- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 18
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- RMP*Comp Total results: 7
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- Program Levels Total results: 16
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 17 results
-
Redoing calculations if RMP*Comp is updated
Will RMP*Comp be updated? If so, would I have to redo calculations I might already have made with an earlier version? No, you do not have to redo your work if you have already completed your consequence analyses. RMP*Comp is based on the EPA's Offsite Consequence Analysis Guidance (OCA Guidance)…
- Last published:
-
Different distances to toxic endpoints with different versions of RMP*Comp
I've noticed that for certain chemicals, RMP*Comp gives substantially different distances to the toxic endpoint than previous versions. Why? In the current version of RMP*Comp, we have incorporated new chemical-specific distance tables for ammonia, chlorine, and sulfur dioxide. The generic tables are still used for other chemicals (you can see…
- Last published:
-
Distance to endpoint calculations used by RMP*Comp
Does RMP*Comp perform some math or modelling in order to arrive at an endpoint distance, or is it simply interpolating from the tables in the EPA's Offsite Consequence Analysis Guidance (OCA Guidance)? RMP*Comp follows the procedures set out in the OCA Guidance . This means that for some scenarios, the…
- Last published:
-
Who is responsible for controlling dust and debris from renovation waste once the waste container or truck used to transport the waste leaves the renovation site?
When a renovation firm transports waste from renovation activities, the firm must contain the waste to prevent release of dust and debris. The Lead Renovation, Repair and Painting (RRP) Rule does not address the responsibilities of other entities. EPA recommends consulting with state and local waste disposal authorities to learn…
- Last published:
-
Can you explain who has authority over the active mine vs the Superfund site?
The Montana Department of Environmental Quality has regulatory authority over the active mine. EPA is the lead agency for the Silver Bow Creek/Butte Area Superfund Site and works in consultation with MDEQ to ensure the cleanup of the Site.
- Last published:
-
For purposes of cleaning the work area following a renovation, is the interior floor of a garage considered interior or exterior space?
In general, the interior floor of a garage is considered an interior space for purposes of post-renovation cleanup. EPA recognizes the fact that it may occasionally be impossible for firms to meet all of the cleaning and verification requirements under the Rule for garage floors such as those that are…
- Last published:
-
If a renovator uses the required practices to remove containment and clean a work area, then performs successful cleaning verification, can the project then be done using uncertified workers and without work practices required by the RRP Rule?
Yes, as long as the balance of the project can be completed without disturbing a painted surface. Question Number: 23002-18385 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
My firm is replacing windows on a pre-1978 home. The homeowner already scraped and repainted their house but did not follow lead-safe work practices, leaving paint chips scattered throughout the landscaping. How best should I proceed?
A firm working on a property that is already contaminated with paint chips, dust, debris and residue must proceed by containing the work area for the renovation, and complying with all cleaning requirements under the Lead Renovation, Repair and Painting (RRP) Rule for that work area. Paint chips, dust, debris…
- Last published:
-
Under the RRP Rule, do paint chips and debris need to be removed from protective sheeting even if such chips and debris can be effectively contained by the sheeting or the sealed container the sheeting is contained in for disposal?
Yes. After the renovation has been completed, the firm must clean the work area until no dust, debris, or residue remains. The first cleaning step required by the Lead Renovation, Repair, and Painting (RRP) Rule is to collect all paint chips and debris and, without dispersing any of it, seal…
- Last published:
-
When waste from renovations has been removed from the work area and placed in on-site storage, may the waste be stored in a covered waste container or must it all be bagged for disposal?
Properly implemented, either option can meet the requirements of the Lead Renovation, Repair and Painting (RRP) Rule . At the conclusion of each work day and at the conclusion of the renovation, waste that has been collected from renovation activities must be stored under containment, in an enclosure, or behind…
- Last published:
-
RMP*Comp and emergency response
Can I use RMP*Comp for emergency response? No. It's a planning tool. Many other tools are available for response, including ALOHA . You can learn more by reading CAMEO tools for RMP .
- Last published:
-
Minimum and Maximum Distance to Endpoint
The Chemical Accident Prevention Provisions require the completion of a worst-case release scenario analysis (40 CFR §68.25). This analysis includes estimating the greatest distance to endpoint as defined by the parameters in §68.22. Is there a required minimum or maximum distance for the distance to endpoint in the worst case…
- Last published:
-
Local meteorological data for alternative release scenarios
For alternate release scenarios, RMP*Comp uses set values for meteorological conditions like humidity, wind speed, temperature, stability class, and so on. Is there a way to change those values? I want to use meteorology data from my own location. RMP*Comp indeed uses fixed values for certain atmospheric parameters, and does…
- Last published:
-
Different results using ALOHA and RMP*Comp
I tried running the same scenarios in ALOHA and in RMP*Comp. I got different answers. Why? The results you obtain using RMP*Comp may not closely match the results you obtain running the same release scenario in a more sophisticated air dispersion model such as ALOHA or DEGADIS. That's because of…
- Last published:
-
Are components removed from the home to be cleaned up and reused subject to the waste handling requirements in the rule?
Answer : While components to be reused rather than disposed of are not considered waste for the purposes of the Lead Renovation, Repair, and Painting (RRP) Rule , it is likely that, even if they do not contain lead-based paint, they are contaminated with dust or debris from the project…
- Last published: