Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Taggart Street Reopening Total results: 12
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Information for Do-It-Yourselfers Total results: 1
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Emergency Response Total results: 6
- Applicability/General Duty Clause Total results: 69
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- Program Levels Total results: 16
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 19 results
-
Determining frequency of coordination activities
The Risk Management Program regulations require owners and operators of stationary sources to coordinate their response needs annually, or more frequently if necessary, with local emergency planning and response organizations (40 CFR §68.93(a)). Are stationary sources responsible for determining if coordination activities should occur more often than annually? Ultimate responsibility…
- Last published:
-
Who Must Develop an Emergency Response Program?
The risk management program regulations require the owner or operator of a covered stationary source to develop and implement an emergency response program as described in 40 CFR §68.95, which must include an emergency response plan, emergency response equipment procedures, employee training, and procedures to ensure the program is up-to-date…
- Last published:
-
What is the “reduced speed” near work areas? When will the speed limit return to normal?
The reduced speed near work areas on Taggart Street is 15 miles per hour. Be aware that air monitoring vans drive at 10 miles per hour and no passing is permitted. Please obey reduced speed signage to ensure safety of workers and work vehicles. Speed restrictions will continue until final…
- Last published:
-
What hours will truck traffic be present? About how frequent and how long are wait times expected to be?
Most truck traffic on Taggart occurs from 6 a.m. to 6 p.m. Vac trucks and support vehicles will continue to use the street through overnight hours. During traffic interruptions, wait times will likely vary from 15 to 30 minutes and may occur often throughout the day.
- Last published:
-
Are there health risks to driving through Taggart Street?
There are no anticipated health risks along Taggart Street associated with project activities. As work proceeds, to ensure worker and community safety, the Unified Command will continue to evaluate site conditions for health and safety considerations. While traffic will be able to proceed through the work areas along Taggart Street…
- Last published:
-
Can I get gas at Leake Oil on Taggart Street?
No, Leake Oil is currently closed due to site activities. They have an alternate location on N. Market Street.
- Last published:
-
Will air monitoring continue around Taggart Street?
Stationary and mobile air monitoring continues around the community and within the derailment site. As the excavation work is completed and remaining waste removed, air monitoring will be reduced.
- Last published:
-
Can I walk along Taggart Street?
Pedestrians are discouraged from walking on Taggart Street for safety reasons. Heavy equipment and truck traffic are still present, and there are no sidewalks along some stretches of the street.
- Last published:
-
Remote coordination with local authorities
The Risk Management Program regulations require owners and operators of stationary sources to coordinate their response needs annually, or more frequently if necessary, with local emergency planning and response organizations (40 CFR §68.93(a)). If a stationary source is in a remote location and in-person annual coordination is deemed impractical, can…
- Last published:
-
Emergency Response Coordination Activities Effective Date
The RMP Amendments finalized on January 13, 2017 included a requirement for owners or operators of a stationary source to engage in emergency response coordination activities (40 CFR §68.93). The regulatory text in 40 CFR §68.10(b) states that compliance with these activities must be completed by March 14, 2018. Because…
- Last published:
-
How many trucks are still expected throughout the day? What is in the trucks?
Up to 50-100 water, soil, and support vehicles per day are still anticipated as remaining contaminated soil and treated wastewater are shipped off-site. Also, as excavation concludes, trucks will enter the derailment site with clean soil (backfill).
- Last published:
-
Are street sweeping and road wetting still taking place?
Yes, street sweeping and road wetting on Taggart Street will continue on the roads surrounding the derailment site. Street sweepers and water trucks move slowly, so please exercise caution if you are behind either of these vehicles.
- Last published:
-
There is mud on my car from driving on Taggart Street. Is this contaminated?
No, all site vehicles are washed and cleaned before leaving the operational areas. Vehicles carrying contaminated soil are tightly covered and checked before entering Taggart. Street sweepers clean dust and residual dirt from the surrounding roads, so any mud would not be from contaminated areas.
- Last published:
-
Are exercises required as a part of the emergency response program requirements under 40 CFR Part 68, Subpart E?
Yes. At least once each calendar year, the owner or operator of a stationary source with any Program 2 or Program 3 process must conduct an exercise of the stationary source's emergency response notification mechanisms per 40 CFR 68.90(b)(3) or 68.95(a)(1)(i), as appropriate, before December 19, 2024, and annually thereafter…
- Last published: