Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 18
- Radiation Total results: 1
-
Risk Management Program (RMP)
Total results: 285
- Emergency Response Total results: 6
- Applicability/General Duty Clause Total results: 69
- Five-Year Accident History Total results: 16
- Offsite Consequence Analysis (OCA) Total results: 57
- Other Risk Management Programs Total results: 35
- Plan Preparation and Submission Total results: 49
- Prevention Program Total results: 30
- Program Levels Total results: 16
- RMP*Comp Total results: 7
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 13 of 13 results
-
Determining frequency of coordination activities
The Risk Management Program regulations require owners and operators of stationary sources to coordinate their response needs annually, or more frequently if necessary, with local emergency planning and response organizations (40 CFR §68.93(a)). Are stationary sources responsible for determining if coordination activities should occur more often than annually? Ultimate responsibility…
- Last published:
-
Who Must Develop an Emergency Response Program?
The risk management program regulations require the owner or operator of a covered stationary source to develop and implement an emergency response program as described in 40 CFR §68.95, which must include an emergency response plan, emergency response equipment procedures, employee training, and procedures to ensure the program is up-to-date…
- Last published:
-
When will construction begin in the Silver-Bow Creek Corridor?
Construction in the Silver Bow Creek corridor began in 2024 with the Grove Gulch Project.
- Last published:
-
Why are gloves, which are exposed to large amounts of lead dust, not required to be disposed of under the Lead Renovation, Repair and Painting (RRP) Rule?
The RRP Rule requires the renovation firm to use precautions to ensure that all personnel, tools, and other items are free of dust and debris before leaving the work area. Workers with contaminated clothing can take that contamination home to their own children, and taking contaminated equipment to another jobsite…
- Last published:
-
Remote coordination with local authorities
The Risk Management Program regulations require owners and operators of stationary sources to coordinate their response needs annually, or more frequently if necessary, with local emergency planning and response organizations (40 CFR §68.93(a)). If a stationary source is in a remote location and in-person annual coordination is deemed impractical, can…
- Last published:
-
How will waste from the Further Remedial Elements project (Silver Bow Creek Corridor) areas be handled?
Each Further Remedial Element project area has its own specific requirements regarding waste. For example, at Northside Tailings and Diggings East, all materials within the project area that exceed the Waste Identification Criteria will be disposed of offsite in a repository. At Buffalo Gulch all materials below the basin(s) that…
- Last published:
-
Emergency Response Coordination Activities Effective Date
The RMP Amendments finalized on January 13, 2017 included a requirement for owners or operators of a stationary source to engage in emergency response coordination activities (40 CFR §68.93). The regulatory text in 40 CFR §68.10(b) states that compliance with these activities must be completed by March 14, 2018. Because…
- Last published:
-
How should lead-containing wastes from RRP renovations be handled and disposed?
While at the work site, wastes must be collected at the conclusion of each work day and at the conclusion of the renovation and stored under containment, in an enclosure, or behind a barrier that prevents release of dust and debris out of the work area and prevents access to…
- Last published:
-
Can non-certified workers transport debris off site under the RRP Rule if they have had documented on-the-job training in this activity by the certified renovator?
Answer: Yes. The RRP Rule requires the certified renovator to regularly direct the work being performed by other individuals to ensure that the work practices are being followed, including ensuring that dust or debris does not spread beyond the work site. The certified renovator is responsible for providing training to…
- Last published:
-
Under the Lead Renovation, Repair and Painting (RRP) Rule, how should I dispose of contaminated water used in two-bucket mopping?
EPA recommends contacting your local water treatment authority and asking about local requirements for handling and disposing of waste water. Question Number: 23002-20756 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
Are exercises required as a part of the emergency response program requirements under 40 CFR Part 68, Subpart E?
Yes. At least once each calendar year, the owner or operator of a stationary source with any Program 2 or Program 3 process must conduct an exercise of the stationary source's emergency response notification mechanisms per 40 CFR 68.90(b)(3) or 68.95(a)(1)(i), as appropriate, before December 19, 2024, and annually thereafter…
- Last published:
-
Types of Information Relevant for Response Planning
The Risk Management Program emergency response coordination activities require the owner and operator of a stationary source to provide to the local emergency planning and response organizations: the stationary source’s emergency response plan if one exists; emergency action plan; updated emergency contact information; and any other information that local emergency…
- Last published:
-
Under the Lead Renovation, Repair and Painting (RRP) Rule, what type of container is adequate for on-site storage of debris?
At the conclusion of each work day and at the conclusion of the renovation, waste that has been collected from renovation activities must be stored under containment, in an enclosure or behind a barrier that prevents release of dust and debris out of the work area and prevents access to…
- Last published: