Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Environmental Sampling and Monitoring Total results: 7
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Renewable fuel definitions Total results: 1
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Grandfathering Total results: 8
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Emergency Response Total results: 6
- Applicability/General Duty Clause Total results: 69
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- Program Levels Total results: 16
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 14 of 14 results
-
What’s the difference between air sampling and air monitoring?
Air monitoring and air sampling are two different methods of looking at air quality. Air monitoring uses electronic devices to provide real-time readings of contaminants in the air. Air sampling involves trapping air over a period of time in a container that is then sent to a laboratory for analysis…
- Last published:
-
What is EPA’s role in sampling?
EPA is part of the Unified Command consisting of different agencies to review, approve and direct Norfolk Southern’s workplans and site activities. Surface water sampling is performed by Norfolk Southern contractors, with EPA and Ohio EPA oversight. Soil sampling is performed both by Norfolk Southern contractors and EPA contractors. Air…
- Last published:
-
What is the plume map and what does it tell us?
The plume map is an “event reconstruction” based on known weather and on-site observations during a 10-hour time period after the vent-and-burn operation that occurred on Monday, February 6. It tells us where soot likely fell to the ground and where the highest concentrations of particles may be. This information…
- Last published:
-
Determining frequency of coordination activities
The Risk Management Program regulations require owners and operators of stationary sources to coordinate their response needs annually, or more frequently if necessary, with local emergency planning and response organizations (40 CFR §68.93(a)). Are stationary sources responsible for determining if coordination activities should occur more often than annually? Ultimate responsibility…
- Last published:
-
While there is no renewable fuel obligation under the RFS2 program for the production or importation of conventional jet fuel, RINs can be generated for renewable jet fuel. Is that right?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . As described in 80.1407, only gasoline and diesel fuels produced or imported into the U.S. are subject to the renewable fuel standards. Thus, only gasoline and diesel fuel volumes produced or imported by an obligated party factor into…
- Last published:
-
Who Must Develop an Emergency Response Program?
The risk management program regulations require the owner or operator of a covered stationary source to develop and implement an emergency response program as described in 40 CFR §68.95, which must include an emergency response plan, emergency response equipment procedures, employee training, and procedures to ensure the program is up-to-date…
- Last published:
-
What is split sampling?
Split sampling is a technique where multiple samples are collected from the same location at the same time and then sent to separate laboratories for analysis. Checking to see if the labs get the same or similar results is a way to determine the accuracy of the data. If there…
- Last published:
-
What work happens after contamination under and between the train tracks is removed?
After track work is complete, additional cleanup and assessments will continue. This includes shipping solid and liquid wastes off-site, excavating in areas where rail cars were staged and scrapped, and sampling and monitoring groundwater, soil, surface water, and sediment.
- Last published:
-
Columbiana County Health District has sampled my private well, will it be sampled again?
Residents will be contacted if they are within the priority zones and have signed up for private well sampling. Within 60 days after the first sample, private wells are resampled, and residents will be contacted to schedule resampling. Residents within one of the four priority zones can also schedule a…
- Last published:
-
Remote coordination with local authorities
The Risk Management Program regulations require owners and operators of stationary sources to coordinate their response needs annually, or more frequently if necessary, with local emergency planning and response organizations (40 CFR §68.93(a)). If a stationary source is in a remote location and in-person annual coordination is deemed impractical, can…
- Last published:
-
Emergency Response Coordination Activities Effective Date
The RMP Amendments finalized on January 13, 2017 included a requirement for owners or operators of a stationary source to engage in emergency response coordination activities (40 CFR §68.93). The regulatory text in 40 CFR §68.10(b) states that compliance with these activities must be completed by March 14, 2018. Because…
- Last published:
-
Are exercises required as a part of the emergency response program requirements under 40 CFR Part 68, Subpart E?
Yes. At least once each calendar year, the owner or operator of a stationary source with any Program 2 or Program 3 process must conduct an exercise of the stationary source's emergency response notification mechanisms per 40 CFR 68.90(b)(3) or 68.95(a)(1)(i), as appropriate, before December 19, 2024, and annually thereafter…
- Last published:
-
What is the East Palestine Potable Water Sampling Work Plan?
In February, EPA required Norfolk Southern to investigate drinking water sources through a work plan approved by responding agencies. The work plan is being used to monitor drinking water near the derailment site, and recently changed to include more areas for water sampling. These new areas were chosen based on…
- Last published:
-
Types of Information Relevant for Response Planning
The Risk Management Program emergency response coordination activities require the owner and operator of a stationary source to provide to the local emergency planning and response organizations: the stationary source’s emergency response plan if one exists; emergency action plan; updated emergency contact information; and any other information that local emergency…
- Last published: