Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
-
Lead
Total results: 401
- Applying for Certification or Accreditation Total results: 22
- EPA/HUD Real Estate Notification & Disclosure Rule Total results: 27
- General Information About Lead Total results: 9
- Lead-Based Paint Program Fees Total results: 9
- Lead Abatement, Risk Assessment and Inspection Total results: 49
- Lead at Superfund Sites Total results: 3
- Lead in Drinking Water Total results: 25
- Lead in Products Total results: 1
-
Lead Renovation, Repair and Painting
Total results: 237
- Authorized State and Tribal Programs Total results: 3
- Enforcement and Inspections Total results: 5
- Firm Certification Total results: 26
- General Information about the Lead Renovation, Repair, and Painting (RRP) Rule Total results: 18
- Information for Do-It-Yourselfers Total results: 1
- Lead-Safe Certified Firm Logo Total results: 8
- Pre-Renovation Education Total results: 26
- Recordkeeping and Reporting Requirements Total results: 6
- Renovations Covered by the RRP Rule Total results: 84
- Renovator Certification and Training Total results: 12
- Training Provider Accreditation Total results: 7
- Work Practice Standards Total results: 41
- Testing for Lead Total results: 19
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.6 Qualified Facilities Total results: 4
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 18
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Displaying 1 - 15 of 22 results
-
Visit and examination requirements for SPCC self-certification
Pursuant to 40 CFR §112.6, the owner or operator of a facility that meets the criteria in §112.3(g) for either a Tier I or Tier II qualified facility may self-certify the facility's SPCC Plan. As part of the self-certification, the owner or operator must certify that he or she has…
- Last published:
-
How do I Obtain the Populations for Each of the MOVES Source Types?
See More Frequent Questions about MOVES and Related Models . To output vehicle populations, when setting up your RunSpec select the "Inventory" calculation type from the Scale panel and the "Population" activity option from the General Output panel of the MOVES GUI. The movesactivityoutput table in your MOVES output database…
- Last published:
-
How are Counties Mapped to Fuel Regions in MOVES? How Can I Substitute Alternate Fuel Formulations?
See More Frequent Questions about MOVES and Related Models . The RegionCounty table in the MOVES default database maps each county to a MOVES fuel region (defined by regionCodeID). If you are conducting a County or Project Scale Run, you do not need to modify this table to use alternate…
- Last published:
-
Who is responsible for controlling dust and debris from renovation waste once the waste container or truck used to transport the waste leaves the renovation site?
When a renovation firm transports waste from renovation activities, the firm must contain the waste to prevent release of dust and debris. The Lead Renovation, Repair and Painting (RRP) Rule does not address the responsibilities of other entities. EPA recommends consulting with state and local waste disposal authorities to learn…
- Last published:
-
Availability of electronic SPCC Plan template
Part 112, Appendix G to prepare an SPCC Plan. Is the Tier I qualified facility SPCC Plan template available in an electronic version? EPA has made available electronic versions of the Tier I qualified facility Plan template to help the owner or operator of a Tier I qualified facility develop…
- Last published:
-
For purposes of cleaning the work area following a renovation, is the interior floor of a garage considered interior or exterior space?
In general, the interior floor of a garage is considered an interior space for purposes of post-renovation cleanup. EPA recognizes the fact that it may occasionally be impossible for firms to meet all of the cleaning and verification requirements under the Rule for garage floors such as those that are…
- Last published:
-
If a renovator uses the required practices to remove containment and clean a work area, then performs successful cleaning verification, can the project then be done using uncertified workers and without work practices required by the RRP Rule?
Yes, as long as the balance of the project can be completed without disturbing a painted surface. Question Number: 23002-18385 Find a printable PDF copy of all frequent questions pertaining to lead .
- Last published:
-
How does the Fuel Wizard Determine which Fuel Formulations to Modify?
See More Frequent Questions about MOVES and Related Models . The Fuel Wizard only works on fuel formulations that are in your county database (CDB) and it "edits" them to comply with the alterations you provide. If you wish to create a set of alternate fuels, you will need to…
- Last published:
-
Where Does EPA Obtain Default Vehicle Miles Traveled (VMT)?
See More Frequent Questions about MOVES and Related Models . MOVES gets default national vehicle miles traveled (VMT) values from the Highway Performance Monitoring System (HPMS) of the Federal Highway Administration, which collects VMT information from every state. Although this is a good source of consistent total VMT information, the…
- Last published:
-
How Do I Create my Own I/M Program Input Table Using the "Create Template" Option?
See More Frequent Questions about MOVES and Related Models . If you already have an I/M program in your area, you should always begin by exporting the default I/M program in MOVES, reviewing it, making any changes to the default program, and re-importing it, rather than trying to fill a…
- Last published:
-
Where Can I Find Default HPMSBaseYearVMT Values for a Specific County?
See More Frequent Questions about MOVES and Related Models . MOVES does calculate default values for VMT for each calendar year for each county. Since these values are calculated, they are not found in any table in the default database. If you wish to obtain the default estimates, you will…
- Last published:
-
Why Does the "hourvmtfraction" Table in the MOVES Default Database Include Fractions for roadTypeID 1 (off-network)?
See More Frequent Questions about MOVES and Related Models . The original concept for MOVES assumed that there would be some vehicle miles traveled (VMT) not accounted for in the other four road types. This remaining VMT would be accounted for in roadTypeID=1. As the model developed, it was decided…
- Last published:
-
Can Programs Other Than Microsoft Excel be Used to Edit Input Database Files?
See More Frequent Questions about MOVES and Related Models . Yes. In addition to MS Excel files, in the County Data Manager/Project Data Manager, MOVES can read in other file types using ASCII text and comma separated variables.
- Last published:
-
My firm is replacing windows on a pre-1978 home. The homeowner already scraped and repainted their house but did not follow lead-safe work practices, leaving paint chips scattered throughout the landscaping. How best should I proceed?
A firm working on a property that is already contaminated with paint chips, dust, debris and residue must proceed by containing the work area for the renovation, and complying with all cleaning requirements under the Lead Renovation, Repair and Painting (RRP) Rule for that work area. Paint chips, dust, debris…
- Last published:
-
Under the RRP Rule, do paint chips and debris need to be removed from protective sheeting even if such chips and debris can be effectively contained by the sheeting or the sealed container the sheeting is contained in for disposal?
Yes. After the renovation has been completed, the firm must clean the work area until no dust, debris, or residue remains. The first cleaning step required by the Lead Renovation, Repair, and Painting (RRP) Rule is to collect all paint chips and debris and, without dispersing any of it, seal…
- Last published: