Search Frequent Questions
Filter By:
- Butte Area/Silver Bow Creek Total results: 17
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Renewable Biomass Total results: 8
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Grandfathering Total results: 8
- Registration Total results: 25
- Reinstating RINs Total results: 4
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.6 Qualified Facilities Total results: 4
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 29 results
-
Visit and examination requirements for SPCC self-certification
Pursuant to 40 CFR §112.6, the owner or operator of a facility that meets the criteria in §112.3(g) for either a Tier I or Tier II qualified facility may self-certify the facility's SPCC Plan. As part of the self-certification, the owner or operator must certify that he or she has…
- Last published:
-
Do settlement communications, such as past “agreements in principle,” impact the implementation of the final Consent Decrees?
The parties are bound by the terms of the various final, publicly available consent decrees. These consent decrees were made available for public comment before they were finalized and entered by the Court. Past settlement communications and documents created in the course of settlement discussions have been incorporated (or not)…
- Last published:
-
What is the Confidentiality Order?
The Confidentiality Order (Order) is a court order entered by the Federal District Court for the District of Montana (Court) on August 8, 2002, and amended by the Court on December 31, 2003, that applies to Superfund settlement negotiations in the Clark Fork River Basin, including the following sites: Silver…
- Last published:
-
How does EPA ensure that the potentially responsible parties complete their work?
All cleanup activities performed by the PRPs are subject to enforcement instruments (i.e., consent decrees or administrative orders) that provide for EPA approval of all deliverables and oversight of all work performed by the PRPs.
- Last published:
-
Availability of electronic SPCC Plan template
Part 112, Appendix G to prepare an SPCC Plan. Is the Tier I qualified facility SPCC Plan template available in an electronic version? EPA has made available electronic versions of the Tier I qualified facility Plan template to help the owner or operator of a Tier I qualified facility develop…
- Last published:
-
What are the recordkeeping requirements for a renewable fuel producer that uses used cooking oils and fats as feedstocks for renewable fuel?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Renewable fuel producers using used cooking oils or animal wastes as feedstocks are required under 40 CFR 80.1454(d)(3) to obtain from their feedstock supplier, and maintain in their records, documents which certify that the feedstock meets the definition…
- Last published:
-
Can you explain who has authority over the active mine vs the Superfund site?
The Montana Department of Environmental Quality has regulatory authority over the active mine. EPA is the lead agency for the Silver Bow Creek/Butte Area Superfund Site and works in consultation with MDEQ to ensure the cleanup of the Site.
- Last published:
-
Where can I go to learn more?
PitWatch.org is the online home of the Berkeley Pit Public Education Committee. This volunteer committee educates residents, students, and the public about the environmental management of the Berkeley Pit. Information includes the geology, hydrology, current events, and ongoing academic research associated with the Berkeley Pit. This committee frequently shares their…
- Last published:
-
When will construction begin in the Silver-Bow Creek Corridor?
Construction in the Silver Bow Creek corridor began in 2024 with the Grove Gulch Project.
- Last published:
-
Why is the Confidentiality Order important?
The Confidentiality Order (Order) has been, and continues to be, effective in assisting the parties in reaching settlements under the framework established by the Court in US v. ARCO and still pending in court – six consent decrees to date have been entered since the Order was issued. There are…
- Last published:
-
What materials from non-federal forestlands meet the definition of renewable biomass in RFS?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Slash and pre-commercial thinnings from non-federal forestland that is not ecologically sensitive forestland qualify as renewable biomass for purposes of RFS. Slash is defined in 40 CFR 80.1401 as the residue, including treetops, branches and bark, left on…
- Last published:
-
How does the "active management" requirement in the definition of renewable biomass apply to land that changes status in the future?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . In RFS2, EPA has interpreted the EISA requirement that existing agricultural land be "cleared or cultivated at any time prior to [December 19, 2007] and actively managed or fallow and nonforested" to apply to land that existed as…
- Last published:
-
Why were the consent decree negotiations under a confidentiality order?
The confidentiality order was issued by the federal district court in 2002 to encourage and facilitate settlement negotiations. The court determined that the confidentially order was appropriate to ensure that the parties were afforded the opportunity to engage in frank, open discussion so that litigation could be settled promptly and…
- Last published:
-
What projects has EPA been involved with in Butte related to the Superfund site?
A variety of actions and activities have been implemented to address the contamination in Butte, including: Assessments of risk have been conducted to quantify actual and potential human health risks due to potential exposure to tailings, waste rock, yard soils, indoor dust, attic dust, mercury vapor, surface water, and ground…
- Last published:
-
Does a renewable fuel producer have to report and maintain records on the feedstocks for every batch of renewable fuel they produce?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . All renewable fuel producers must report and maintain records concerning the type and amount of feedstocks used for each batch of renewable fuel produced (see 80.1451(b)(1)(ii)(K) and 80.1454(b)(3)(vi)). With regard to the renewable biomass recordkeeping and reporting requirements…
- Last published: