Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Generation of RINs Total results: 6
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Grandfathering Total results: 8
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 49
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.2 Definitions Total results: 12
- 112.1 Applicability Total results: 18
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 13
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 29 results
-
What is a farm for purposes of the SPCC Rule?
In the December 2006 amendments to the SPCC Rule, EPA defined a farm as "a facility on a tract of land devoted to the production of crops or raising of animals, including fish, which produced and sold, or normally would have produced and sold, 1,000 or more of agricultural products…
- Last published:
-
Examples of an agent of a Professional Engineer
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) or an agent of the PE must visit and examine the facility before the PE certifies an SPCC Plan (40 CFR §112.3(d)). What are some examples of an agent of a PE? An agent of a…
- Last published:
-
What is considered bulk oil storage capacity?
The revised rule recognizes that oil is sometimes stored in bulk and sometimes used operationally. A bulk storage container is any container storing oil at a facility. Bulk oil storage containers may include, but are not limited to tanks, containers, drums, and mobile or portable totes. Operational use includes oil-filled…
- Last published:
-
Can a gallon of ethanol generate more than 1.0 RIN in RFS2?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The number of RINs that can be generated for each gallon of renewable fuel are determined by the Equivalence Values. See 80.1415 and 80.1426(f)(2)-(6). Equivalence Values are based on energy content in the renewable fuel in comparison to…
- Last published:
-
If I produce biodiesel using waste vegetable oil, can I generate more RINs per gallon than if I use virgin soy oil? Would the use of solar panels as a heat source for our process help with our RIN number per gallon?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The number of RINs that can be generated for each gallon of renewable fuel is determined by the Equivalence Values. See regulations at 80.1415(b) and 8.1426(f)(2)(i), for example. Equivalence Values are based on energy content in the renewable…
- Last published:
-
Will applicants be evaluated on whether or not they leverage funds?
Cost share and leveraging of non-federal funds is not a requirement of this Funding Opportunity, but if leveraging is proposed, applicants will be evaluated based on how they will obtain the leveraged resources, the likelihood the leveraging will materialize during grant performance (e.g., if they have letters of commitment), the…
- Last published:
-
Is it possible to distribute the majority of project funding in Year 2 and 3?
Yes. Applicants should commit to being able to issue its first Project RFA within one year of being selected as Principal Recipient (page 9 of the RFA), however this is not a threshold eligibility requirement. There are no specific requirements as to the timing of issuing Project RFAs and funding…
- Last published:
-
Will there be a non-federal cost share or match required of grants made by the principal recipient?
No, non-federal cost share is not required. If an applicant proposes voluntary cost share, they should carefully review section III.B on page 21, description of Supporting Materials in section IV.D on page 27, and section V.B.
- Last published:
-
Mobile fuel tanker as a facility
Is a non-transportation related mobile fuel tanker with more than 55 gallons located near a 55 gallon drum storage area considered a facility? Perhaps. "Facility" is defined in Part 112 to mean "any mobile or fixed, onshore or offshore building, structure, installation, equipment, pipe, or pipeline (other than a vessel…
- Last published:
-
How will the budget for year six be treated in case of a continuation of sampling past 2029?
Sampling past 2029 will not be covered under this assistance agreement.
- Last published:
-
What is a field-constructed container?
What are the types of containers or equipment containing oil reservoirs that would be considered field-constructed containers and thus subject to the brittle fracture evaluation of 40 CFR §112.7(i)? As found in the Preamble language provided on page 47112 of the July 17, 2002 SPCC final rule, EPA provides a…
- Last published:
-
What is oil-filled operational equipment?
Oil-filled operational equipment is equipment that includes an oil storage container (or multiple containers and associated piping intrinsic to the operation of the equipment) in which the oil is present solely to support the function of the apparatus or the device. It is not considered a bulk storage container, and…
- Last published:
-
What is the operational tolerance for denaturant in ethanol to meet the definition of Renewable Fuel? The RFS2 definition calls for a maximum of 2% denaturant. What if the lab results come back higher or lower than 2%? For example, what if the lab results
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The definition of renewable fuel in 80.1401 specifies that the maximum amount of denaturant in ethanol that can be treated as renewable fuel is 2 volume percent. If lab results indicate that the concentration of denaturant is higher…
- Last published:
-
Can the application also include program admin support for various coalition partners outside of the principal recipient?
Yes. Coalitions are allowable. Applicants should reflect related admin-related costs in the budget narrative. Please see Question 2 under this section for additional information.
- Last published:
-
What is a mobile refueler?
A mobile refueler is a bulk storage container onboard a vehicle or being towed that is designed or used solely to store and transport fuel for transfer into or from an aircraft, motor vehicle, locomotive, vessel, ground service equipment, or other oil storage container. Mobile refuelers may be found at…
- Last published: