Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Assignment of pathways to renewable fuel Total results: 4
- Application of standards Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Grandfathering Total results: 8
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 49
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Emergency Response Total results: 6
- Applicability/General Duty Clause Total results: 69
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- Program Levels Total results: 16
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 19 results
-
Determining frequency of coordination activities
The Risk Management Program regulations require owners and operators of stationary sources to coordinate their response needs annually, or more frequently if necessary, with local emergency planning and response organizations (40 CFR §68.93(a)). Are stationary sources responsible for determining if coordination activities should occur more often than annually? Ultimate responsibility…
- Last published:
-
How do I Obtain the Populations for Each of the MOVES Source Types?
See More Frequent Questions about MOVES and Related Models . To output vehicle populations, when setting up your RunSpec select the "Inventory" calculation type from the Scale panel and the "Population" activity option from the General Output panel of the MOVES GUI. The movesactivityoutput table in your MOVES output database…
- Last published:
-
How are Counties Mapped to Fuel Regions in MOVES? How Can I Substitute Alternate Fuel Formulations?
See More Frequent Questions about MOVES and Related Models . The RegionCounty table in the MOVES default database maps each county to a MOVES fuel region (defined by regionCodeID). If you are conducting a County or Project Scale Run, you do not need to modify this table to use alternate…
- Last published:
-
Was Jatropha analyzed for this final rule and, if so, what D-code applies?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The GHG emissions performance of a Jatropha-based pathway was not analyzed for the final rule because sufficient information was not available. Since EPA has not yet assigned a D code for this pathway, a producer cannot generate RINs…
- Last published:
-
Under what conditions might a renewable fuel produced under an approved pathway in the RFS regulations qualify for use in Navy applications?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Background: The U.S. Navy is seeking to blend biofuels with fossil-based fuels, such as F-76 fuel, which are often used in Navy marine vessels. The Navy asked EPA for guidance on whether such biofuels would be treated as…
- Last published:
-
Who Must Develop an Emergency Response Program?
The risk management program regulations require the owner or operator of a covered stationary source to develop and implement an emergency response program as described in 40 CFR §68.95, which must include an emergency response plan, emergency response equipment procedures, employee training, and procedures to ensure the program is up-to-date…
- Last published:
-
Was Jatropha analyzed for this final rule and, if so, what D-code applies?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The GHG emissions performance of a Jatropha-based pathway was not analyzed for the final rule because sufficient information was not available. Since EPA has not yet assigned a D code for this pathway, a producer cannot generate RINs…
- Last published:
-
How does the Fuel Wizard Determine which Fuel Formulations to Modify?
See More Frequent Questions about MOVES and Related Models . The Fuel Wizard only works on fuel formulations that are in your county database (CDB) and it "edits" them to comply with the alterations you provide. If you wish to create a set of alternate fuels, you will need to…
- Last published:
-
Where Does EPA Obtain Default Vehicle Miles Traveled (VMT)?
See More Frequent Questions about MOVES and Related Models . MOVES gets default national vehicle miles traveled (VMT) values from the Highway Performance Monitoring System (HPMS) of the Federal Highway Administration, which collects VMT information from every state. Although this is a good source of consistent total VMT information, the…
- Last published:
-
How Do I Create my Own I/M Program Input Table Using the "Create Template" Option?
See More Frequent Questions about MOVES and Related Models . If you already have an I/M program in your area, you should always begin by exporting the default I/M program in MOVES, reviewing it, making any changes to the default program, and re-importing it, rather than trying to fill a…
- Last published:
-
Where Can I Find Default HPMSBaseYearVMT Values for a Specific County?
See More Frequent Questions about MOVES and Related Models . MOVES does calculate default values for VMT for each calendar year for each county. Since these values are calculated, they are not found in any table in the default database. If you wish to obtain the default estimates, you will…
- Last published:
-
Why Does the "hourvmtfraction" Table in the MOVES Default Database Include Fractions for roadTypeID 1 (off-network)?
See More Frequent Questions about MOVES and Related Models . The original concept for MOVES assumed that there would be some vehicle miles traveled (VMT) not accounted for in the other four road types. This remaining VMT would be accounted for in roadTypeID=1. As the model developed, it was decided…
- Last published:
-
Can Programs Other Than Microsoft Excel be Used to Edit Input Database Files?
See More Frequent Questions about MOVES and Related Models . Yes. In addition to MS Excel files, in the County Data Manager/Project Data Manager, MOVES can read in other file types using ASCII text and comma separated variables.
- Last published:
-
Remote coordination with local authorities
The Risk Management Program regulations require owners and operators of stationary sources to coordinate their response needs annually, or more frequently if necessary, with local emergency planning and response organizations (40 CFR §68.93(a)). If a stationary source is in a remote location and in-person annual coordination is deemed impractical, can…
- Last published:
-
What are the Units of Road Grade in the Links Table?
See More Frequent Questions about MOVES and Related Models . The field road grade in the Links table should be entered as a percentage rather than a decimal fraction. In other words, a road grade of 4% should be entered in MOVES as 4, rather than 0.04.
- Last published: