Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.6 Qualified Facilities Total results: 4
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 18
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 15 results
-
Why hasn’t the Norwood Landfill Site been identified as a Superfund Site? Two nearby landfills, Folcroft and Clearview, which were established and in use at the same time as Norwood Landfill and Dump have both been designated as Superfund sites.
EPA is still conducting its investigation of the Norwood Landfill Site to determine if it should be placed on the National Priorities List (NPL), or Superfund List. Thus far, the data collected has not demonstrated that the site warrants placement on the NPL. Both the Folcroft and Clearview Landfills went…
- Last published:
-
Visit and examination requirements for SPCC self-certification
Pursuant to 40 CFR §112.6, the owner or operator of a facility that meets the criteria in §112.3(g) for either a Tier I or Tier II qualified facility may self-certify the facility's SPCC Plan. As part of the self-certification, the owner or operator must certify that he or she has…
- Last published:
-
What is a site assessment and what is the difference between a site assessment and a site investigation?
The first step of the site assessment process is known as a preliminary assessment (PA). This assessment gathers historical and other readily available information on site conditions and surroundings to evaluate whether the site poses a potential threat to human health and the environment and/or whether further investigation is needed…
- Last published:
-
Availability of electronic SPCC Plan template
Part 112, Appendix G to prepare an SPCC Plan. Is the Tier I qualified facility SPCC Plan template available in an electronic version? EPA has made available electronic versions of the Tier I qualified facility Plan template to help the owner or operator of a Tier I qualified facility develop…
- Last published:
-
Are the NO Values in the MOVES Output Files Actually NO (Molecular Weight 30), or is the NO Expressed as NO2 (Molecular Weight 46)?
See More Frequent Questions about MOVES and Related Models . The NO values in all versions of MOVES2014 (and MOVES2010b) output files are expressed as NO2 (molecular weight 46). HONO and NOx are also expressed in terms of NO2.
- Last published:
-
Why did EPA wait so long to begin its investigation of the Norwood Landfill and Old Norwood Dump?
In the months leading up to the preliminary assessment, EPA gathered information on the property to determine whether a site investigation under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) was warranted. EPA determined to proceed with an investigation and EPA began procuring contractor services to conduct the preliminary…
- Last published:
-
What is the key question EPA tries to answer through a site investigation?
Findings of the site investigation determine what hazardous substances may be present, whether they may be released to the environment, and any potential threat to human health. Information about the site that is collected in the preliminary assessment and site investigation phase helps EPA to evaluate the risks posed by…
- Last published:
-
What is the Difference Between Extended Idling and Normal Idling? Is it Possible to get Distinct Idling Emission Output for any Vehicle Type? Can this be Done in the Emission Rate Mode, or only Inventory Mode?
See More Frequent Questions about MOVES and Related Models . Extended idling is a distinct emission process defined as the overnight idling of long-haul trucks with sleeper cabs at truck stops and other locations during federally required downtime. During such idling periods, these engines experience unusual loads (televisions, air conditioning…
- Last published:
-
How does MOVES Classify Light-Duty Trucks?
See More Frequent Questions about MOVES and Related Models . There are two definitions used in MOVES for light duty trucks. The source use type light duty trucks (sourceTypeID values of 31 or 32) use the Federal Highway Administration (FHWA) VM-1 definition of light duty vehicles used to report vehicle…
- Last published:
-
What is the Relationship Between Calendar Year, Model Year, and Age?
See More Frequent Questions about MOVES and Related Models . Model year (modelYearID) corresponds to the year that a group of vehicles in the fleet was produced. Calendar year (yearID) is the analysis year as selected in the ‘Time Spans/Year’ panel of the MOVES GUI. For a given calendar year…
- Last published:
-
Tier I qualified facility template use under Part 112
In the 2008 Amendments to the SPCC Rule, EPA provided a template for the owner or operator of a Tier I qualified facility to create an SPCC Plan. Does EPA require a Tier I qualified facility to use the template in 40 CFR Part 112, Appendix G? Does EPA allow…
- Last published:
-
What is the Meaning of the MOVESScenarioID Field? What Conditions Must User-Defined MOVESScenarioIDs Meet?
See More Frequent Questions about MOVES and Related Models . The MOVESScenarioID is merely text that is used to label the output rows resulting from a MOVES rates run and is defined in the Scale Panel of the MOVES GUI. You can enter any text you like, as long as…
- Last published:
-
How are the Number of Weekdays and Weekend Days in each Month Determined in MOVES?
See More Frequent Questions about MOVES and Related Models . For any given month, MOVES assumes that 5 out of every 7 days in the month are ‘weekdays’ and 2 out of every 7 of days in the month are ‘weekend days.’ For example, MOVES assumes that January has (5/7)*31…
- Last published:
-
What is Vehicle Specific Power (VSP)?
See More Frequent Questions about MOVES and Related Models . It is an estimate of the power demand on the engine during driving. It is calculated using the second-by-second speed values in a driving schedule, along with information about the type of vehicle being operated. The VSP is used by…
- Last published:
-
Difference between an SPCC Tier I and Tier II qualified facility
In the SPCC regulations in 40 CFR Part 112, what is the difference between a Tier I and Tier II qualified facility? How did EPA establish the multi-tiered approach for qualified facilities? A Tier II qualified facility is one that has an aggregate aboveground oil storage capacity of 10,000 U.S…
- Last published: