stored electronically rather than as paper copies?
Answer: Yes. The renovation firm is responsible for retaining and making available to EPA all records necessary to demonstrate compliance with the Lead Renovation, Repair, and Painting (RRP) Rule for a period of three years following completion of the renovation. The RRP Rule does not specify the format in which…
- Last published:
-
Is it safe to shower or bathe in water if it is over the nitrate MCL of 10 mg/L?
Nitrate is only a concern for ingestion (eating and drinking). It is not absorbed through your skin. People who install filter systems for nitrate often install them just for their kitchen sink faucet, and they use that faucet for their cooking and drinking water.
- Last published:
-
What is EPA doing?
EPA is working with its governmental partners and other stakeholders to investigate and address the issue. Most recently, EPA issued a letter to the state of Minnesota requesting a plan of action to address nitrate contamination in drinking water.
- Last published:
-
What should I do if my water has elevated nitrates and/or exceeds the MCL?
If nitrate exceeds the MCL of 10 mg/L, you should find a safe alternative drinking water supply. The quickest thing to do is to begin using bottled water for drinking. Another option is to install a treatment that will remove nitrate from your water such as reverse osmosis or a…
- Last published:
-
Why is nitrate contamination a concern?
Nitrate is an acute contaminant, meaning that health effects can occur immediately (I.e. within hours or days) of short-term exposure. Too much nitrate in your body makes it harder for red blood cells to carry oxygen. While most people recover quickly, this can be very dangerous for infants and some…
- Last published:
-
Under the RRP Rule, can the certified renovator comply with the rules by keeping records regarding his certification and employee training electronically, provided he can display them on a hand held device or laptop on the job site?
Yes. The Lead Renovation, Repair, and Painting (RRP) Rule does not specify the format in which these documents must be kept, but they must be available at the work site. Documents are not available if they cannot be viewed. Certified renovators must have with them at the work site copies…
- Last published:
-
How do I have my drinking water tested in the future?
Minnesota Department of Health (MDH) recommends you use an accredited laboratory to test your water. Contact an accredited laboratory to get sample containers and instructions or ask your county environmental or public health services if they provide well testing services. Accredited Labs in Minnesota Accepting Drinking Water Samples from Private…
- Last published:
-
RMP*Comp and emergency response
Can I use RMP*Comp for emergency response? No. It's a planning tool. Many other tools are available for response, including ALOHA . You can learn more by reading CAMEO tools for RMP .
- Last published:
-
Minimum and Maximum Distance to Endpoint
The Chemical Accident Prevention Provisions require the completion of a worst-case release scenario analysis (40 CFR §68.25). This analysis includes estimating the greatest distance to endpoint as defined by the parameters in §68.22. Is there a required minimum or maximum distance for the distance to endpoint in the worst case…
- Last published:
-
If a general contractor and one or more subcontractors are involved in a single renovation project, which persons or entities are responsible for preparing, retaining and making available the necessary records?
Answer: The certified renovator, whether assigned by a general contractor or subcontractor, is responsible for preparing the records demonstrating that the renovation was conducted in compliance with the work practice standards, including training provided to non-certified workers. All renovation firms involved in a project share the responsibility for retaining and…
- Last published: