Search Frequent Questions
Filter By:
- Air Emissions Inventories Total results: 34
- Asbestos Total results: 141
- Butte Area/Silver Bow Creek Total results: 17
- Coronavirus (COVID-19) Total results: 33
-
East Palestine, Ohio Train Derailment
Total results: 148
- Waste disposal and containment Total results: 13
- About the Cleaning Process Total results: 10
- About the East Palestine Train Derailment Total results: 13
- After Cleaning Total results: 3
- Air testing Total results: 2
- Assistance with Child Care and Pets During Cleaning Total results: 2
- Chemicals of concern and associated health impacts Total results: 8
- Eligibility Total results: 7
- Environmental Sampling and Monitoring Total results: 7
- Environmental testing results Total results: 8
- Exposure to chemicals in the air, soil and water (dioxins) Total results: 18
- Formaldehyde Total results: 1
- Impacts to the environment Total results: 1
- Livestock and pet health impacts Total results: 1
- Odors and toxicity Total results: 2
- Personal Belonging During Cleaning Total results: 6
- Physical work updates, road closures, and upcoming public meetings Total results: 3
- Prior to Cleaning Total results: 3
- Purpose Total results: 6
- Relocation Assistance Total results: 2
- Residential soil sampling and water testing Total results: 10
- Taggart Street Reopening Total results: 12
- Tax-exempt Total results: 1
- Water Management Update Total results: 9
- Emergency Planning and Community Right-to-Know Total results: 301
- Fuel Program Total results: 693
- Great Lakes Funding Total results: 92
- Lead Total results: 401
- MOVES Total results: 57
- Norwood Landfill Site Total results: 30
-
Oil Regulations
Total results: 96
- 40 CFR Part 112.20 Facility Response Plans Total results: 19
- 40 CFR Part 110 Discharge of Oil Regulation Total results: 9
-
40 CFR Part 112 Spill Prevention, Control, and Countermeasure Rule
Total results: 65
- 112.8 Specific Onshore Requirements (Excluding Production) Total results: 3
- 112.1 Applicability Total results: 18
- 112.2 Definitions Total results: 12
- 112.3 Requirement to Prepare an SPCC Plan Total results: 3
- 112.6 Qualified Facilities Total results: 4
- 112.7 General Requirements Total results: 17
- Miscellaneous SPCC Total results: 8
- 40 CFR Part 300 Subpart J Total results: 1
- Miscellaneous Oil Total results: 2
- Permitting Under the Clean Air Act Total results: 19
- Radiation Total results: 1
- Risk Management Program (RMP) Total results: 285
- Southeast Minnesota Groundwater Total results: 11
Active filters:
- Waste disposal and containment
- 40 CFR Part 112.20 Facility Response Plans
- 112.8 Specific Onshore Requirements (Excluding Production)
Displaying 1 - 15 of 35 results
-
How is waste leaving the derailment site tracked?
EPA on-scene coordinators are assigned to track liquid–and solid–waste trucks entering and leaving the derailment site. They log every truck, oversee the loading and covering of waste, truck washing and weighing, and the proper placement of placards. Responders take pictures throughout the process. All trucks go to approved and regulated…
- Last published:
-
What happens after the track work is completed?
The track work has been the highest priority to remove most contamination as early as possible. This, plus preventing the spread of contamination by capturing water from the site and constructing a bypass of Sulphur Run around the site will continue into June. While track work and water management continue…
- Last published:
-
How often does a facility need to complete an oil spill response training under the FRP requirements?
Facilities subject to the Facility Response Plan (FRP) regulations in 40 CFR Part 112, Subpart D are required to develop a facility response training program to train those personnel involved in oil spill response activities (§112.21(b)). How often does a facility need to complete an oil spill response training under…
- Last published:
-
What is a significant and substantial harm facility?
Some substantial harm facilities may meet the criteria for a significant and substantial harm facility. After you have prepared and submitted your FRP, the RA may determine that your facility has the potential, not just for substantial harm, but for significant and substantial harm. If the RA makes that determination…
- Last published:
-
How do the changes in the 2006 Amendments apply to mobile refuelers?
Mobile refuelers are now exempt from the following sized secondary containment provisions that still apply to all other bulk storage containers and mobile/portable bulk storage containers: • Sections 112.8(c)(2) and (11) for petroleum oils • Sections 112.12(c)(2) and (11) for animal fats and vegetable oils These provisions previously required sized…
- Last published:
-
What does the on-site wastewater treatment process on site entail?
EPA has approved a workplan to allow Norfolk Southern to treat hazardous wastewater on-site, removing vinyl chloride and other contaminants to dispose of the treated wastewater off-site as a non-hazardous waste. Currently, the train derailment site generates nearly one million gallons of wastewater per week from the collection of stormwater…
- Last published:
-
Where is the treated wastewater going?
The wastewater treatment system removes derailment contaminants using several steps, including sedimentation and filtration. The treated wastewater is then tested to verify vinyl chloride is below the drinking water standard. Once treated, water is sent to facilities certified to accept non-hazardous wastewater and that are regulated by federal and state…
- Last published:
-
Are there health risks to driving through Taggart Street?
There are no anticipated health risks along Taggart Street associated with project activities. As work proceeds, to ensure worker and community safety, the Unified Command will continue to evaluate site conditions for health and safety considerations. While traffic will be able to proceed through the work areas along Taggart Street…
- Last published:
-
How much waste was removed as part of the cleanup efforts?
In late October, EPA announced the completion of major derailment site excavation. Remaining contaminated soil and debris were removed for off-site treatment or disposal. Contact water continues to be treated in an on-site wastewater treatment system prior to removal for off-site disposal. As of November 13, over 174,000 tons of…
- Last published:
-
Are the trucks leaving the derailment site spreading contamination?
Each truck leaving the derailment site that is carrying contaminated waste is checked to ensure all material is safely secured. Also, all trucks go through a washing process before departing the site. The washing process ensures the vehicles’ wheels and undercarriage are free of dirt and mud. Street sweepers are…
- Last published:
-
SPCC Rule schedules for inspections, tests, and evaluations
The SPCC rule requires inspections, tests, and evaluations of above ground containers (40 CFR §112.8(c)(6)). Does the rule set schedules for how often these need to be conducted? The SPCC Rule does not prescribe a specific frequency or methodology for performing the required inspections, evaluations, and tests for aboveground containers…
- Last published:
-
PE certification for an FRP if an SPCC impracticability determination is made
If the owner or operator of a facility subject to the SPCC regulations determines that the installation of any of the specified secondary containment structures or equipment is not practicable and accordingly provides in the facility’s SPCC Plan an oil spill contingency plan following the provisions of 40 CFR Part…
- Last published:
-
What is the process for backfilling excavated areas at the derailment site?
Areas that were excavated as part of the derailment cleanup effort will be backfilled with clean soil. Before soil is chosen as backfill it is tested for chemicals and heavy metals. While the source of backfill is still being identified, some areas have been temporarily backfilled with ballast (large gravel)…
- Last published:
-
What are the large blue tanks at the derailment site?
As EPA continues overseeing cleanup work at the derailment site, two large blue lake tanks will reduce EPA’s on-site frac tank footprint. Frac tanks, for smaller quantities of liquid storage, have been used since the derailment to stage liquid before it is removed for off-site disposal.
- Last published:
-
Elements to include in Facility Response Plan
What key elements should I include in my Facility Response Plan? As you prepare your FRP, be sure that your plan includes the following elements: Emergency Response Action Plan (an easily accessible stand-alone section of the overall plan) including the identity of a qualified individual with the authority to implement…