Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Pre-Renovation Education Total results: 26
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.2 Definitions Total results: 12
- 112.1 Applicability Total results: 18
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 18
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 53 results
-
How do I Create Scripts to run MOVES3 from the Command Line?
See More Frequent Questions about MOVES and Related Models . While the easiest way to interact with MOVES3 is via its graphical user interface (GUI), it is sometimes useful to process MOVES RunSpecs in batches via the Windows command line. To this end, MOVES3 has a set of commands that…
- Last published:
-
What is a farm for purposes of the SPCC Rule?
In the December 2006 amendments to the SPCC Rule, EPA defined a farm as "a facility on a tract of land devoted to the production of crops or raising of animals, including fish, which produced and sold, or normally would have produced and sold, 1,000 or more of agricultural products…
- Last published:
-
Examples of an agent of a Professional Engineer
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) or an agent of the PE must visit and examine the facility before the PE certifies an SPCC Plan (40 CFR §112.3(d)). What are some examples of an agent of a PE? An agent of a…
- Last published:
-
What is considered bulk oil storage capacity?
The revised rule recognizes that oil is sometimes stored in bulk and sometimes used operationally. A bulk storage container is any container storing oil at a facility. Bulk oil storage containers may include, but are not limited to tanks, containers, drums, and mobile or portable totes. Operational use includes oil-filled…
- Last published:
-
Mobile fuel tanker as a facility
Is a non-transportation related mobile fuel tanker with more than 55 gallons located near a 55 gallon drum storage area considered a facility? Perhaps. "Facility" is defined in Part 112 to mean "any mobile or fixed, onshore or offshore building, structure, installation, equipment, pipe, or pipeline (other than a vessel…
- Last published:
-
Is There Any Documentation Available for Installing MOVES on Linux?
See More Frequent Questions about MOVES and Related Models . MOVES is designed for the Windows operating system and the EPA MOVES Team only tests and supports MOVES in Windows environments. However, users have reported successfully installing and running MOVES in Linux. The instructions for Running MOVES from the Windows…
- Last published:
-
May I use the pamphlet “Protect Your Family From Lead in Your Home” to meet my obligations for pre-renovation education under the RRP Rule?
Answer: No. As of December 22, 2008, only the pamphlet “ Renovate Right ” may be used to comply with the pre-renovation education requirements of the RRP Rule. “ Protect Your Family ” is still available for use during real-estate sales and lease transactions and for general information. Question Number…
- Last published:
-
My firm is replacing windows in a condominium. Is this type of exterior work considered work in a common area, and if so, must other owners and occupants be informed about the job?
Exterior renovations of multi-unit target housing are considered renovations of a common area. A common area is a portion of a building that is generally accessible to all residents or users of the building. Renovations in common areas of multi-unit target housing, such as condominiums, must be performed in accordance…
- Last published:
-
Under the Pre-Renovation Education Rule, I have the option of using a certificate of mailing to notify the owner or occupant. What is the difference between a certificate of mailing and certified mail?
A certificate of mailing is a receipt showing evidence of mailing, while certified mail provides proof of mailing and delivery of mail. When using the certificate of mailing option, no record is kept at the mailing office and a receipt is not obtained when mail is delivered to the addressee…
- Last published:
-
When multiple contractors are involved in a single renovation, must every contractor provide pre-renovation education? Can a certified firm assign its responsibility to a property management company?
All firms performing, offering or claiming to perform renovations are responsible for ensuring compliance with the pre-renovation education requirements of the RRP Rule. However, it is unnecessary for the same notifications and information to be given out repeatedly during a single renovation. Accordingly, a firm may discharge the task by…
- Last published:
-
Can I Install MOVES on a Server so More than One User Can Access It?
See More Frequent Questions about MOVES and Related Models . No, MOVES is not a multi-user product. MOVES is primarily intended for use on a Windows10 64-bit personal computer. In addition, we have run MOVES2014a, MOVES2014b and MOVES3 on Windows Server 2012 R2 very successfully for years as a single…
- Last published:
-
What is a field-constructed container?
What are the types of containers or equipment containing oil reservoirs that would be considered field-constructed containers and thus subject to the brittle fracture evaluation of 40 CFR §112.7(i)? As found in the Preamble language provided on page 47112 of the July 17, 2002 SPCC final rule, EPA provides a…
- Last published:
-
What is oil-filled operational equipment?
Oil-filled operational equipment is equipment that includes an oil storage container (or multiple containers and associated piping intrinsic to the operation of the equipment) in which the oil is present solely to support the function of the apparatus or the device. It is not considered a bulk storage container, and…
- Last published:
-
How do I automate MOVES installation (for example, with Microsoft Endpoint Manager)?
The MOVES installer typically requires user interaction to make various selections. However, if the default installation options are acceptable for your needs, the installer can be run without user interaction on the command line using the /VERYSILENT flag. If this is a first time installation you will need to create…
- Last published:
-
I am planning on sending the pamphlet via certificate of mailing to a tenant who occupies a unit scheduled to be renovated. Does the tenant’s name need to be addressed on the mailing, or is it acceptable to address the envelope to Attn: Tenant/Occupant?
Answer: The tenant’s name and address must be indicated on the mailing. The RRP Rule requires a renovator to provide the “Renovate Right” pamphlet to an adult in each unit. Therefore, the name and address of an adult occupant in each unit must be indicated on the mailing. The renovator…
- Last published: