Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Environmental Sampling and Monitoring Total results: 7
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Environmental Sampling and Monitoring
- 112.3 Requirement to Prepare an SPCC Plan
- 112.6 Qualified Facilities
Displaying 1 - 14 of 14 results
-
Criteria for oil production facilities to be qualified facilities
Qualified facilities are eligible for streamlined regulatory requirements in 40 CFR §112.6, which include self-certification of SPCC Plans. What criteria do oil production facilities have to meet in order to be considered qualified facilities? Oil production facilities, like all other facilities, must meet the criteria in §112.3(g)(1) or (2) to…
- Last published:
-
What’s the difference between air sampling and air monitoring?
Air monitoring and air sampling are two different methods of looking at air quality. Air monitoring uses electronic devices to provide real-time readings of contaminants in the air. Air sampling involves trapping air over a period of time in a container that is then sent to a laboratory for analysis…
- Last published:
-
What is EPA’s role in sampling?
EPA is part of the Unified Command consisting of different agencies to review, approve and direct Norfolk Southern’s workplans and site activities. Surface water sampling is performed by Norfolk Southern contractors, with EPA and Ohio EPA oversight. Soil sampling is performed both by Norfolk Southern contractors and EPA contractors. Air…
- Last published:
-
What is the plume map and what does it tell us?
The plume map is an “event reconstruction” based on known weather and on-site observations during a 10-hour time period after the vent-and-burn operation that occurred on Monday, February 6. It tells us where soot likely fell to the ground and where the highest concentrations of particles may be. This information…
- Last published:
-
Visit and examination requirements for SPCC self-certification
Pursuant to 40 CFR §112.6, the owner or operator of a facility that meets the criteria in §112.3(g) for either a Tier I or Tier II qualified facility may self-certify the facility's SPCC Plan. As part of the self-certification, the owner or operator must certify that he or she has…
- Last published:
-
What is split sampling?
Split sampling is a technique where multiple samples are collected from the same location at the same time and then sent to separate laboratories for analysis. Checking to see if the labs get the same or similar results is a way to determine the accuracy of the data. If there…
- Last published:
-
What work happens after contamination under and between the train tracks is removed?
After track work is complete, additional cleanup and assessments will continue. This includes shipping solid and liquid wastes off-site, excavating in areas where rail cars were staged and scrapped, and sampling and monitoring groundwater, soil, surface water, and sediment.
- Last published:
-
Availability of electronic SPCC Plan template
Part 112, Appendix G to prepare an SPCC Plan. Is the Tier I qualified facility SPCC Plan template available in an electronic version? EPA has made available electronic versions of the Tier I qualified facility Plan template to help the owner or operator of a Tier I qualified facility develop…
- Last published:
-
Columbiana County Health District has sampled my private well, will it be sampled again?
Residents will be contacted if they are within the priority zones and have signed up for private well sampling. Within 60 days after the first sample, private wells are resampled, and residents will be contacted to schedule resampling. Residents within one of the four priority zones can also schedule a…
- Last published:
-
SPCC compliance dates for farms
What are the Spill Prevention, Control, and Countermeasure (SPCC) compliance dates for farms? On November 22, 2011, EPA amended the date by which certain farms must prepare, or amend, and implement their SPCC Plans to May 10, 2013 to comply with SPCC rule amendments promulgated since July 2002 ( 76…
- Last published:
-
PE certification and applying PE's seal
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) must certify a facility’s SPCC Plan. In order to certify an SPCC plan, must a PE apply his seal to the plan, or is the PE’s signature on a certification statement sufficient for SPCC purposes? For…
- Last published:
-
What is the East Palestine Potable Water Sampling Work Plan?
In February, EPA required Norfolk Southern to investigate drinking water sources through a work plan approved by responding agencies. The work plan is being used to monitor drinking water near the derailment site, and recently changed to include more areas for water sampling. These new areas were chosen based on…
- Last published:
-
Tier I qualified facility template use under Part 112
In the 2008 Amendments to the SPCC Rule, EPA provided a template for the owner or operator of a Tier I qualified facility to create an SPCC Plan. Does EPA require a Tier I qualified facility to use the template in 40 CFR Part 112, Appendix G? Does EPA allow…
- Last published:
-
Difference between an SPCC Tier I and Tier II qualified facility
In the SPCC regulations in 40 CFR Part 112, what is the difference between a Tier I and Tier II qualified facility? How did EPA establish the multi-tiered approach for qualified facilities? A Tier II qualified facility is one that has an aggregate aboveground oil storage capacity of 10,000 U.S…
- Last published: