Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Residential soil sampling and water testing Total results: 10
- Water Management Update Total results: 9
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- RMP*Comp Total results: 7
- Applicability/General Duty Clause Total results: 69
- Emergency Response Total results: 6
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- Program Levels Total results: 16
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 26 results
-
Redoing calculations if RMP*Comp is updated
Will RMP*Comp be updated? If so, would I have to redo calculations I might already have made with an earlier version? No, you do not have to redo your work if you have already completed your consequence analyses. RMP*Comp is based on the EPA's Offsite Consequence Analysis Guidance (OCA Guidance)…
- Last published:
-
Different distances to toxic endpoints with different versions of RMP*Comp
I've noticed that for certain chemicals, RMP*Comp gives substantially different distances to the toxic endpoint than previous versions. Why? In the current version of RMP*Comp, we have incorporated new chemical-specific distance tables for ammonia, chlorine, and sulfur dioxide. The generic tables are still used for other chemicals (you can see…
- Last published:
-
Distance to endpoint calculations used by RMP*Comp
Does RMP*Comp perform some math or modelling in order to arrive at an endpoint distance, or is it simply interpolating from the tables in the EPA's Offsite Consequence Analysis Guidance (OCA Guidance)? RMP*Comp follows the procedures set out in the OCA Guidance . This means that for some scenarios, the…
- Last published:
-
Where can I find the East Palestine City Park soil sampling results?
You can find East Palestine City Park soil sampling results at: East Palestine City Park soil sampling results
- Last published:
-
Will there be an increase in turbidity (cloudiness or muddiness) or silt in the streams?
The increased flow from this work is expected to be minimal and should not impact turbidity or silt.
- Last published:
-
Will returning the natural flow of water to Sulphur Run disturb areas with sheen?
Conditions in the streams are much improved because of previous cleanup work conducted in 2023. Although oily sheens remain, they are settled in the sediment and do not impact surface water unless disturbed. The increased water flow to Sulphur Run will be minimal and is not expected to disturb sheen…
- Last published:
-
What were the results from the phase 1 of soil sampling?
Phase 1 of soil sampling is complete, and we have received most of the preliminary data. The vast majority of results are within typical ranges for soil. Samples taken on private properties are all within typical soil levels, and only a few samples taken along public right-of-way (next to roads…
- Last published:
-
What are the next steps?
The sampling data will be evaluated to determine if additional sampling or other action is necessary (additional information will be made available soon). Evaluation of results and future sampling plans will guide EPA’s future work and environmental monitoring in the East Palestine area.
- Last published:
-
How were soil sample locations chosen?
The study area was determined based on evacuation zones, plume modeling, field observations, and areas most likely to be impacted by the vent and burn. Event Reconstruction Plume Map
- Last published:
-
What is the status of the cleanup at the site?
In October 2023, it was announced that the excavation work, which removed the known areas of contaminated soil at the derailment site, was complete. The soil double-check work has been ongoing for months and is expected to continue into the fall. The timeline of our expected completion plans for final…
- Last published:
-
When can we access the streams again?
The upcoming cleanup efforts will focus on oil-based compounds which, based on recent sampling, are the only derailment-related contaminants remaining in the creeks. Please obey all posted signage and continue to avoid access in Sulphur and Leslie Runs until further notice.
- Last published:
-
What has changed?
For the past several months as the collected wastewater has gone through the system, sample results have shown that the wastewater meets the standards set for vinyl chloride and other derailment-caused contaminants without treatment, meaning it can be disposed of as non-hazardous waste. Testing of the collected wastewater will continue…
- Last published:
-
Why collect the rainwater and snowmelt around the derailment site?
Until excavation work and confirmatory sampling are completed, any wastewater collected from the derailment site is considered a “listed hazardous waste” because it may have come into contact with vinyl chloride or other hazardous contaminants from the derailment. Even though the soil contamination has been removed, our double-check work is…
- Last published:
-
Where can I find soil sampling data and results?
EPA will release validated (final) and non-validated (preliminary) soil sampling results from East Palestine and surrounding Ohio and Pennsylvania areas as they become available. As soon as the quality of non-validated preliminary data has been fully assessed and documented, EPA will post validated data on the East Palestine, Ohio Train…
- Last published:
-
What is the status of the cleanup work in the streams?
There is still more work to be done in Leslie and Sulphur Runs. EPA and Ohio EPA are reviewing the Norfolk Southern sediment mitigation workplan. More cleaning will likely start before April and is expected to continue through July.
- Last published: