Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
-
Renovations Covered by the RRP Rule
Total results: 84
- Testing Painted Components Total results: 6
- Child-Occupied Facilities Total results: 5
- Definition of "Renovation" Total results: 17
- Emergency Renovations Total results: 5
- In General Total results: 9
- Minor Repair and Maintenance Activities Total results: 14
- Opt-Out Provision Total results: 1
- Renovations for Compensation Total results: 7
- Target Housing Total results: 18
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 300 Subpart J Total results: 1
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 10 of 10 results
-
Criteria for oil production facilities to be qualified facilities
Qualified facilities are eligible for streamlined regulatory requirements in 40 CFR §112.6, which include self-certification of SPCC Plans. What criteria do oil production facilities have to meet in order to be considered qualified facilities? Oil production facilities, like all other facilities, must meet the criteria in §112.3(g)(1) or (2) to…
- Last published:
-
If a certified inspector or risk assessor determines that a component was installed post-1978 and is therefore free of lead-based paint, can the renovation firm rely on this determination?
Yes, as long as the renovation firm has obtained a copy of the determination. The firm must retain a copy of the determination for three years after completion of the renovation. Question Number: 23002-18218 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
SPCC compliance dates for farms
What are the Spill Prevention, Control, and Countermeasure (SPCC) compliance dates for farms? On November 22, 2011, EPA amended the date by which certain farms must prepare, or amend, and implement their SPCC Plans to May 10, 2013 to comply with SPCC rule amendments promulgated since July 2002 ( 76…
- Last published:
-
Is a lead-based paint inspection sufficient to determine compliance with requirements of the RRP rule?
Question: Is a lead-based paint inspection, performed by a certified inspector or risk assessor, that includes a written determination that various building components are free of paint or other surface coatings containing lead equal to or in excess of 1.0 milligrams per square centimeter (mg/cm2) or 0.5% by weight sufficient…
- Last published:
-
When testing a property for the presence of lead prior to beginning a renovation using an EPA-recognized lead test kit, must I test every component affected by the renovation?
Answer: Yes. Because certified renovator training does not cover sampling protocols, certified renovators using EPA-recognized lead test kits or performing paint chip sampling to determine the applicability of the RRP Rule must test each and every component that will be affected in order to determine that the RRP Rule does…
- Last published:
-
PE certification and applying PE's seal
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) must certify a facility’s SPCC Plan. In order to certify an SPCC plan, must a PE apply his seal to the plan, or is the PE’s signature on a certification statement sufficient for SPCC purposes? For…
- Last published:
-
Products authorized for use on oil discharges
Does EPA maintain a list of products that are authorized for use on oil discharges? If so, how can a manufacturer have their product included on the list? Section 311(d)(2)(G) of the Clean Water Act (CWA) directs EPA to prepare a schedule of dispersants, other chemicals, and oil spill mitigating…
- Last published:
-
I am an owner/agent for an apartment community built prior to 1978. In 2004, testing of a random sample of units were negative for lead paint but positive for lead dust. With the positive lead dust result, are we required to comply with the RRP Rule?
No. As long as the determination that the units are free of lead-based paint was made by an inspector or risk assessor certified by EPA or by an authorized State or Tribal program, renovations in the building are not covered by the Lead Renovation, Repair, and Painting (RRP) Rule…
- Last published:
-
If a property is tested by a certified renovator, inspector, or risk assessor and found to be free of lead-based paint, does any testing need to be done again if work is done on the property several years later?
Where a certified renovator uses an EPA-recognized lead test kit or performs paint chip sampling to determine that a component is free of lead-based paint, or a lead-based paint free determination is made by a certified inspector or risk assessor, firms performing renovations on the same components may rely on…
- Last published:
-
I’m a certified renovator using an EPA-recognized lead test kit to determine whether or not I have to follow the Lead Renovation Repair and Painting (RRP) Rule lead-safe work practices. What components must test negative for lead-based paint in order to qualify for the exclusion in 40 CFR 745.82(a)(2)?
Generally, a certified renovator using an EPA-recognized lead test kit must test each building component to be disturbed. The only exception to this requirement is when the components make up an integrated whole. In such a case, one or more component(s) may represent a system of components, unless it is…
- Last published: