Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Prior to Cleaning Total results: 3
- Water Management Update Total results: 9
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.6 Qualified Facilities Total results: 4
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.7 General Requirements Total results: 17
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 16 results
-
Visit and examination requirements for SPCC self-certification
Pursuant to 40 CFR §112.6, the owner or operator of a facility that meets the criteria in §112.3(g) for either a Tier I or Tier II qualified facility may self-certify the facility's SPCC Plan. As part of the self-certification, the owner or operator must certify that he or she has…
- Last published:
-
Will there be an increase in turbidity (cloudiness or muddiness) or silt in the streams?
The increased flow from this work is expected to be minimal and should not impact turbidity or silt.
- Last published:
-
Will returning the natural flow of water to Sulphur Run disturb areas with sheen?
Conditions in the streams are much improved because of previous cleanup work conducted in 2023. Although oily sheens remain, they are settled in the sediment and do not impact surface water unless disturbed. The increased water flow to Sulphur Run will be minimal and is not expected to disturb sheen…
- Last published:
-
Availability of electronic SPCC Plan template
Part 112, Appendix G to prepare an SPCC Plan. Is the Tier I qualified facility SPCC Plan template available in an electronic version? EPA has made available electronic versions of the Tier I qualified facility Plan template to help the owner or operator of a Tier I qualified facility develop…
- Last published:
-
What is the status of the cleanup at the site?
In October 2023, it was announced that the excavation work, which removed the known areas of contaminated soil at the derailment site, was complete. The soil double-check work has been ongoing for months and is expected to continue into the fall. The timeline of our expected completion plans for final…
- Last published:
-
When can we access the streams again?
The upcoming cleanup efforts will focus on oil-based compounds which, based on recent sampling, are the only derailment-related contaminants remaining in the creeks. Please obey all posted signage and continue to avoid access in Sulphur and Leslie Runs until further notice.
- Last published:
-
What has changed?
For the past several months as the collected wastewater has gone through the system, sample results have shown that the wastewater meets the standards set for vinyl chloride and other derailment-caused contaminants without treatment, meaning it can be disposed of as non-hazardous waste. Testing of the collected wastewater will continue…
- Last published:
-
Why collect the rainwater and snowmelt around the derailment site?
Until excavation work and confirmatory sampling are completed, any wastewater collected from the derailment site is considered a “listed hazardous waste” because it may have come into contact with vinyl chloride or other hazardous contaminants from the derailment. Even though the soil contamination has been removed, our double-check work is…
- Last published:
-
What do I have to do in preparation for the cleaning?
Cleaning crews will not move any of your personal belongings, including furniture or appliances. To ensure the most thorough cleaning of your home or place of business, please clear countertops and other surfaces, and limit excess clutter. Norfolk Southern will provide a few boxes if needed to allow for easy…
- Last published:
-
What is the status of the cleanup work in the streams?
There is still more work to be done in Leslie and Sulphur Runs. EPA and Ohio EPA are reviewing the Norfolk Southern sediment mitigation workplan. More cleaning will likely start before April and is expected to continue through July.
- Last published:
-
Will someone explain the process to me so that I can decide if I want cleaning?
During your pre-cleaning interview, representatives from EPA and Norfolk Southern will explain the cleaning process, assess time and resource needs, answer questions, and if desired schedule a cleaning date.
- Last published:
-
When will water no longer need to be collected to be returned to Sulphur Run?
We anticipate in the next two-to-four weeks, this work will start in sections of the derailment site. Soil analysis during the double-check phase is needed to remove the hazardous waste listing from the collected wastewater. Data are showing that water flowing over or through sections of the derailment area do…
- Last published:
-
Why treat the collected water?
Water collected at the site has the potential to have come into contact with vinyl chloride and other contaminants from the derailment. After the collected wastewater is treated it is then tested, and if it is not hazardous, can be disposed of as non-hazardous waste.
- Last published:
-
Tier I qualified facility template use under Part 112
In the 2008 Amendments to the SPCC Rule, EPA provided a template for the owner or operator of a Tier I qualified facility to create an SPCC Plan. Does EPA require a Tier I qualified facility to use the template in 40 CFR Part 112, Appendix G? Does EPA allow…
- Last published:
-
How will a cleaning date be scheduled?
A scheduling specialist will contact you to find a date and time for a pre-cleaning interview at your home or place of business.
- Last published: