Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Grandfathering Total results: 8
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 18 results
-
Criteria for oil production facilities to be qualified facilities
Qualified facilities are eligible for streamlined regulatory requirements in 40 CFR §112.6, which include self-certification of SPCC Plans. What criteria do oil production facilities have to meet in order to be considered qualified facilities? Oil production facilities, like all other facilities, must meet the criteria in §112.3(g)(1) or (2) to…
- Last published:
-
How will the volume of corn ethanol produced above the grandfathering threshold be treated?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . For grandfathered facilities, only the baseline volumes are exempt from the 20 percent GHG reduction requirement Thus, RINs may be generated for baseline volumes of fuel regardless of lifecycle greenhouse gas emissions performance. Volumes of fuel produced above…
- Last published:
-
Do grandfathered facilities have an additional 6 months to submit their engineering reviews to EPA?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. In the preamble to the final RFS2 regulations at 75 Fed. Regs. 14709 (March 26, 2010), EPA stated that, in an effort to reduce demand on engineering resources in the interim between promulgation of the rule and…
- Last published:
-
What is meant by "grandfathered" fuel?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Under the RFS2 regulations, renewable fuel produced from facilities that commenced construction before December 19, 2007 and which completed construction within 36 months without an 18 month hiatus in construction and thereby exempt from the minimum 20% GHG…
- Last published:
-
How long will the grandfathering provision be effective? Once a grandfathered producer registers and completes their engineering review, will their baseline volume ever need to meet the 20% GHG reduction requirement?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . If a facility meets the requirements for exemption from the 20% GHG reduction requirement pursuant to 40 CFR 80.1403(c ) or (d), then the baseline volume of renewable fuel produced by that facility is exempt from the 20%…
- Last published:
-
Will boiling my water help?
No. Boiling water will NOT reduce nitrate levels. In fact, it will make the level of nitrate worse because some of the water will evaporate but the nitrate will not. This increases the concentration of nitrate in water.
- Last published:
-
How does a foreign grandfathered renewable fuel production facility processing a mixture of feedstocks with different D codes or no D codes classify its production into D code categories so RINs can be generated when the product is imported into the U.S.?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . If the importer is generating the RINs, the importer must obtain all the required information for registration from the foreign producer of the renewable fuel pursuant to 80.1426(a)(2) and 80.1450. In the case of a foreign producer using…
- Last published:
-
Is it safe to shower or bathe in water if it is over the nitrate MCL of 10 mg/L?
Nitrate is only a concern for ingestion (eating and drinking). It is not absorbed through your skin. People who install filter systems for nitrate often install them just for their kitchen sink faucet, and they use that faucet for their cooking and drinking water.
- Last published:
-
What should I do if my water has elevated nitrates and/or exceeds the MCL?
If nitrate exceeds the MCL of 10 mg/L, you should find a safe alternative drinking water supply. The quickest thing to do is to begin using bottled water for drinking. Another option is to install a treatment that will remove nitrate from your water such as reverse osmosis or a…
- Last published:
-
Why is nitrate contamination a concern?
Nitrate is an acute contaminant, meaning that health effects can occur immediately (I.e. within hours or days) of short-term exposure. Too much nitrate in your body makes it harder for red blood cells to carry oxygen. While most people recover quickly, this can be very dangerous for infants and some…
- Last published:
-
SPCC compliance dates for farms
What are the Spill Prevention, Control, and Countermeasure (SPCC) compliance dates for farms? On November 22, 2011, EPA amended the date by which certain farms must prepare, or amend, and implement their SPCC Plans to May 10, 2013 to comply with SPCC rule amendments promulgated since July 2002 ( 76…
- Last published:
-
If a facility is grandfathered, is it also exempt from the requirement that feedstocks must be renewable biomass?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Even if a facility is exempt from the 20% GHG reduction requirement, in order to generate RINs, the facility is still required to use feedstocks that meet the definition of renewable biomass. The definition of renewable fuel in…
- Last published:
-
Are Canadian facilities included in the grandfathering provision? Does the grandfathering provision extend to facilities that commenced production up to December 31, 2009?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . The grandfathering provisions apply equally to facilities inside and outside the RFS program area. Facilities that commenced construction (as defined in §80.1403(a)(4)) prior to December 19, 2007, and which satisfy the timely construction requirements of §80.1403(c)(1) and (2)…
- Last published:
-
PE certification and applying PE's seal
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) must certify a facility’s SPCC Plan. In order to certify an SPCC plan, must a PE apply his seal to the plan, or is the PE’s signature on a certification statement sufficient for SPCC purposes? For…
- Last published:
-
Table 1 in 80.1426 does not include a coal fired ethanol plant. If a coal fired plant can be demonstrated as "grandfathered-in," can we assume the ethanol produced will have a D code of 6?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Per 80.1403(c), all facilities (including coal-fired facilities) for which construction commenced prior to December 19, 2007 and which completed construction within 36 months without an 18 month hiatus in construction may qualify for grandfathered status regardless of the…
- Last published: