Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.6 Qualified Facilities Total results: 4
- Miscellaneous SPCC Total results: 8
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 20 results
-
Visit and examination requirements for SPCC self-certification
Pursuant to 40 CFR §112.6, the owner or operator of a facility that meets the criteria in §112.3(g) for either a Tier I or Tier II qualified facility may self-certify the facility's SPCC Plan. As part of the self-certification, the owner or operator must certify that he or she has…
- Last published:
-
Tier2 Submit software and confidential chemical location information
When using EPA’s Tier2 Submit software to comply with the annual Hazardous Chemical Inventory reporting requirement under the Emergency Planning and Community Right-to-Know Act (EPCRA) §312, how can a person withhold confidential chemical location information from disclosure to the public? In order to fulfill the proper reporting under EPCRA, a…
- Last published:
-
Do states require extra Tier II information?
Do states require additional information on the Tier II report? How can I find out about the state data requirements? Some states do want additional Tier II information; contact your state Tier II administrator to learn specific details. Tier2 Submit includes fields for the additional information requested or required by…
- Last published:
-
No Street Address Availability Tier II Reporting
Pursuant to 40 CFR 370.42(d) , Tier II chemical inventory information must include the complete name and address of the location of the facility (including the full street address or state road, city, county, State and zip code), latitude and longitude. If a facility does not have a street address…
- Last published:
-
Availability of electronic SPCC Plan template
Part 112, Appendix G to prepare an SPCC Plan. Is the Tier I qualified facility SPCC Plan template available in an electronic version? EPA has made available electronic versions of the Tier I qualified facility Plan template to help the owner or operator of a Tier I qualified facility develop…
- Last published:
-
What changes did EPA finalize to the SPCC Rule in December 2006?
The revised rule modifies requirements for facilities with smaller oil storage capacity and specific types of oil-filled operating equipment. If a facility has 10,000 gallons or less in aggregate aboveground oil storage capacity and the facility meets the oil discharge history criteria, then an owner/operator of a facility may prepare…
- Last published:
-
SPCC change in ownership
If there is a change in ownership at a facility, can the facility operate under the same SPCC Plan without the certification from a professional engineer (PE)? If no change in procedures has been made, it may still be feasible to operate under the existing SPCC Plan. The information in…
- Last published:
-
Liability of oil retailers at SPCC regulated farm
If a farm is out of compliance of Spill Prevention, Control, and Countermeasure (SPCC) regulations and is checked by EPA and/or has a spill, is the retailer that filled the tank liable? No, EPA considers the oil tank owner responsible for lack of compliance.
- Last published:
-
Entering Alternative Storage Types and Pressure and Temperature Conditions on Tier II Form
EPA provides a list of storage types and conditions for pressure and temperature in the instructions for the paper Tier II form and as dropdown menus in Tier2 Submit. Are facilities required to use the storage types and conditions that EPA provides, or can facilities provide different values? Facilities are…
- Last published:
-
Attaching Site Plan Using Tier2 Submit
Tier2 Submit does allow a user to attach and submit a site plan with the Tier II inventory information. However, before using Tier2 Submit to submit a site plan, the facility should check with the relevant State or Tribal Emergency Response Commission ( SERC or TERC ) and/or their state…
- Last published:
-
Range Code or Specific Weight for Maximum Amount and Average Daily Amount on Tier II Form
When submitting Emergency Planning and Community Right-to-Know Act (EPCRA) Section 312 Tier II reports, does the owner or operator of the facility need to enter a specific weight in pounds for the maximum amount and the average daily amount of a certain hazardous chemical present at the facility, or should…
- Last published:
-
PE certifying a technical amendment
Except as provided in 40 CFR §112.6 for qualified facilities, a Professional Engineer (PE) must certify all technical amendments to an existing SPCC Plan (§112.5(c)). When certifying a technical change to an existing SPCC Plan, does the PE have to inspect and certify the entire Plan or only the amended…
- Last published:
-
Tier2 Submit validation error due to incorrect CAS number
What do I do if I get a validation error in Tier2 Submit due to an incorrect Chemical Abstracts Service (CAS) number? Your CAS number should be typed exactly as it appears on the substance's SDS. Review your safety data sheet (SDS) to see if the CAS number was typed…
- Last published:
-
Completing Tier II Forms When Information Has Not Changed
Pursuant to 40 CFR 370.42(c) and (r) , an owner or operator submitting federal Emergency Planning and Community Right-to-Know Act (EPCRA) Tier II inventory information must indicate if the facility or chemical information is identical to that submitted last year. If the facility or chemical information is the same as…
- Last published:
-
Tier I qualified facility template use under Part 112
In the 2008 Amendments to the SPCC Rule, EPA provided a template for the owner or operator of a Tier I qualified facility to create an SPCC Plan. Does EPA require a Tier I qualified facility to use the template in 40 CFR Part 112, Appendix G? Does EPA allow…
- Last published: