Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Tier2 Submit and CAMEO
- 40 CFR Part 112.20 Facility Response Plans
- 112.3 Requirement to Prepare an SPCC Plan
Displaying 1 - 15 of 30 results
-
Criteria for oil production facilities to be qualified facilities
Qualified facilities are eligible for streamlined regulatory requirements in 40 CFR §112.6, which include self-certification of SPCC Plans. What criteria do oil production facilities have to meet in order to be considered qualified facilities? Oil production facilities, like all other facilities, must meet the criteria in §112.3(g)(1) or (2) to…
- Last published:
-
How often does a facility need to complete an oil spill response training under the FRP requirements?
Facilities subject to the Facility Response Plan (FRP) regulations in 40 CFR Part 112, Subpart D are required to develop a facility response training program to train those personnel involved in oil spill response activities (§112.21(b)). How often does a facility need to complete an oil spill response training under…
- Last published:
-
What is a significant and substantial harm facility?
Some substantial harm facilities may meet the criteria for a significant and substantial harm facility. After you have prepared and submitted your FRP, the RA may determine that your facility has the potential, not just for substantial harm, but for significant and substantial harm. If the RA makes that determination…
- Last published:
-
Tier2 Submit software and confidential chemical location information
When using EPA’s Tier2 Submit software to comply with the annual Hazardous Chemical Inventory reporting requirement under the Emergency Planning and Community Right-to-Know Act (EPCRA) §312, how can a person withhold confidential chemical location information from disclosure to the public? In order to fulfill the proper reporting under EPCRA, a…
- Last published:
-
Do states require extra Tier II information?
Do states require additional information on the Tier II report? How can I find out about the state data requirements? Some states do want additional Tier II information; contact your state Tier II administrator to learn specific details. Tier2 Submit includes fields for the additional information requested or required by…
- Last published:
-
No Street Address Availability Tier II Reporting
Pursuant to 40 CFR 370.42(d) , Tier II chemical inventory information must include the complete name and address of the location of the facility (including the full street address or state road, city, county, State and zip code), latitude and longitude. If a facility does not have a street address…
- Last published:
-
PE certification for an FRP if an SPCC impracticability determination is made
If the owner or operator of a facility subject to the SPCC regulations determines that the installation of any of the specified secondary containment structures or equipment is not practicable and accordingly provides in the facility’s SPCC Plan an oil spill contingency plan following the provisions of 40 CFR Part…
- Last published:
-
Elements to include in Facility Response Plan
What key elements should I include in my Facility Response Plan? As you prepare your FRP, be sure that your plan includes the following elements: Emergency Response Action Plan (an easily accessible stand-alone section of the overall plan) including the identity of a qualified individual with the authority to implement…
- Last published:
-
What are the FRP recordkeeping requirements?
What FRP recordkeeping requirements must I satisfy? You must maintain the response plan at your facility, along with plan updates reflecting material changes. You must also keep a log of response training drills and exercises. Records of inspections of response equipment must be kept for five years. If you determine…
- Last published:
-
Under FRP, what is the definition of a qualified individual?
The FRP regulations require facilities to prepare an emergency response action plan and identify a qualified individual that has full authority, including contracting authority, to implement removal actions (40 CFR §112.20(h)(i)). What is the definition of a qualified individual? The relevant statute, CWA 311(j)(5)(C)(ii) requires that the plan identify the…
- Last published:
-
SPCC compliance dates for farms
What are the Spill Prevention, Control, and Countermeasure (SPCC) compliance dates for farms? On November 22, 2011, EPA amended the date by which certain farms must prepare, or amend, and implement their SPCC Plans to May 10, 2013 to comply with SPCC rule amendments promulgated since July 2002 ( 76…
- Last published:
-
FRP Site Plans with Varying Storage Contents
The Facility Response Plan regulations require subject facilities to prepare and maintain a site plan diagram that includes, among other things, the contents of bulk oil storage tanks, drum oil storage areas, and surface impoundments ( 40 CFR Part 112 Appendix F ). When the contents of these storage units…
- Last published:
-
SPCC Qualified Facilities Substantial Harm Criteria Certification
Are SPCC qualified facilities required to complete and maintain a copy of the Certification of the Applicability of the Substantial Harm Criteria form located in Appendix C of 40 CFR Part 112? Yes, all SPCC regulated facilities, including qualified facilities, that do not meet the criteria of a substantial harm…
- Last published:
-
Entering Alternative Storage Types and Pressure and Temperature Conditions on Tier II Form
EPA provides a list of storage types and conditions for pressure and temperature in the instructions for the paper Tier II form and as dropdown menus in Tier2 Submit. Are facilities required to use the storage types and conditions that EPA provides, or can facilities provide different values? Facilities are…
- Last published:
-
Attaching Site Plan Using Tier2 Submit
Tier2 Submit does allow a user to attach and submit a site plan with the Tier II inventory information. However, before using Tier2 Submit to submit a site plan, the facility should check with the relevant State or Tribal Emergency Response Commission ( SERC or TERC ) and/or their state…
- Last published: