Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Reporting Total results: 22
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
- Renewable Fuel Standard (RFS2) Total results: 111
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 54 results
-
Underground Storage Tanks in SPCC Plans
If a gas station that has less than 42,000 gallons completely buried oil storage capacity and no aboveground oil storage capacity installs a new aboveground tank with a capacity greater than 1,320 gallons, must the facility’s Spill Prevention, Control, and Countermeasure (SPCC) Plan address the underground storage tanks (USTs) in…
- Last published:
-
Container capacity less than 55 gallons
Do facilities need to consider containers that are less than 55 gallons for applicability under 40 CFR Part 112? No. The third column of page 47066 of the July 17, 2002 Preamble states that "You need only count containers of 55 gallons or greater in the calculation of the regulatory…
- Last published:
-
Oil-filled equipment capacity
When counting against the 1,320 aboveground storage capacity threshold, would operational storage of oil (such as in a hydraulic press) be used? Oil which is contained in equipment is required to be factored into the storage capacity for the facility even though the oil may be only used for ancillary…
- Last published:
-
If your farm does not have fuel storage that will flow into US waters by a ditch, river, stream, or lake, do you have to prepare a SPCC Plan?
No. EPA suggests you use a common sense approach. If one of your oil storage tanks leaks, and the spilled oil would not flow into navigable waters or adjoining shorelines, you do not have to prepare a Plan. Remember that you still have the responsibility to clean up any spilled…
- Last published:
-
Ground water pathways related to reasonably expected to discharge
The SPCC Rule applies to facilities that could reasonably be expected to discharge into navigable waters (40 CFR §112.2(a)). Does a facility need to consider ground water pathways when determining if a discharge of oil could reasonably be expected to reach navigable waters? Owners and operators should consider whether on-site…
- Last published:
-
What will constitute a valid electronic signature for electronic submission of reports to EPA?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . EPA will require that each party who wants to report electronically must sign an agreement that the use of electronic reporting methods will be considered equivalent to paper methods and that personal identification numbers assigned by EPA will…
- Last published:
-
What is the definition of a responsible corporate officer (RCO) who is required to certify some of the submissions involved?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Under § 80.75(n), reports to EPA must be signed and certified as correct by the owner or a responsible corporate officer of the refiner, importer, or oxygenate blender. "Owner" means the person who is the principal owner of…
- Last published:
-
Could we become the delegated authority for submission of reports on behalf of our members?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Individual blenders could rely on your association to submit reports to EPA on their behalf. . However you should understand that if any reports are not submitted or are submitted improperly then responsibility would fall upon the individual…
- Last published:
-
By our reading of the regulations, the only reporting required of the oxygenate blender who elects to comply with the oxygen standard on a per gallon basis is a yearly report due the last day of February of each year (beginning in 1996) that states the to
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Your interpretation is correct.(10/31/94) This question and answer was originally posted at Consolidated List of Reformulated Gasoline and Anti-Dumping Questions and Answers: July 1, 1994 through November 10, 1997 (PDF) (333 pp, 18.17 MB, EPA420-R-03-009, July 2003, About…
- Last published:
-
SPCC responsibility for tanks on leased property
What if I leased some parcels, and there are tanks already present? Am I responsible for these tanks? You could be. If you plan to use these tanks, make sure in your lease agreement, it states who is responsible for these tanks. If the lease does not state who is…
- Last published:
-
Will applicants be evaluated on whether or not they leverage funds?
Cost share and leveraging of non-federal funds is not a requirement of this Funding Opportunity, but if leveraging is proposed, applicants will be evaluated based on how they will obtain the leveraged resources, the likelihood the leveraging will materialize during grant performance (e.g., if they have letters of commitment), the…
- Last published:
-
Question 14, Section VI.C., of the July 1, 1994 Question and Answer Document provides an example of the creation and addition of two different batches to form a composite mixture. All or a portion of this composite is shipped as RFG. How will the refinery
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Question 14 relates to in-line blending operations that have petitioned EPA for and received an exemption from the independent sampling and testing requirements of the RFG regulations. In such petitions, refiners often define a "batch" of in-line blended…
- Last published:
-
The batch report requires reporting the volume percent for six oxygenates -methanol, MTBE, ethanol, ETBE, TAME and t-butanol. If a refiner or oxygenate blender uses MTBE or ethanol as an oxygenate, and does not include in its calculation of oxygen weight
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Trace amounts of oxygenates that may be present in MTBE or ethanol do not have to be reported. However, where a refiner reports total oxygen weight percent that includes MTBE or ethanol plus other oxygenates in larger than…
- Last published:
-
Is it possible to distribute the majority of project funding in Year 2 and 3?
Yes. Applicants should commit to being able to issue its first Project RFA within one year of being selected as Principal Recipient (page 9 of the RFA), however this is not a threshold eligibility requirement. There are no specific requirements as to the timing of issuing Project RFAs and funding…
- Last published:
-
Will there be a non-federal cost share or match required of grants made by the principal recipient?
No, non-federal cost share is not required. If an applicant proposes voluntary cost share, they should carefully review section III.B on page 21, description of Supporting Materials in section IV.D on page 27, and section V.B.
- Last published: