Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- Definition of "Renovation" Total results: 17
- Child-Occupied Facilities Total results: 5
- Emergency Renovations Total results: 5
- In General Total results: 9
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Testing Painted Components Total results: 6
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Emergency Response Total results: 6
- Applicability/General Duty Clause Total results: 69
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- Program Levels Total results: 16
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Displaying 16 - 23 of 23 results
-
My firm was hired to scrape and repaint siding on a pre-1978 home. The siding is relatively new and was installed after 1978, but was nailed over top of the old lead-based exterior paint. Does the Lead Renovation, Repair and Painting (RRP) Rule apply?
Yes. The RRP Rule applies to a renovation in target housing unless it has been determined that the components affected by the renovation are free of paint or other surface coatings that contain lead equal to or in excess of 1.0 milligram per square centimeter (mg/cm2) or 0.5% by weight…
- Last published:
-
Remote coordination with local authorities
The Risk Management Program regulations require owners and operators of stationary sources to coordinate their response needs annually, or more frequently if necessary, with local emergency planning and response organizations (40 CFR §68.93(a)). If a stationary source is in a remote location and in-person annual coordination is deemed impractical, can…
- Last published:
-
Emergency Response Coordination Activities Effective Date
The RMP Amendments finalized on January 13, 2017 included a requirement for owners or operators of a stationary source to engage in emergency response coordination activities (40 CFR §68.93). The regulatory text in 40 CFR §68.10(b) states that compliance with these activities must be completed by March 14, 2018. Because…
- Last published:
-
Does the RRP Rule apply to removing a roof that is not painted?
The RRP Rule applies to work that disturbs painted surfaces. Where there is no paint to disturb, the RRP Rule does not apply. Question Number: 23002-15689 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Are exercises required as a part of the emergency response program requirements under 40 CFR Part 68, Subpart E?
Yes. At least once each calendar year, the owner or operator of a stationary source with any Program 2 or Program 3 process must conduct an exercise of the stationary source's emergency response notification mechanisms per 40 CFR 68.90(b)(3) or 68.95(a)(1)(i), as appropriate, before December 19, 2024, and annually thereafter…
- Last published:
-
Types of Information Relevant for Response Planning
The Risk Management Program emergency response coordination activities require the owner and operator of a stationary source to provide to the local emergency planning and response organizations: the stationary source’s emergency response plan if one exists; emergency action plan; updated emergency contact information; and any other information that local emergency…
- Last published:
-
Can you list specific activities deemed a disturbance of painted surfaces?
Answer: As a general matter, EPA believes that activities that create dust or paint chips are activities that disturb paint. There is no definitive list of activities that disturb painted surfaces. Some examples that can disturb painted surfaces include, but are not limited to: - Making cut-outs in walls. -…
- Last published:
-
What is a “whole house gut rehabilitation project” for Lead Renovation, Repair and Painting (RRP) Rule purposes? If target housing has, at some point after 1978, been gut-rehabbed, would the RRP Rule apply to subsequent renovations on the property?
The phrase “gut rehabilitation” may have different meanings across the construction industry. EPA, however, used the phrase “whole house gut rehabilitation” in a very limited sense to describe only those activities that demolish and rebuild a structure to a point where it is effectively new construction. At a minimum, these…
- Last published: