Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
- East Palestine, Ohio Train Derailment Total results: 148
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- 40 CFR Part 112.20 Facility Response Plans
- 112.8 Specific Onshore Requirements (Excluding Production)
Displaying 1 - 15 of 22 results
-
How often does a facility need to complete an oil spill response training under the FRP requirements?
Facilities subject to the Facility Response Plan (FRP) regulations in 40 CFR Part 112, Subpart D are required to develop a facility response training program to train those personnel involved in oil spill response activities (§112.21(b)). How often does a facility need to complete an oil spill response training under…
- Last published:
-
What is a significant and substantial harm facility?
Some substantial harm facilities may meet the criteria for a significant and substantial harm facility. After you have prepared and submitted your FRP, the RA may determine that your facility has the potential, not just for substantial harm, but for significant and substantial harm. If the RA makes that determination…
- Last published:
-
How do the changes in the 2006 Amendments apply to mobile refuelers?
Mobile refuelers are now exempt from the following sized secondary containment provisions that still apply to all other bulk storage containers and mobile/portable bulk storage containers: • Sections 112.8(c)(2) and (11) for petroleum oils • Sections 112.12(c)(2) and (11) for animal fats and vegetable oils These provisions previously required sized…
- Last published:
-
SPCC Rule schedules for inspections, tests, and evaluations
The SPCC rule requires inspections, tests, and evaluations of above ground containers (40 CFR §112.8(c)(6)). Does the rule set schedules for how often these need to be conducted? The SPCC Rule does not prescribe a specific frequency or methodology for performing the required inspections, evaluations, and tests for aboveground containers…
- Last published:
-
PE certification for an FRP if an SPCC impracticability determination is made
If the owner or operator of a facility subject to the SPCC regulations determines that the installation of any of the specified secondary containment structures or equipment is not practicable and accordingly provides in the facility’s SPCC Plan an oil spill contingency plan following the provisions of 40 CFR Part…
- Last published:
-
Elements to include in Facility Response Plan
What key elements should I include in my Facility Response Plan? As you prepare your FRP, be sure that your plan includes the following elements: Emergency Response Action Plan (an easily accessible stand-alone section of the overall plan) including the identity of a qualified individual with the authority to implement…
- Last published:
-
Are mobile refuelers exempt from integrity testing requirements?
Pursuant to 40 CFR §112.8(c)(2), mobile refuelers are exempt from the secondary containment requirements for bulk storage containers. Are mobile refuelers also exempt from the requirements for integrity testing in §112.8(c)(6)? Since mobile refuelers are mobile or portable bulk storage containers, the other provisions of §112.8(c) still apply. Therefore, mobile…
- Last published:
-
What are the FRP recordkeeping requirements?
What FRP recordkeeping requirements must I satisfy? You must maintain the response plan at your facility, along with plan updates reflecting material changes. You must also keep a log of response training drills and exercises. Records of inspections of response equipment must be kept for five years. If you determine…
- Last published:
-
Under FRP, what is the definition of a qualified individual?
The FRP regulations require facilities to prepare an emergency response action plan and identify a qualified individual that has full authority, including contracting authority, to implement removal actions (40 CFR §112.20(h)(i)). What is the definition of a qualified individual? The relevant statute, CWA 311(j)(5)(C)(ii) requires that the plan identify the…
- Last published:
-
FRP Site Plans with Varying Storage Contents
The Facility Response Plan regulations require subject facilities to prepare and maintain a site plan diagram that includes, among other things, the contents of bulk oil storage tanks, drum oil storage areas, and surface impoundments ( 40 CFR Part 112 Appendix F ). When the contents of these storage units…
- Last published:
-
SPCC Qualified Facilities Substantial Harm Criteria Certification
Are SPCC qualified facilities required to complete and maintain a copy of the Certification of the Applicability of the Substantial Harm Criteria form located in Appendix C of 40 CFR Part 112? Yes, all SPCC regulated facilities, including qualified facilities, that do not meet the criteria of a substantial harm…
- Last published:
-
What is a Facility Response Plan?
According to the Clean Water Act (CWA), as amended by the Oil Pollution Act (OPA), certain facilities that store and use oil are required to prepare and submit plans to respond to a worst case discharge of oil and to a substantial threat of such a discharge. EPA has established…
- Last published:
-
What are the requirements of EPA's Facility Response Plan Rule?
According to OPA, an owner or operator of a “substantial harm” facility must develop and implement an FRP. A “substantial harm” facility is a facility that, because of its location, could reasonably be expected to cause substantial harm to the environment by discharging oil into or on navigable waters or…
- Last published:
-
What is the purpose of a Facility Response Plan?
The FRP helps an owner or operator develop a response organization and ensure the availability of response resources (i.e., response equipment, trained personnel) needed to respond to an oil discharge. The FRP should also demonstrate that the response resources are available in a timely manner, thereby reducing a discharge’s impact…
- Last published:
-
Criteria for significant and substantial harm facility designation
How do I know if my facility is a significant and substantial harm facility? Your facility may be a significant and substantial harm facility if it meets the over water transfer criterion, has a total oil storage capacity of one million gallons or more, and meets one or more of…