Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Purpose Total results: 6
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Waste disposal and containment Total results: 13
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
-
Fuel Program
Total results: 693
- Diesel Sulfur Program Total results: 7
- E15 comments Total results: 1
- Fuels and Fuel Additives (FFARs) Total results: 2
- Gasoline Sulfur Program Total results: 17
- Other Total results: 6
- Reformulated Gasoline and Anti-Dumping Total results: 431
- Registration Total results: 9
- Registration and Reporting under 40 CFR 79 Total results: 19
- Renewable Fuel Standard (RFS1) Total results: 67
-
Renewable Fuel Standard (RFS2)
Total results: 111
- Reinstating RINs Total results: 4
- Application of standards Total results: 4
- Assignment of pathways to renewable fuel Total results: 4
- Foreign producers and importers Total results: 2
- Generation of RINs Total results: 6
- Grandfathering Total results: 8
- Registration Total results: 25
- Renewable Biomass Total results: 8
- Renewable fuel definitions Total results: 1
- Renewable volume obligations Total results: 3
- Reporting Total results: 37
- Treatment of biomass-based diesel Total results: 3
- Reporting Total results: 22
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
- Oil Regulations Total results: 96
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
Remove all filtersDisplaying 1 - 15 of 29 results
-
How often does a facility need to complete an oil spill response training under the FRP requirements?
Facilities subject to the Facility Response Plan (FRP) regulations in 40 CFR Part 112, Subpart D are required to develop a facility response training program to train those personnel involved in oil spill response activities (§112.21(b)). How often does a facility need to complete an oil spill response training under…
- Last published:
-
What is a significant and substantial harm facility?
Some substantial harm facilities may meet the criteria for a significant and substantial harm facility. After you have prepared and submitted your FRP, the RA may determine that your facility has the potential, not just for substantial harm, but for significant and substantial harm. If the RA makes that determination…
- Last published:
-
What is defined as a structure (home or place of business)?
While generally defined as a building, a structure under the structural cleaning program will include only those habitable spaces where indoor occupancy is frequent and regularly occurring on a daily or near-daily basis. Examples of residential structures include primary residences and living spaces, and examples of commercial structures include offices…
- Last published:
-
Why is cleaning of homes and places of businesses happening?
Norfolk Southern, with EPA oversight, is providing indoor cleaning to eligible occupants in response to concerns about the impact of the derailment and cleanup work on homes and places of businesses. The cleaning is to address potential dust that may have been generated as part of the train derailment and…
- Last published:
-
May I generate RINs that I produced and sold for non-road use in the past so that I can reinstate those RINs under RFS2?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Section 80.1426(c)(2) provides that RINs are assigned to a volume of renewable fuel when ownership of the RIN is transferred along with ownership of the volume of renewable fuel. A comparable provision appear in the RFS1 regulations, at…
- Last published:
-
What work still needs to be done at the derailment site?
Although contaminated soil has been excavated and removed from the derailment site, some additional work remains. Soil sampling continues to check all areas where cleanup operations took place. Stream assessments continue, and culvert clean out has started. Groundwater and drinking water sampling also continues. Expect these investigations and possible additional…
- Last published:
-
PE certification for an FRP if an SPCC impracticability determination is made
If the owner or operator of a facility subject to the SPCC regulations determines that the installation of any of the specified secondary containment structures or equipment is not practicable and accordingly provides in the facility’s SPCC Plan an oil spill contingency plan following the provisions of 40 CFR Part…
- Last published:
-
Does this mean my home or place of business is contaminated?
No. However, indoor cleaning is being offered to address potential dust emissions that may have been generated as part of the train derailment and cleanup work. This service is being offered as an additional service to interested members of the community.
- Last published:
-
May I generate RINs for renewable fuel that I produced and sold for non-motor vehicle use in the past so that I can reinstate those RINs under RFS2?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . No. RINs that were previously generated in 2009 and 2010 may be reinstated if they were retired for non-motor vehicle use. However, RINs may not be generated for renewable fuel produced in the past in order to retire…
- Last published:
-
Elements to include in Facility Response Plan
What key elements should I include in my Facility Response Plan? As you prepare your FRP, be sure that your plan includes the following elements: Emergency Response Action Plan (an easily accessible stand-alone section of the overall plan) including the identity of a qualified individual with the authority to implement…
- Last published:
-
What are the FRP recordkeeping requirements?
What FRP recordkeeping requirements must I satisfy? You must maintain the response plan at your facility, along with plan updates reflecting material changes. You must also keep a log of response training drills and exercises. Records of inspections of response equipment must be kept for five years. If you determine…
- Last published:
-
Under FRP, what is the definition of a qualified individual?
The FRP regulations require facilities to prepare an emergency response action plan and identify a qualified individual that has full authority, including contracting authority, to implement removal actions (40 CFR §112.20(h)(i)). What is the definition of a qualified individual? The relevant statute, CWA 311(j)(5)(C)(ii) requires that the plan identify the…
- Last published:
-
In addition to 2009 RINs, may a party reinstate 2008 and 2010 RINs that were retired for non-road use under RFS1?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Pursuant to §80.1429(g), any 2009 RINs that were retired for non-motor vehicle, heating oil or jet fuel use under RFS1 may be reinstated under RFS2. The regulations do not allow 2008 RINs to be reinstated. Since RFS1 RINs…
- Last published:
-
How does a retiring party reinstate RFS1 RINs that were retired because renewable fuel was ultimately used for non-motor vehicle, heating oil or jet fuel purposes? What steps are required to be taken and do any codes require changing?
See More Frequent Questions about Fuels Registration, Reporting, and Compliance Help . Pursuant to §80.1429(g), parties may reinstate 2009 RINs that were retired under RFS1 because the renewable fuel was ultimately used in a non-motor vehicle application, heating oil or jet fuel. As stated in question 11.1, since RFS1 RINs…
- Last published:
-
FRP Site Plans with Varying Storage Contents
The Facility Response Plan regulations require subject facilities to prepare and maintain a site plan diagram that includes, among other things, the contents of bulk oil storage tanks, drum oil storage areas, and surface impoundments ( 40 CFR Part 112 Appendix F ). When the contents of these storage units…
- Last published: