Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- E15 comments Total results: 1
- Registration Total results: 9
- Diesel Sulfur Program Total results: 7
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
- Renewable Fuel Standard (RFS2) Total results: 111
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 29 results
-
How often does a facility need to complete an oil spill response training under the FRP requirements?
Facilities subject to the Facility Response Plan (FRP) regulations in 40 CFR Part 112, Subpart D are required to develop a facility response training program to train those personnel involved in oil spill response activities (§112.21(b)). How often does a facility need to complete an oil spill response training under…
- Last published:
-
What is a significant and substantial harm facility?
Some substantial harm facilities may meet the criteria for a significant and substantial harm facility. After you have prepared and submitted your FRP, the RA may determine that your facility has the potential, not just for substantial harm, but for significant and substantial harm. If the RA makes that determination…
- Last published:
-
PE certification for an FRP if an SPCC impracticability determination is made
If the owner or operator of a facility subject to the SPCC regulations determines that the installation of any of the specified secondary containment structures or equipment is not practicable and accordingly provides in the facility’s SPCC Plan an oil spill contingency plan following the provisions of 40 CFR Part…
- Last published:
-
In a situation where an importer leases tankage from another company, e.g., from a for-hire terminal, who must register such import facility, the company that owns the terminal, the importer that leases the tankage, or both?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Under § 80.2(r), an importer is defined as "a person who imports gasoline or gasoline blending stocks or components from a foreign country into the United States...." Accordingly, it is the importer of the gasoline, and not the…
- Last published:
-
If my fuel is already registered with the Fuels and Fuel Additives program under 40 CFR Part 79, do I still need to register with the RFS2 program under 40 CFR Part 80?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. Even if your fuel or fuel additive is already registered under 40 CFR Part 79, there are additional registration requirements for parties regulated under the RFS2 program, as specified in 40 CFR 80.1450.
- Last published:
-
Once I register my fuel for the RFS2 program under §80.1450, do I still need to register my fuel under 40 CFR Part 79?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Yes. Renewable fuels intended for use or used in motor vehicles are required to be registered under 40 CFR part 79 prior to any introduction into commerce. Manufacturers of renewable fuels and fuel additives not registered under part…
- Last published:
-
Elements to include in Facility Response Plan
What key elements should I include in my Facility Response Plan? As you prepare your FRP, be sure that your plan includes the following elements: Emergency Response Action Plan (an easily accessible stand-alone section of the overall plan) including the identity of a qualified individual with the authority to implement…
- Last published:
-
What are the FRP recordkeeping requirements?
What FRP recordkeeping requirements must I satisfy? You must maintain the response plan at your facility, along with plan updates reflecting material changes. You must also keep a log of response training drills and exercises. Records of inspections of response equipment must be kept for five years. If you determine…
- Last published:
-
Under FRP, what is the definition of a qualified individual?
The FRP regulations require facilities to prepare an emergency response action plan and identify a qualified individual that has full authority, including contracting authority, to implement removal actions (40 CFR §112.20(h)(i)). What is the definition of a qualified individual? The relevant statute, CWA 311(j)(5)(C)(ii) requires that the plan identify the…
- Last published:
-
If I certify a nonroad flexible-fuel engine under 40 CFR Part 1054, are owners and operators prohibited from using gasoline-ethanol blended fuels containing greater than 10 volume percent ethanol under 80.1504(a)(1) in my nonroad flexible-fuel engine?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . No, owners and operators of nonroad engines, vehicles, and equipment where the nonroad engine is certified under 40 CFR Part 1054 as a flexible-fuel engine are not prohibited from using gasoline-ethanol blended fuels containing greater than 10 volume…
- Last published:
-
Does EPA consider it a conflict of interest for a third-party company to assist a group of renewable fuel producers and importers of renewable fuel to help meet the requirements of the re-registration and engineering review pursuant to section 80.1450?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . EPA does not restrict a renewable fuel producer or an importer of renewable fuel from seeking a third-party company to assist them in meeting the re-registration and engineering review requirements pursuant to section 80.1450. The renewable fuel producer…
- Last published:
-
Will common carriers be required to register their transport trucks as oxygenate blending facilities?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Normally, only the owner of the gasoline produced at an oxygenate blending operation must register as an oxygenate blender. If a common carrier blends gas in trucks that it owns it must meet all of the requirements for…
- Last published:
-
Is the licensed professional engineer conducting the engineering review required to perform the site visit in person, or can they delegate the site visit to another person who maybe assisting them in the engineering review?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Pursuant to §80.1450(b)(2), all verifications must be performed by the licensed professional engineer conducting the engineering review. This requirement includes conducting the site visits. The licensed professional engineer conducting the engineering review must perform the site visits to…
- Last published:
-
FRP Site Plans with Varying Storage Contents
The Facility Response Plan regulations require subject facilities to prepare and maintain a site plan diagram that includes, among other things, the contents of bulk oil storage tanks, drum oil storage areas, and surface impoundments ( 40 CFR Part 112 Appendix F ). When the contents of these storage units…
- Last published:
-
SPCC Qualified Facilities Substantial Harm Criteria Certification
Are SPCC qualified facilities required to complete and maintain a copy of the Certification of the Applicability of the Substantial Harm Criteria form located in Appendix C of 40 CFR Part 112? Yes, all SPCC regulated facilities, including qualified facilities, that do not meet the criteria of a substantial harm…
- Last published: