Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Prior to Cleaning Total results: 3
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Assignment of pathways to renewable fuel Total results: 4
- Application of standards Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Grandfathering Total results: 8
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Prior to Cleaning
- Assignment of pathways to renewable fuel
- 112.3 Requirement to Prepare an SPCC Plan
Displaying 1 - 10 of 10 results
-
Criteria for oil production facilities to be qualified facilities
Qualified facilities are eligible for streamlined regulatory requirements in 40 CFR §112.6, which include self-certification of SPCC Plans. What criteria do oil production facilities have to meet in order to be considered qualified facilities? Oil production facilities, like all other facilities, must meet the criteria in §112.3(g)(1) or (2) to…
- Last published:
-
Was Jatropha analyzed for this final rule and, if so, what D-code applies?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The GHG emissions performance of a Jatropha-based pathway was not analyzed for the final rule because sufficient information was not available. Since EPA has not yet assigned a D code for this pathway, a producer cannot generate RINs…
- Last published:
-
Under what conditions might a renewable fuel produced under an approved pathway in the RFS regulations qualify for use in Navy applications?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Background: The U.S. Navy is seeking to blend biofuels with fossil-based fuels, such as F-76 fuel, which are often used in Navy marine vessels. The Navy asked EPA for guidance on whether such biofuels would be treated as…
- Last published:
-
Was Jatropha analyzed for this final rule and, if so, what D-code applies?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The GHG emissions performance of a Jatropha-based pathway was not analyzed for the final rule because sufficient information was not available. Since EPA has not yet assigned a D code for this pathway, a producer cannot generate RINs…
- Last published:
-
SPCC compliance dates for farms
What are the Spill Prevention, Control, and Countermeasure (SPCC) compliance dates for farms? On November 22, 2011, EPA amended the date by which certain farms must prepare, or amend, and implement their SPCC Plans to May 10, 2013 to comply with SPCC rule amendments promulgated since July 2002 ( 76…
- Last published:
-
What do I have to do in preparation for the cleaning?
Cleaning crews will not move any of your personal belongings, including furniture or appliances. To ensure the most thorough cleaning of your home or place of business, please clear countertops and other surfaces, and limit excess clutter. Norfolk Southern will provide a few boxes if needed to allow for easy…
- Last published:
-
PE certification and applying PE's seal
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) must certify a facility’s SPCC Plan. In order to certify an SPCC plan, must a PE apply his seal to the plan, or is the PE’s signature on a certification statement sufficient for SPCC purposes? For…
- Last published:
-
Will someone explain the process to me so that I can decide if I want cleaning?
During your pre-cleaning interview, representatives from EPA and Norfolk Southern will explain the cleaning process, assess time and resource needs, answer questions, and if desired schedule a cleaning date.
- Last published:
-
How will a cleaning date be scheduled?
A scheduling specialist will contact you to find a date and time for a pre-cleaning interview at your home or place of business.
- Last published:
-
Do you have any updates on the status of EPA’s modeling of palm oil biodiesel?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . EPA is actively continuing its FRM evaluation of biodiesel produced from palm oil. We expect to complete that analysis within approximately 6 months, as stated in the preamble to the final rule. All currently available documents including meeting…
- Last published: