Search Frequent Questions
Filter By:
- Butte Area/Silver Bow Creek Total results: 17
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Environmental testing results Total results: 8
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.6 Qualified Facilities Total results: 4
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 29 results
-
How can I get help interpreting well sampling results?
Residents requesting Columbiana County water well sample results or assistance interpreting results taken by AECOM or Stantec laboratories can email ( [email protected] ). Additionally, a toxicologist is available to answer questions at 800-222-1222. Columbiana County residents near East Palestine with drinking water wells can request sampling by calling 330-849-3919. Pennsylvania…
- Last published:
-
Is the air monitoring equipment detecting chemicals of concern?
Yes, the air monitoring and sampling equipment are capable of detecting many chemicals of concern in the community and currently detections are below levels of concern. Some of the monitoring equipment may not detect a portion of the chemicals at lower levels–specifically n-butyl acrylate. However, there are independent tools used…
- Last published:
-
Is anybody sampling State Line Lake and the pond near the derailment site?
Norfolk Southern collects daily samples from the surface water near the derailment site, north of the tracks. State Line Lake flows through a wetland area and into the surface water area where the samples are taken. The agencies are reviewing all surface water results and Norfolk’s proposed plan for characterizing…
- Last published:
-
Visit and examination requirements for SPCC self-certification
Pursuant to 40 CFR §112.6, the owner or operator of a facility that meets the criteria in §112.3(g) for either a Tier I or Tier II qualified facility may self-certify the facility's SPCC Plan. As part of the self-certification, the owner or operator must certify that he or she has…
- Last published:
-
What is the status of the sampling data from Leslie Run and Sulphur Run?
Sediment sampling in Leslie and Sulphur Run is complete. The data generated by this work are being evaluated and compared to human health and ecological risk threshold criteria. That will lead to a determination about whether additional actions will be required and what those actions should be.
- Last published:
-
Do settlement communications, such as past “agreements in principle,” impact the implementation of the final Consent Decrees?
The parties are bound by the terms of the various final, publicly available consent decrees. These consent decrees were made available for public comment before they were finalized and entered by the Court. Past settlement communications and documents created in the course of settlement discussions have been incorporated (or not)…
- Last published:
-
What is the Confidentiality Order?
The Confidentiality Order (Order) is a court order entered by the Federal District Court for the District of Montana (Court) on August 8, 2002, and amended by the Court on December 31, 2003, that applies to Superfund settlement negotiations in the Clark Fork River Basin, including the following sites: Silver…
- Last published:
-
How does EPA ensure that the potentially responsible parties complete their work?
All cleanup activities performed by the PRPs are subject to enforcement instruments (i.e., consent decrees or administrative orders) that provide for EPA approval of all deliverables and oversight of all work performed by the PRPs.
- Last published:
-
Availability of electronic SPCC Plan template
Part 112, Appendix G to prepare an SPCC Plan. Is the Tier I qualified facility SPCC Plan template available in an electronic version? EPA has made available electronic versions of the Tier I qualified facility Plan template to help the owner or operator of a Tier I qualified facility develop…
- Last published:
-
How is the sediment sampling in Leslie and Sulphur Run different than the eco-assessment?
The main purpose of sediment sampling is to understand the extent of sediment contamination in Sulphur and Leslie Run. The eco-assessment, however, focuses on the potential uptake of contaminants in fish and other organisms.
- Last published:
-
Can you explain who has authority over the active mine vs the Superfund site?
The Montana Department of Environmental Quality has regulatory authority over the active mine. EPA is the lead agency for the Silver Bow Creek/Butte Area Superfund Site and works in consultation with MDEQ to ensure the cleanup of the Site.
- Last published:
-
Where can I go to learn more?
PitWatch.org is the online home of the Berkeley Pit Public Education Committee. This volunteer committee educates residents, students, and the public about the environmental management of the Berkeley Pit. Information includes the geology, hydrology, current events, and ongoing academic research associated with the Berkeley Pit. This committee frequently shares their…
- Last published:
-
When will construction begin in the Silver-Bow Creek Corridor?
Construction in the Silver Bow Creek corridor began in 2024 with the Grove Gulch Project.
- Last published:
-
Why is the Confidentiality Order important?
The Confidentiality Order (Order) has been, and continues to be, effective in assisting the parties in reaching settlements under the framework established by the Court in US v. ARCO and still pending in court – six consent decrees to date have been entered since the Order was issued. There are…
- Last published:
-
Why were the consent decree negotiations under a confidentiality order?
The confidentiality order was issued by the federal district court in 2002 to encourage and facilitate settlement negotiations. The court determined that the confidentially order was appropriate to ensure that the parties were afforded the opportunity to engage in frank, open discussion so that litigation could be settled promptly and…