Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- After Cleaning Total results: 3
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- Miscellaneous SPCC Total results: 8
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 14 of 14 results
-
Criteria for oil production facilities to be qualified facilities
Qualified facilities are eligible for streamlined regulatory requirements in 40 CFR §112.6, which include self-certification of SPCC Plans. What criteria do oil production facilities have to meet in order to be considered qualified facilities? Oil production facilities, like all other facilities, must meet the criteria in §112.3(g)(1) or (2) to…
- Last published:
-
Can I use clothes, towels, and bedding that I left behind in my structure?
Yes. However, it is recommended the occupant launder clothes, towels and bedding as normal.
- Last published:
-
What changes did EPA finalize to the SPCC Rule in December 2006?
The revised rule modifies requirements for facilities with smaller oil storage capacity and specific types of oil-filled operating equipment. If a facility has 10,000 gallons or less in aggregate aboveground oil storage capacity and the facility meets the oil discharge history criteria, then an owner/operator of a facility may prepare…
- Last published:
-
SPCC compliance dates for farms
What are the Spill Prevention, Control, and Countermeasure (SPCC) compliance dates for farms? On November 22, 2011, EPA amended the date by which certain farms must prepare, or amend, and implement their SPCC Plans to May 10, 2013 to comply with SPCC rule amendments promulgated since July 2002 ( 76…
- Last published:
-
SPCC change in ownership
If there is a change in ownership at a facility, can the facility operate under the same SPCC Plan without the certification from a professional engineer (PE)? If no change in procedures has been made, it may still be feasible to operate under the existing SPCC Plan. The information in…
- Last published:
-
Will samples be collected after cleaning is completed?
Indoor air or surface samples will not be collected as part of this cleaning program. Indoor sampling is not recommended since exposure pathways for volatile organic chemicals (VOCs) have been effectively managed though site engineering controls and an extensive network of air monitoring and sampling equipment. Any VOCs that may…
- Last published:
-
Liability of oil retailers at SPCC regulated farm
If a farm is out of compliance of Spill Prevention, Control, and Countermeasure (SPCC) regulations and is checked by EPA and/or has a spill, is the retailer that filled the tank liable? No, EPA considers the oil tank owner responsible for lack of compliance.
- Last published:
-
PE certification and applying PE's seal
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) must certify a facility’s SPCC Plan. In order to certify an SPCC plan, must a PE apply his seal to the plan, or is the PE’s signature on a certification statement sufficient for SPCC purposes? For…
- Last published:
-
PE certifying a technical amendment
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) must certify all technical amendments to an existing SPCC Plan (§112.5(c)). When certifying a technical change to an existing SPCC Plan, does the PE have to inspect and certify the entire Plan or only the amended…
- Last published:
-
How will I know when I can return?
EPA representatives will keep you informed about the progress of the cleaning. The cleaning team will provide an estimate of cleaning time when they arrive. You will be notified when cleaning is wrapping up so that you can return. Representatives of the cleaning team will not leave until you return…
- Last published:
-
Is a PE required to review an SPCC Plan if it has not changed?
Under the 2002 regulations, is a PE required to review the SPCC Plans at the end of a 5-year SPCC Plan cycle if no changes have occurred at the facilities? No. It is the responsibility of the owner or operator to document the completion of a review and decide whether…
- Last published:
-
PE certifying an SPCC plan in a different state
Except as provided in 40 CFR §112.6 for qualified facilities, a licensed Professional Engineer (PE) must review and certify an SPCC Plan for it to be effective to satisfy the requirements of Part 112 (§112.3(d)). When reviewing and certifying a facility’s SPCC Plan, must the PE be licensed in the…
- Last published:
-
How did EPA amend the requirements for animal fats and vegetable oils in 2006?
In December 2006, EPA removed the following SPCC requirements for the following specific types of animal fat and vegetable oil facilities: Requirements for onshore oil production facilities (Section 112.13) Requirements for onshore oil drilling and workover facilities (Section 112.14) Requirements for offshore oil drilling, production, or workover facilities (Section 112.15)…
- Last published:
-
Rainwater in containment system of SPCC regulated farm
What do I do with rainwater that accumulates in my containment system for a farm regulated by the Spill Prevention, Control, and Countermeasure (SPCC) rule? Check the rainwater for any oil, and if no oil is present, this can be released. If there is oil in the water, this water…
- Last published: