Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Registration Total results: 9
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
- Renewable Fuel Standard (RFS2) Total results: 111
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Training Provider Accreditation Total results: 7
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 19 results
-
Criteria for oil production facilities to be qualified facilities
Qualified facilities are eligible for streamlined regulatory requirements in 40 CFR §112.6, which include self-certification of SPCC Plans. What criteria do oil production facilities have to meet in order to be considered qualified facilities? Oil production facilities, like all other facilities, must meet the criteria in §112.3(g)(1) or (2) to…
- Last published:
-
In a situation where an importer leases tankage from another company, e.g., from a for-hire terminal, who must register such import facility, the company that owns the terminal, the importer that leases the tankage, or both?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Under § 80.2(r), an importer is defined as "a person who imports gasoline or gasoline blending stocks or components from a foreign country into the United States...." Accordingly, it is the importer of the gasoline, and not the…
- Last published:
-
If my fuel is already registered with the Fuels and Fuel Additives program under 40 CFR Part 79, do I still need to register with the RFS2 program under 40 CFR Part 80?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. Even if your fuel or fuel additive is already registered under 40 CFR Part 79, there are additional registration requirements for parties regulated under the RFS2 program, as specified in 40 CFR 80.1450.
- Last published:
-
Once I register my fuel for the RFS2 program under §80.1450, do I still need to register my fuel under 40 CFR Part 79?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. Renewable fuels intended for use or used in motor vehicles are required to be registered under 40 CFR part 79 prior to any introduction into commerce. Manufacturers of renewable fuels and fuel additives not registered under part…
- Last published:
-
Is it permissible for a training provider to employ more than one training manager?
Answer : Yes. The Rule requires that a training provider employ a training manager that meets the qualifications in 40 CFR 745.225(c)(1). EPA does not interpret this to be a limitation on the permissible number of training managers. Therefore, a training provider may employ more than one training manager so…
- Last published:
-
SPCC compliance dates for farms
What are the Spill Prevention, Control, and Countermeasure (SPCC) compliance dates for farms? On November 22, 2011, EPA amended the date by which certain farms must prepare, or amend, and implement their SPCC Plans to May 10, 2013 to comply with SPCC rule amendments promulgated since July 2002 ( 76…
- Last published:
-
Does EPA consider it a conflict of interest for a third-party company to assist a group of renewable fuel producers and importers of renewable fuel to help meet the requirements of the re-registration and engineering review pursuant to section 80.1450?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . EPA does not restrict a renewable fuel producer or an importer of renewable fuel from seeking a third-party company to assist them in meeting the re-registration and engineering review requirements pursuant to section 80.1450. The renewable fuel producer…
- Last published:
-
Will common carriers be required to register their transport trucks as oxygenate blending facilities?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Normally, only the owner of the gasoline produced at an oxygenate blending operation must register as an oxygenate blender. If a common carrier blends gas in trucks that it owns it must meet all of the requirements for…
- Last published:
-
Is the licensed professional engineer conducting the engineering review required to perform the site visit in person, or can they delegate the site visit to another person who maybe assisting them in the engineering review?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Pursuant to §80.1450(b)(2), all verifications must be performed by the licensed professional engineer conducting the engineering review. This requirement includes conducting the site visits. The licensed professional engineer conducting the engineering review must perform the site visits to…
- Last published:
-
If a renovator takes the refresher course early, would the new certification be valid for five years from the date of training, or five years from the date that the previous certification expires?
Question : I’m a training provider and have been accredited for the renovator refresher course. If a renovator takes the refresher course early (i.e., before their previous certification has expired), would the new certification be valid for five years from the date of training, or five years from the date…
- Last published:
-
I'm an accredited training provider. Can the final course assessment to be administered in an "open book" format?
No. The training provider is responsible for maintaining the validity and integrity of the course test to ensure that it accurately evaluates the trainee’s knowledge and retention of the course topics. A course test administered in an open book format does not evaluate whether a student has sufficiently learned and…
- Last published:
-
PE certification and applying PE's seal
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) must certify a facility’s SPCC Plan. In order to certify an SPCC plan, must a PE apply his seal to the plan, or is the PE’s signature on a certification statement sufficient for SPCC purposes? For…
- Last published:
-
If an importer registers in a PADD, may the importer use a starting point other than zero, within the range of valid batch numbers, for generating the sequential batch numbers at each of its import facilities?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. As long as no batches are assigned duplicate numbers this would be acceptable.(7/1/94) This question and answer was posted at Consolidated List of Reformulated Gasoline and Anti-Dumping Questions and Answers: July 1, 1994 through November 10, 1997…
- Last published:
-
If an importer is unsure of what terminals might be involved in importing gasoline (RFG or conventional), may importers register more terminals than might be used?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. However, an importer does not need to register each import facility it uses (see previous question).(7/1/94) This question and answer was posted at Consolidated List of Reformulated Gasoline and Anti-Dumping Questions and Answers: July 1, 1994 through…
- Last published:
-
Do all renovation course instructors need to be approved as principal instructors? For example, to reach a 6:1 student-to-instructor ratio with 18 people in the class, may we have one principal instructor who teaches the entire lecture and is assisted by two additional hands-on instructors (who are not approved as principal instructors)?
Answer: Every accredited training program must employ a qualified training manager, and it is the job of the training manager to designate a qualified principal instructor for each course. The principal instructor is responsible for the organization of the course and oversees the teaching of all course material. The training…
- Last published: